Project Manager
Saudi Consulting Services
Total years of experience :26 years, 6 Months
Supervise, Manage and Lead the teamwork to complete the project in the planned time within the project budget and best quality for the Administration Building which built on an area of 3, 000 m2, comprising of 13 floors, with total area of 17, 833 m2, a Multipurpose Hall to accommodate 6, 000 spectators with a total area of 17, 568 m2 and Site work with total area of 100, 000 m2.
From : 05/05/2012 up to now
Position : Deputy Project Manager (Tabuk Five star Hotel)
Job objective : Attending weekly progress and technical meetings with the Contractors - Reviewing Coordination, Structural Work Shop drawings & Method statements - Responding to the Contractor’s clarifications and claims- Approving Material Submittals - Reviewing & Monitoring QA/QC Submittals & Requirements - Safety Monitoring - Construction Supervision (SR 450 millions)
From : 13/06/2010 up to 04/05/2012
Position : Resident Engineer-King Saud University-Boys Campus
objective : Construction Supervision for 4 buildings - (SR 1 Billion) :-
1- Business administration college.
2- Extension of Agriculture college.
3- Physical fitness college.
4- Sports Arena.
From :23/12/2008 up to 12/06/2010
Position : Structural Engineer (Asser municipality)
Job objective : Sharing in urban development process of Abha city by introducing the civil consultancy .
Study, Design and Construction Supervision for Buildings, Storm Sewers and Roads Projects of more than 2000 millions SR / year.
A- From June 2003 till Jan.2006
The Manager of Method of Construction Division, Supervisor of the following projects :-
1-Eloroba Tunnel & Elthawra Tunnel (Method Studies, Structural Workshop Drawings & Structural As-built Drawings) .
2-Hot and Cold Rolling Mill (Structural Workshop Drawings for Ground Slabs & Several Buildings) .
3-Greater Cairo Water Treatment Plant (Method Studies & Structural As-built Drawings) .
4-Greater Cairo Metro line 2 phase 2c (Method Studies) .
5-Conference Hall & Exhibition, Military Mill no.200 (Structural Workshop Drawings ) .
6-Steel Shed of Borg Elarab Stadium (Method Studies)
B- From Sep. 2002 till June 2003
Project title : Hot and Cold Rolling Mill
Responsibilities, duties & authority: (Method Studies, Structural Workshop Drawing’s Engineer)
C- From Nov.2001 till Sep. 2002
Project title : Greater Cairo Metro line 2 phase 2c
Responsibilities, duties & authority: Method Studies Engineer .
D- From June 2000 till Nov. 2001
Project title : Marsa Alam international Airport
Description : Project of 70 Million L.E. Cost, consists of Terminal Building, Ancillary Buildings & Housing Buildings .
Responsibilities, duties & authority: Preparing Structural Workshop Drawing’s for 38 buildings .
E- From June 1999 till June 2000
Project title : The Arab Contractors new head office
Responsibilities, duties & authority: Finishing Site Engineer
1-Designer of concrete & steel structures shared in :
a) ZAHRAE ELMADEY School
b) MOUBARAK-COOL (Extension of nursery school)
c) A lot of multi-storey residential buildings
d) Swimming pool project (A) (Ministry of the Interior)
2- Construction Supervision shared in :
a) Housing of Cairo University (24 towers)
b) Several projects in 6 Th. October City
Graduation Project : Structural Engineering with grade of Excellent