مجموع سنوات الخبرة :19 years, 7 أشهر

qc supervisor civil في combined group contracting company
  • الكويت
  • أشغل هذه الوظيفة منذ فبراير 2016

inspection and testing of daily activity site.
coordinating with clients for the inspection.

QC Inspector في kharafinational
  • الكويت
  • أشغل هذه الوظيفة منذ يوليو 2013

RESPONSIBILITIES:
• Receiving the drawings and work description chart (as per BOQ) from the contractor issuing authority and preparing the schedule for execution of work as per the planning with men, materials and machineries if any as per the requirement.
• Attending the daily review meetings, and submitting daily progress reports by the day wise schedules
• Inspecting for the leveling and surveying at site.
• Preparing Inspection format, RFI and coordinate with client QA/QC policy to be implemented during the course of Installation & erection.
• Inspection of shuttering, and centering for the concrete works in cast in situ programs and for pre-cast programs.
• Maintaining the quality of work at site, by inspecting the construction materials like sand, Course aggregates and fine aggregates, soil, steels, cement etc.
• Handling tests for the concrete in order to maintain the quality of the concrete and to retain the strength of the concrete.
• Submitting Request for Inspection to the clients for the inspection of work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• Generate NCR and submit to QA/QC manager for corrective actions/modifications and incorporating the same in as built drawings.
• Checking platform elevation, compaction and survey coordinate.
• Attend weekly meeting, weekly inspection of site, updating the work progress at Site and meeting with Supervisor Team.
• Conduct Training Program to mentioned QA/QC standard.
• Making daily quality control reports to update Project Manager
• Coordinate with client regarding QA/QC matters
• Monitoring of concrete slump test, temperature, air content etc...To be conducted by third party

Piping Supervisor في technip
  • المملكة العربية السعودية - الجبيل
  • ديسمبر 2011 إلى فبراير 2013

• Preparing work schedule as per drawing
• Fabrication for Pipe Spools and fittings at shops.
• Arranging the materials and monitoring of the materials usage at site as per requirements
• Follow Ups for Request for Inspection to the clients for the inspection of work.
• Monitoring of Daily work progress and Follow Up for the Delayed Work
• Preparation for Hydro testing of the partially completed line and testing.
• Pre-commissioning preparation for the tested line by re-instating the line with correct valve and gaskets etc…
• Attending daily review meetings and site reviews.
• Solving site issues by the site reviews and in presence of Field Engineering.
• Attend weekly meeting, weekly inspection of site, updating the work progress at Site and meeting with Supervisor Team.
• Coordinating with client engineers for inspection of works and supervising in redirect as correct.
• Coordinate with client regarding QA/QC matters

CIVIL ENGINEER في sendan International Company
  • المملكة العربية السعودية - الشرقية
  • أغسطس 2011 إلى ديسمبر 2011

• Preparing work schedule as per drawing
• Receiving the drawings and work description chart (as per BOQ) from the contractor issuing authority and preparing the schedule for execution of work as per the planning with men, materials and machineries if any as per the requirement.
• Attending the daily review meetings, and submitting daily progress reports by the day wise schedules
• Submitting Request for Inspection to the clients for the inspection of work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• Carrying the site documents and preparing documents of the work, this was completed as per the specification at BOQ and follow up of these for the approval by the client.
• Review and implement client standards and specifications (SAUDI ARRAMCO) intend for construction and Final handover of the Product.
• Attend weekly meeting, weekly inspection of site, updating the work progress at Site and meeting with Supervisor Team.
• Estimation of quantities of all civil works for the awarded project.
• Making daily quality control reports to update Project Manager
• Coordinate with client regarding QA/QC matters
• Preparation daily accomplishment report
• Coordinate with planning in the schedule work progress.
• Developing of the Drawings as interest of Client, and executing at site with approvals.

QC inspector CIVIL في al nasser trading and Cont.Est
  • المملكة العربية السعودية - الجبيل
  • يناير 2011 إلى يوليو 2011

• Receiving the drawings and work description chart (as per BOQ) from the contractor issuing authority and preparing the schedule for execution of work as per the planning with men, materials and machineries if any as per the requirement.
• Attending the daily review meetings, and submitting daily progress reports by the day wise schedules
• Inspecting for the leveling and surveying at site.
• Preparing Inspection format, RFI and coordinate with client QA/QC policy to be implemented during the course of Installation & erection.
• Inspection of molds for the execution purpose such as column boxes etc.
• Inspection of shuttering, and centering for the concrete works in cast in situ programs and for pre-cast programs.
• Maintaining the quality of work at site, by inspecting the construction materials like sand, Course aggregates and fine aggregates, soil, steels, cement etc.
• Handling tests for the concrete in order to maintain the quality of the concrete and to retain the strength of the concrete.
• Submitting Request for Inspection to the clients for the inspection of work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• Carrying the site documents and preparing documents of the work, this was completed as per the specification at BOQ and follow up of these for the approval by the client.
• Review and implement client standards and specifications (SAUDI ARRAMCO) intend for construction and Final handover of the Product.
• Raising Non Conformance Report (NCR) to workers if specification and standard are not followed in co-ordination of SABIC project management team (PMT).
• Generate NCR and submit to QA/QC manager for corrective actions/modifications and incorporating the same in as built drawings.
• Monitor in the platform preparation for piling activities Including excavation, backfilling and compaction.
• Checking platform elevation, compaction and survey coordinate.
• Attend weekly meeting, weekly inspection of site, updating the work progress at Site and meeting with Supervisor Team.
• Estimation of quantities of all civil works for the awarded project.
• Conduct Training Program to mentioned QA/QC standard.
• Making daily quality control reports to update Project Manager
• Coordinate with client regarding QA/QC matters
• Monitoring of concrete slump test, temperature, air content etc...To be conducted by third party
• Checking rebar preparation rebar caging installation and Pouring of concrete

SITE Engineer ( Underground piping and Utility Installation's) في GS Engineering and Construction
  • المملكة العربية السعودية - الشرقية
  • أكتوبر 2009 إلى ديسمبر 2010

• Study of Approved drawings and specifications.
• Preparation of the site requirements for the execution of work.
• Issuing the drawings for the execution of works to the subcontractor.
• Assisting subcontractor workforce in the execution of work.
• Supervising for the leveling and surveying at site.
• Monitoring of the work execution and updating the schedule.
• Review of drawing and rectification of drawing coordinating with project design team for solving the problems in site.
• Coordinating with the subcontractor supervisor’s and foremen’s to execute the work as per the project work specifications.
• Assisting to QA/QC for inspection of work, and rectification without comment.

Structural Supervisor في Mohammed Al mojil group
  • المملكة العربية السعودية - الشرقية
  • أكتوبر 2007 إلى أغسطس 2009

• Preparation for all kinds of execution work at site as per the approved drawings.
• Receiving the drawings and work description chart (as per BOQ) from the contractor issuing authority and preparing the schedule for execution of work as per the planning with men, materials and machineries if any as per the requirement.
• Attending the daily review meetings, and submitting daily progress reports by the day wise schedules, and preparing the subcontract piece work bill with the affected manpower’s.
• Supervising for the leveling and surveying at site.
• Preparation of molds for the execution purpose such as column boxes etc.
• Inspection of shuttering, and centering for the concrete works in cast in situ programs and for pre-cast programs.
• Preparing a weekly schedule for execution of works in supporting to complete work with minimum loss of time.
• Maintaining the quality of work at site, by inspecting the construction materials like sand, jelly, gravels, soil, steels, cement etc.
• Handling tests for the concrete in order to maintain the quality of the concrete and to retain the strength of the concrete.
• Submitting Request for Inspection to the clients for the inspection of work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• Making preliminary bill for the contractor with including site revisions and client instructions, and submitting it to the Contractor QA/QC dept's for running account bill purposes.
• Carrying the site documents and preparing documents of the work, which was completed as per the specification at BOQ and follow up of these for the approval by the client

Site Engineer CIVIL في mfar construction's pvt.Ltd
  • الهند
  • يوليو 2006 إلى أكتوبر 2007

• Preparation for all kinds of execution work at site as per the approved drawings.
• Receiving the drawings and work description chart (as per BOQ) from the contractor issuing authority and preparing the schedule for execution of work as per the planning with men, materials and machineries if any as per the requirement.
• Attending the daily review meetings, and submitting daily progress reports by the day wise schedules, and preparing the subcontract piece work bill with the affected manpower’s.
• Supervising for the leveling and surveying at site.
• Preparation of moulds for the execution purpose such as column boxes etc.
• Inspection of shuttering, and centering for the concrete works in cast in situ programs and for pre-cast programs.
• Preparing a weekly schedule for execution of works in supporting to complete work with minimum loss of time.
• Maintaining the quality of work at site, by inspecting the construction materials like sand, jelly, gravels, soil, steels, cement etc.
• Handling tests for the concrete in order to maintain the quality of the concrete and to retain the strength of the concrete.
• Submitting Request for Inspection to the clients for the inspection of work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• Making preliminary bill for the contractor with including site revisions and client instructions, and submitting it to the Contractor QA/QC dept.’s for running account bill purposes.
• Carrying the site documents and preparing documents of the work, this was completed as per the specification at BOQ and follow up of these for the approval by the client.

Site Engineer ( CIVIL STRUCTURE ) في Sree Ganesh Construction's, Pvt.Ltd
  • الهند
  • ديسمبر 2005 إلى يونيو 2006

• Study of drawings and revisions of issued drawings.
• Preparing Schedules for the work implementation.
• Handling reconnaissance survey and site survey to execute the work with as per approved drawing and site profiles.
• Preparation of moulds for the execution purpose such as column boxes etc.
• Mobilization of equipments such as dozer and excavation equipment for execution of works at location.
• Preparing a weekly schedule for execution of works in supporting to complete work with minimum loss of time.
• Preparing bar bending schedules for the fabrication and for the purpose of installation @ site and for the purpose of Quantity.
• Supervising the work at site with accordance of the issued and approved drawings with all necessary arrangements, like basically men, material, and machineries.
• After completion of the work, preparing the inspection notice for the client and it was submitted to the authority for prior inspection of the work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• After these procedure, preparation of the final document for the work completion certification.

Site Supervisor في Heritage Construction's
  • الهند
  • فبراير 2005 إلى ديسمبر 2005

• Mobilization of materials and labors.
• Arranging shelter arrangements for the labors.
• Reconnaissance of site for the construction activities, and preparation for the marking by leveling the proposed land to the described profile as per the approved drawing.
• Preparation of moulds for the execution purpose such as column boxes etc.
• Mobilization of equipments such as dozer and excavation equipment for execution of works at location.
• Preparing a weekly schedule for execution of works in supporting to complete work with minimum loss of time.
• Supervision of work at site as per the approved drawings and with suggestion of client.
• Submitting reports to the clients for the inspection of completed work.
• Coordinating with client engineers for inspection of work s and supervising in redirect as correct.
• Preparing final handing over reports for the client.

Site Supervisor في ABCO Group
  • الهند
  • مايو 2004 إلى يناير 2005

• Preparation and Revival of Execution drawings.
• Preparing estimation of proposed drawings.
• Reconnaissance of Site for the construction Activities.
• Making marking as according to the approved drawings to the exact.
• Mobilization of material to the location and implementation of Execution.
• Arranging labors to the prescribed job by the trade.
• Controlling labors in the work progressive period.
• Inspection of executed works as per the specification and approved drawings.
• Preparation of client bill as per the drawings and with revivals.
• Preparation of authority drawings and submission of final drawings to authority.

الخلفية التعليمية

دبلوم, Diploma in Civil Engineering
  • في Board of technical education, BANGLORE
  • مايو 2004

Specialties & Skills

AutoCAD
Civil Engineering
Primavera P6
Civil Works
Adobe Pagemaker
Staad Pro
Primavera P6
Auto CAD
Adobe Photoshope
BASIC COMPUTER APPLICATION

اللغات

العربية
متوسط
الانجليزية
متمرّس
الهندية
متمرّس
الملايام
متمرّس
الكانادا
متمرّس
التاميلية
متمرّس
التاغالوغية
متوسط
الأوردو
متوسط

التدريب و الشهادات

Proffesional Diploma in Primavera PPM (الشهادة)
تاريخ الدورة:
December 2008
صالحة لغاية:
February 2009