Senior electrical consultant
Shaker consultancy group
Total years of experience :16 years, 4 Months
Senior consultant
ETC contracting as an electrical technical manager experience at Management procurement, shop drawings, making projects estimation and statement, Design, technical office issues of Medium and low voltage installations, power networks and light current systems.
and giving hand to the project consultant and the owner representatives to get the statements and acceptance certificates for the projects.
DAR GROUP as a section head for electrical technical office, experience at Management, procurement, shop drawings, making projects estimation and statement, Design, technical office issues of Medium and low voltage installations, power networks and light current systems.
and giving hand to the project consultant and the owner representatives to get the statements and acceptance certificates for the projects.
Present : (10/2016 till now) working at KORRA ENERGI head office as a Senior electrical technical office engineer, Experience at Management, procurement, shop drawings, making projects estimation and statement, Design, technical office issues of Medium and low voltage installations, power networks and light current systems.
and giving hand to the project consultant and the owner representatives to get the statements and acceptance certificates for the projects.
(3/2015 till 10/2016) working at Amlak company in Zewail city for science and technology construction project as a site electromechanical technical office manager.
Experience at Management, procurement, shop drawings, making projects estimation and statement, Design, technical office issues of Medium and low voltage installations, power networks and light current systems.
and giving hand to the project consultant and the owner representatives to get the statements and acceptance certificates for the projects.
working as a senior electrical engineer for the electrical and electronics works for projects.
1- Buildings infrastructure, power networks and light current systems at the following sites
( king fahd military city marine center, Urban center in Abqeq, west dammam municipality)
2- Landscape (King fahd models, Dahran qashla & Jubail king saud & Abqeq Hfof intersections)
3- Street light poles (King fahd dahya contains 1000 poles fed through 35 power transformers)
Experience at Management, making projects estimation and statement, Design, technical office and execution of Medium and low voltage installations, power networks and light current systems.
and giving hand to the project consultant and the owner representatives to get the statements and acceptance certificates for the projects.
Two years experience (11/2010 to 1\2013) working at Kingdom of Saudia Arabia at Sraco company including:
One year experience (1/2012 to 1\2013) working as a project manager for operation and maintenance of the health science colleges at Dammam university responsible for the whole project electrical, communications and mechanical systems beside the financial and administration works, leading a team consists of 150 employees including engineers, administrator, accountant, supervisors, technicians.
Experience at Engineering Management.
One year experience (11/2010 to 12/2011) working as a Chief engineer for the electrical and electronics department of the Gulf cooperation council maternity and pediarity hospital in Dammam.
Experience at Electrical Substations, power networks, Medium voltage including 2 feeders,
Switch gears making four medium voltage loops, 14 Ring main units connecting four medium voltage loops through 14 Transformers each transformer capacity is 2500KVA three of them are dry transformers and the others are oil transformers, 4 ATS units, Synchronizing panels and load sharing units, Three CAT Stand by generators the capacity of each is 1.75MVA, 4 UPS’S the capacity of three of them are 60KVA and the other one is 120KVA, low voltage installations, automatic control for all hospital air conditioning system, automatic control of the system of water treatment pumps, Fire alarm system, light current systems and BMS (Building Monitoring System Siemens software ).
One year experience (11/2010 12/2011) working at Kingdom of Saudia Arabia at Sraco company
as an Chief engineer for the electrical and electronics department of the Gulf cooperation council
maternity and pediarity hospital in Dammam.
Experience at Electrical Substations, power networks, Medium voltage including 2 feeders,
Switch gears making four medium voltage loops, 14 Ring main units connecting four medium voltage loops through 14 Transformers each transformer capacity is 2500KVA three of them are dry transformer and the others are oil transformers, 4 ATS units, Synchronizing panels and load sharing units, Three CAT Stand by generators the capacity of each is 1.75MVA, 4 UPS’S the capacity of three of them are 60KVA and the other one is 120KVA, low voltage installations, automatic control for all hospital air conditioning system, automatic control of the system of water treatment pumps, Fire alarm system, light current systems and BMS (Building Monitoring System Siemens software ).
مدير تنفيذي كهرباء بقطاع الوتر فرونت مشروع بورتو السخنة المطل على خليج السويس(البحر الاحمر) الذي يتضمن شبكات الجهد المنخفض والتيار الخفيف ل 14 عمارة بها 546 شالية يتخللهم غرف الماكينات لثلاث حمامات سباحة بهم كشافات تحت الماء واللاند سكيب للقطاع بأكمله وتوصيل شبكة الجهد المتوسط المكون من خمس محولات 20000\380 قدرة اربعة منها 1ميجا ومحول واحد قدرته 1.5 ميجا.
مهندس صيانة كهربية وكونترول لماكينات طباعة المانية من انواع هايدلبرج وkba
شركة تعمل في مجال الخدمات البترولية على ابار حفر البترول والغاز الطبيعيى
وظيفتها قياس كل ما يتعلق بحالة بريمة الحفر وبئر البترول اثناء عملية الحفر.
جيد جدا في الفرقة الرابعة 76% وتقدير مشروع التخرج امتياز 98%