Key Result Areas:
• Responsible for all HVAC and electrical assets readiness in site
• Monitor monthly scheduled PPM and raise corrective maintenance task in case of any problem found in PPM
• Handled the team size of 10 Members
• Ensure the alternative equipment readiness all times to avoid delay in operations
• Providing assets reports and its working status to management on timely basis
• Raise, follow up, monitor and close tasks through CAFM application within the timeline
• Event support in all aspects like manpower arrangements on approval also during emergency support for events
• Material inspection as per the SOR and proceed with corrective maintenance task
• Having knowledge about Qatar Civil Defense (QCDD) inspection for building safety measures
• Ensure PTW for all maintenance tasks execution to ensure safety
• Selection of event DB, cable size, laying and routing
• Condition monitoring and maintenance of event DB’s before and after events
• Additional event lighting installation and condition monitoring during events
• Operation of LV, Switchgears, MCC, SDB and PDB at all levels
• Review event power SLD and update in case any amendments required as per site condition
• Event reporting before and after events, material inventory maintenance
• Providing / Dismantling temporary power provisions at stadium areas like Food & Beverages, VIP, VVIP, Media Tribune, Pitch and Broadcasting areas
• Emergency power provisions on demand at the time of events
Highlights:
• Administered daily work like breakdown, shutdown, preventive maintenance, performing troubleshooting, diagnosis & analysis of issues in equipment
• Installation, erection, testing and commissioning of PLC panel at SCADA control room
• Installation, erection, testing and commissioning of instrument JB’s, Remote operated shutoff valve (RSOV), RLTG, Deluge valves, pressure gauges, pressure transmitters, solenoid valves
• Installation, erection, testing and commissioning, operation & maintenance of MCC, 3.5T EOT crane
• Electrical and instrument cable laying, routing and terminations as per the cable schedules
• Installation, erection, testing, commissioning, operation and maintenance of 2*15KVA UPS and central battery system
• Client and designer interaction for design change to make as built drawings
• Responsible to obtain necessary work permits to ensures safety
• Providing daily DPR (Daily Progress Report) and update to Resident Manager
• Performing toolbox talks to contract employees on daily basis and handled team size of 10 Members
• Punch list clearance provided by client
Brownfield Project Detail:
• Balance work of Up-gradation of Fire Fighting System at Cauvery Asset - ONGC Central Tank Farm (CTF)
Highlights:
• Managed erection, installation, and commissioning activities at project site
• Responsible team member of contractor commercial negotiation talks for projects
• Handled team size of 6 Members
• Performed work as per project planning, project progress, ensured cost control for smooth workflow and timely completion of project
• Liaison work with local statutory authorities like Tamil Nadu Electricity Board (TNEB)
• Following LOTO procedures for de-energizing / energizing electrical equipment to carry out maintenance
• Operation & maintenance, troubleshooting, condition monitoring of electrical equipment, feeders, ETP-MCC, MCC, PCC, LDB as well as 110kV switchyard equipment, 33kV and 6.6kV indoor HT switchgears
• Responsible for cable lay & tray routing, earthing works for all rotary
• Approval of all work permits (cold hot and high elevation) as an acting safety officer
• Assured 100% availability of alternative equipment in case of breakdowns
• Operation and maintenance of:
o 1250kVA, 2*400kVA, 500kVA plant emergency DG sets, batteries
o 2*20KVA UPS system and central battery system
o Induction motors, panel feeder, starters like DOL and Star Delta starter
o ISBL and OSBL lightings
o Utility plants equipment like compressors, ETP, bunker lifts and 2T EOT crane
Brownfield Project Detail:
• Revamping of existing Epic Chlorohydrin plant to Propylene Oxide manufacturing plant
Highlights:
• Client: L&T Power Ltd.
Customer: Rajasthan RajyaVidyutUdpadan Nigam Ltd., Rajasthan (RRVUNL) 2*660MW Super Thermal Power Station, Chhabra Gour, Rajasthan Testing and commissioning of 11kV, 6.6kV, and 415V Switchgear and its associated equipment’s,
testing of LT motor, DOL modules, and test report preparation
• Client: Mukand Engineers Ltd.
Customer: Bharath Heavy Electricals Ltd. (BHEL), for Rajasthan RajyaVidyutUdpadan Nigam Ltd., Rajasthan (RRVUNL), 2*660MW Super Thermal Power Station, Suratgarh, Rajasthan Testing and Commissioning of 11kV, 6.6kV, and 415V
Switchgear and its associated equipment’s, testing of 275MVA Generator Transformer, HT Motor testing up to 17.5MW, testing of control and power circuits associated with LT / HT motors and its starting modules
• Client: Bajaj Electricals Ltd.
Customer: Madhya Pradesh Power Transmission Company Ltd. (MPPTCL), Govt. of Madhya Pradesh Testing & Commissioning of 132/33kV Sub-Station and Switchyard, 40/63MVA Power Transformer (Kotiya and Bhander Sub-Station) and test report preparation
Highlights:
• Timing test, Insulation Resistance test, Contact Resistance test in 433V LT Air Circuit Breakers and 11KV/33KV HT Vacuum Circuit Breakers
• Insulation Resistance test, Primary and Secondary injection test, Polarity test in Current Transformers
• Ratio test, Winding resistance test, Insulation resistance test in Power and distribution Transformers
• Testing of Over Current, Earth Fault Relays and checking of relay co-ordination with breaker during fault condition
Highlights:
• Servicing and Testing of Circuit Breakers up to 33kV VCB, OMCB, SF6 both indoor and outdoor types and 433V LT ACB breakers
• Testing of Current Transformers and Potential Transformers both panel and outdoor types
• Servicing and testing of oil and dry type distribution transformers up to 2500kVA
• OLTC servicing, Oil filtration works for transformers
• Scheme checking activities for LT and HT panels
• LT, HT cable healthiness checking, glanding and jointing works etc, .
Highlights:
Annual Routine testing of Power Transformers, Circuit breaker, Current Transformers, Over Current and Earth fault Relay testing, Protection Co-ordination checking, Primary and Secondary injection test, Report preparation and maintenance etc
Highlights:
• Operation and maintenance of 7.5MVA, 2KV/6.6KV distribution transformer with OLTC, 2000KVA, 6.6KV/433V distribution transformer with off load tap changer
• Operation and maintenance of 12KV, 1250A HT VCB and LT ACB up to 3000A
• Operation and maintenance of Blower and compressor motors, and conveyer belt induction motors with gears
• Operation and maintenance of Star delta starter and DOL starters etc
Bachelor Degree in Electrical and Electronics Engineering
Diploma in Electrical and Electronics Engineering
General Studies including Language, Science, Mathematics, History etc.