Naser M Al Baddah& Partner Gen. Trdg
Con. Co
مجموع سنوات الخبرة :20 years, 8 أشهر
I. From: 14-06-2013 to Present: 1.2 Years
Company: Naser M Al Baddah& Partner Gen. Trdg& Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
➢ Experienced in Construction of 11 KV substation, responsibilities include PTW for koc explaining the drawings, Experienced in erection of transformers, panels, cabling, and cable termination with Kuwait Oil Company ( K.O.C), Kuwait.
➢ Currently working as a. Electrical Forman for KOC "New distribution Network for North Kuwait ESP's project" ( Main Contractor Petrofac International)
GENERAL RESPONSIBILITIES
➢ Installation, testing and commissioning of High Voltage and Medium Voltage switchgears and its control panels, Transformers, RMUs, UPS, Fire alarm system, Security system.. Etc.
➢ Laying of HV/ LV cables through cable trays, Ladders, underground and making the end termination by using proper glands / outdoor kits.
➢ Experienced in HV/ LV cable joints.
I. From: 14-06-2013 to Present: 1.2 Years
Company: Naser M Al Baddah& Partner Gen. Trdg& Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
IV. From: 04-04 -2001 to 12-11-2001:0.6 Years
Company: Power Engineering Corporation (PEC QATAR)
Position: Electrical Charge Hand
Qatar FertiliserCo.As a supply for manpower during shutdown.
➢ Electrical installation and maintenance projectsHT < Transformer's, Motor
Drive Pumps / Compressor's / panels / cables / Fire Alarm Protection
system.
From: 01-03-1993 to 03-02-1997.: 3.11 Years
Company: Asea Brown Boveri Ltd (ABB)
Position: Sr. Electrician
➢ Power Generation segment, Vadodara, Gujarat. (ABB)
➢ Experienced in Electrical Maintenance of 11KV breakers, 33/11KV transformers, Medium Voltage switchgears, control panels., Motor Drive Pumps / Compressor's / Turbines / VSD / MOV/ standard running conditions of existing power distribution networks.
ENHANCEMENT TO BS-131 Project in Kuwait Oil Company (KOC) North Kuwait.
working as a. ELECTRICAL FOREMAN for KOC NEW BOOSTER STATION BS-132 ENHANCEMENT
project". ( Main Contractor SK Eng. & Construction Co.LTD)
III. From: 25-08-2003 to 10-05-2010: 6.9 Years
Company: BRITISH LINK KUWAIT.CO. W.L.L. KUWAIT. (BLK)
Position: Electrical Charge Hand
I. From: 14-06-2013 to Present: 1.2 Years
Company: Naser M Al Baddah& Partner Gen. Trdg& Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
➢ Experienced in Construction of 11 KV substation, responsibilities include PTW for koc explaining the drawings, Experienced in erection of transformers, panels, cabling, and cable termination with Kuwait Oil Company ( K.O.C), Kuwait.
➢ Currently working as a. Electrical Forman for KOC "New distribution Network for North Kuwait ESP's project" ( Main Contractor Petrofac International)
GENERAL RESPONSIBILITIES
➢ Installation, testing and commissioning of High Voltage and Medium Voltage switchgears and its control panels, Transformers, RMUs, UPS, Fire alarm system, Security system.. Etc.
➢ Laying of HV/ LV cables through cable trays, Ladders, underground and making the end termination by using proper glands / outdoor kits.
➢ Experienced in HV/ LV cable joints.
II. From: 30-08-2011 to 11-04-2013: 1.8 Years
Company: Naser M Al Baddah& Partner Gen.Trdg & Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
➢ Experienc in HV/MV Electrical installation and maintenance projects. Responsibilities
include Construction, Operation and Maintenance of 132/33/11KV substations BS-132
ENHANCEMENT TO BS-131 Project in Kuwait Oil Company (KOC) North Kuwait.
working as a. ELECTRICAL FOREMAN for KOC NEW BOOSTER STATION BS-132 ENHANCEMENT
project". ( Main Contractor SK Eng. & Construction Co.LTD)
III. From: 25-08-2003 to 10-05-2010: 6.9 Years
Company: BRITISH LINK KUWAIT.CO. W.L.L. KUWAIT. (BLK)
I. From: 14-06-2013 to Present: 1.2 Years
Company: Naser M Al Baddah& Partner Gen. Trdg& Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
➢ Experienced in Construction of 11 KV substation, responsibilities include PTW for koc explaining the drawings, Experienced in erection of transformers, panels, cabling, and cable termination with Kuwait Oil Company ( K.O.C), Kuwait.
➢ Currently working as a. Electrical Forman for KOC "New distribution Network for North Kuwait ESP's project" ( Main Contractor Petrofac International)
GENERAL RESPONSIBILITIES
➢ Installation, testing and commissioning of High Voltage and Medium Voltage switchgears and its control panels, Transformers, RMUs, UPS, Fire alarm system, Security system.. Etc.
➢ Laying of HV/ LV cables through cable trays, Ladders, underground and making the end termination by using proper glands / outdoor kits.
➢ Experienced in HV/ LV cable joints.
II. From: 30-08-2011 to 11-04-2013: 1.8 Years
Company: Naser M Al Baddah& Partner Gen.Trdg & Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
➢ Experienc in HV/MV Electrical installation and maintenance projects. Responsibilities
include Construction, Operation and Maintenance of 132/33/11KV substations BS-132
ENHANCEMENT TO BS-131 Project in Kuwait Oil Company (KOC) North Kuwait.
working as a. ELECTRICAL FOREMAN for KOC NEW BOOSTER STATION BS-132 ENHANCEMENT
project". ( Main Contractor SK Eng. & Construction Co.LTD)
III. From: 25-08-2003 to 10-05-2010: 6.9 Years
Company: BRITISH LINK KUWAIT.CO. W.L.L. KUWAIT. (BLK)
VI From: 08-06-1999 to 07-03-2001: 1.9 Years
Company: BSES Limited, Chennai.
Position: Electrical Supervisor
➢ Tidel park project Chennai.Worked as in 2500KVDG Electrification.
➢ Experienced inerectionEmergency Generator's 1450 KW, 3.3 KV with ATS
control. (Caterpillar / Cummins), panels, cabling, and cable terminations.
From: 08-04-1997 to 03-06-1999: 2.4 Years
Company: SPIC JEL Enginnring Limited.
Position: Electrical Forman
➢ GTEC Electrical power project, baruch, Gujarat. (655 MW ccpp)
➢ Experienced in Laying of HV/ LV cables through cable trays, Ladders, underground and making the end termination by using proper glands / outdoor kits. Also experienced in testing of 11KV XLPE and PILC cables,
From: Feb 1989 to March 1992.: 3.1 Years
Company: Asea Brown Boveri Ltd (ABB)
Position: Electrician
➢ Electrical project. Gandar power project (NTPC), Janoar, Baruch, Gujarat.
➢ Experienced in Lighting, cable trays, Installation of control panels, Transformers,
High Voltage and Medium Voltage switchgears, cabling, and cable terminations..
➢ Experienced in Construction of 11 KV substation, responsibilities include PTW for koc explaining the drawings, Experienced in erection of transformers, panels, cabling, and cable termination with Kuwait Oil Company ( K.O.C), Kuwait.
➢ Currently working as a. Electrical Forman for KOC "New distribution Network for North Kuwait ESP's project" ( Main Contractor Petrofac International)
GENERAL RESPONSIBILITIES
➢ Installation, testing and commissioning of High Voltage and Medium Voltage switchgears and its control panels, Transformers, RMUs, UPS, Fire alarm system, Security system.. Etc.
➢ Laying of HV/ LV cables through cable trays, Ladders, underground and making the end termination by using proper glands / outdoor kits.
➢ Experienced in HV/ LV cable joints.
II. From: 30-08-2011 to 11-04-2013: 1.8 Years
Company: Naser M Al Baddah& Partner Gen.Trdg & Con. Co. W.L.L. KUWAIT.
Position: Electrical Forman
➢ Experienc in HV/MV Electrical installation and maintenance projects. Responsibilities
include Construction, Operation and Maintenance of 132/33/11KV substations BS-132
Position: Electrical Charge Hand
Experience in HV/MV Electrical installation and maintenance projects.Assistance to the
Soldiers, Airman and marines of the United States Militaryfro25 August 2003 -10
May 2010 at Camp Buehring, Kuwait.& KBR.
Position: Electrical Charge Hand
Experience in HV/MV Electrical installation and maintenance projects.Assistance to the
Soldiers, Airman and marines of the United States Militaryfro25 August 2003 -10
May 2010 at Camp Buehring, Kuwait.& KBR.
➢ 33kv Siemens gas insulated switchgear (8DA /8DB) with vacuum
Circuit breaker.
➢ Commissioning of 12MVA 33/3.3Kv transformers and cables.
IV. From: 12-11-2001 to 25-05-2002: 0.6 Years
Company: Qatar Shell Pearl (GTL QATAR)
Position: ElectricalCharge Hand
➢ Qatar PetrolumCo.As a supply for manpower during shutdown.
➢ Experience with both motor and air operated valves, Have worked with NOx, and Conductivity analyzers., Pressure, Level, Temperature, pneumatics,
hydraulics, feedback control, Distributive Control Systems; Environmental,
Instrumentation includes Solar, Wind, Precipitation, Temperature, Relative
Barometric Pressure. Wind and SolaPowergeneration.
➢ Diploma in Electrical Engineeringfrom Luna Institute of Engineering kerala. ➢ I T I from National Trade Certificae (NTC) ➢ Air & Refrigeration, From The Indian Technical Education society, Bombay. ➢ Computer Application withproficiencyin, Windows 98, 2000, XP, Windows7&8, Office applications.