Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Tiberiu Nicolae Lascae, CHEMICAL PLANT CONTROL ROOM OPERATOR

Tiberiu Nicolae Lascae

CHEMICAL PLANT CONTROL ROOM OPERATOR·PETROTEL LUK-OIL S.A.

Romania

High school or equivalent, Petroleum and Petrochemical Processing

Work experience

Total years of experience: 10 years, 6 months

CHEMICAL PLANT CONTROL ROOM OPERATOR

October 2017 - Present

PETROTEL LUK-OIL S.A.

Ploiesti, Romania

October 2017 - Present

• Led and coordinated field operators during complex start-up, shut-down, and emergency procedures,
maintaining strict adherence to all safety rules and HSE instructions
• Managed operations of key installations including GTU, SRU, TGU, and SWS Units using a D.C.S-Emerson
type DeltaV system
• Directed process optimization by interpreting laboratory analysis results and making critical decisions to
ensure all products met quality specifications
• Oversaw revisions and overhauling activities of the entire plant, ensuring timely completion and minimal
disruption to production schedules
• Mentored and collaborated closely with field teams to assure proper execution of operation maneuvers and
continuous process improvement

Company industry:
Oil & Gas

LEAD TECHNOLOGIST ENGINEER & COMMISSIONING MANAGER

May 2026 - June 2026

PETROLINE

Arad, Romania

May 2026 - June 2026

Project Scope: Full-cycle commissioning, start-up, and process authority for an Atmospheric Distillation Unit
• Dual Technical & Operational Authority: Held simultaneous responsibility as both Lead Technologist Engineer
and Commissioning Manager, serving as the highest technical and operational reference on the project
• Process Authority: Defined and validated all operating targets, cut-points, heat and mass balances, and alarm
set-points, providing final sign-off on process performance and product quality
• Commissioning Leadership: Orchestrated the full transition from Cold Commissioning (leak testing, nitrogen
purging, loop checks) through Hot Start-up to stable on-spec production within 4 days of first hydrocarbon
introduction
• Safety Management: Chaired Pre-Startup Safety Reviews (PSSR) and managed SIMOPS operations, ensuring
zero-incident performance throughout the high-risk start-up phase
• DCS Configuration: Managed the DeltaV Distributed Control System during first feed, stabilizing PID loops and
fine-tuning pressure and temperature gradients to meet design basis
• SOP & ESD Development: Authored the complete suite of Standard Operating Procedures and Emergency
Shutdown protocols for a brand-new installation
• Stakeholder Management: Primary interface between EPC contractors, field crews, and project ownership,
resolving technical and operational conflicts in real time

Company industry:
Oil & Gas

COMMISSIONING MANAGER

March 2026 - June 2026

PETROLINE

Arad, Romania

March 2026 - June 2026

• Project Governance: spearheading the full-scale commissioning and operational readiness of an Atmospheric
Distillation Unit, ensuring 100% alignment with EPC contractual milestones.
• Systemization & Handover: Orchestrating the transition from Construction to Operations by managing the
Mechanical Completion (MC) process and verifying the Ready for Commissioning (RFC) status of all sub
systems.
• Strategic Safety Leadership: Chairing Pre-Startup Safety Reviews (PSSR) and managing SIMOPS (Simultaneous
Operations) to ensure zero-incident performance during the high-risk Hot Start-up phase.
• Asset Initialization: Directing the introduction of first hydrocarbons and stabilizing the plant into steady-state
production within a record 4-day window.
• Operational Readiness: Authoring and implementing a comprehensive suite of Standard Operating Procedures
(SOPs) and Emergency Shutdown (ESD) protocols for the new installation.
• Stakeholder Liaison: Serving as the primary interface between the Project Technologists, EPC contractors, and
site field crews to resolve real-time logic bottlenecks and technical misalignments.

Company industry:
Oil & Gas
Job role:
Management

PROJECT START-UP OPERATIONS LEAD

February 2026 - June 2026

PETROLINE

Arad, Romania

February 2026 - June 2026

Project Scope:
• Operational Leadership: Coordinate all operational activities, serving as the primary liaison between the
Technologist Engineer and the field crew
• System Initialization: Directed the transition from Cold Commissioning (leak testing, loop checks, and
nitrogen purging) to Hot Start-up, successfully introducing first hydrocarbons into the system
• DCS Configuration & Optimization: Managed the Distributed Control System (DCS) during the critical First
Feed phase, stabilizing PID loops and adjusting pressure/temperature gradients to reach steady-state
production
• Emergency & Technical Troubleshooting: Identified and resolved critical logic bottlenecks and mechanical
misalignments in real-time, preventing equipment damage and reducing downtime during the stabilization
phase
• SOP Development: Authored and implemented the initial Standard Operating Procedures (SOPs) for shift
handovers and emergency shutdown (ESD) protocols for a brand-new installation
• Production Quality: Led the team to achieve on-spec product quality within 4 days of start-up, meeting all
chemical and safety requirements set by the Technologist Engineer

Company industry:
Oil & Gas

CHEMICAL PLANT FIELD OPERATOR

January 2016 - October 2017

PETROTEL LUK-OIL S.A.

Ploiesti, Romania

January 2016 - October 2017

• Monitored and controlled all aspects of unit operations (static and dynamic equipment: Compressors, Pumps,
Columns, Reactors, Heaters, etc.), taking responsibility for equipment status
• Verified and maintained critical plant parameters (pressures, temperatures, flows, levels) within operational
limits

Company industry:
Oil & Gas

Education

University Petrol Gaze Ploiesti

July 2016

July 2016

High school or equivalent, Petroleum and Petrochemical Processing

Romania

Skills

COMMISSIONING
Intermediate
COMMISSIONING
Intermediate
COMPLIANCE TESTING
Intermediate
COMPLIANCE TESTING
Intermediate
COMPUTER AIDED ENGINEERING CAE
Intermediate
COMPUTER AIDED ENGINEERING CAE
Intermediate
DELTAV DISTRIBUTED CONTROL SYSTEM
Intermediate
DELTAV DISTRIBUTED CONTROL SYSTEM
Intermediate
DISTRIBUTED CONTROL SYSTEMS
Intermediate
DISTRIBUTED CONTROL SYSTEMS
Intermediate
MANAGEMENT
Intermediate
MANAGEMENT
Intermediate
PERFORMANCE MANAGEMENT
Intermediate
PERFORMANCE MANAGEMENT
Intermediate
PLANT COMMISSIONING
Intermediate
PLANT COMMISSIONING
Intermediate
PRODUCT QUALITY QA QC
Intermediate
PRODUCT QUALITY QA QC
Intermediate
STANDARD OPERATING PROCEDURE
Intermediate
STANDARD OPERATING PROCEDURE
Intermediate

Languages

English
Beginner

Training and Certifications

Certifications
B
H2S Removal and Sulfur Recovery Processes
IFP Training