Piping Engineer
PUNJ LLOYD
Total years of experience :14 years, 6 Months
at Block Valve Station and Compressor Station
• Supervising a team of engineers, project planners and admin staff..
• Review and finalize piping specifications, layouts and 3D model review.
• Assist in selection, review and approval of sub-contractors.
• Participating in numerous technical meetings with EPC contractor, client, and engineering consultant regarding basic and detailed documents, model reviews and safety standards.
• Reviewing tie-in documents of each points of pipeline
• Performing technical review of P&ID documents.
• Supervising production and manufacturing of pipeline and fittings.
• Performing technical reviews of basic and detail pipeline design documents.
• Providing technical supervision during construction of flow lines and production units.
• Developing all engineering drawings for scheduled project at maximum cost-effectiveness.
• Upheld all EH&S standards and regulations.
• Providing second-level technical support and in-process trouble shooting.
• Resolving all technical problems in engineering blueprints.
• Managing a wide variety of multidisciplinary programs and projects.
• Ensured effective project drafting in collaboration with consultants and contractors
Construction of atmospheric above ground storage tanks, shell plate erection on going by jacking method.
> Coordinating fabrication and erection activities for the tanks .
> Coordinating shell course shifting from fabrication yard to tank area.
> Preparation/ Coordination in getting approval of daily inspections from the client.
> Getting the mechanical clearance for testing, commissioning of all tanks.
> Supervise and manage the subcontractors for the construction of storage tanks and report to engineer.
> Monitoring the tankage job as per required by client
> Responsible for the tanks hydro test activities.
> Lead and coordinate with the QA/QC in all quality related aspects.
> Review the approval documents about Inspection Test Plan of the project to ensure inspection shall be in accordance with the required quality standard and procedures.
> Execute and submit inspection documentation works for static and rotating equipments to assure that the required forms used in testing submitted are approved by client representative as per ITP such as : Installation checklist for static/rotating equipments - Levelinf / alignment recording forms for horizontal and vertical package type - Axial/ radial, soft foot parallelism forms for pumps and compressors.
> Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage .
> Check the physical condition of anchor bolts and leveling of foundations before erection of equipments .
> Check preservation status of equipments at site .
> Ensure to have a preservation log for all the equipments checked and monitored daily / weekly for easily tracking the status.
> Involving the erection of cooling tower.
> Obtaining a complete check list of the assembling equipment and keep a record of a same.
> Responsible person for clearance of materials
My responsibilities include, supervising welding fitting jobs. managing the workers during job process. organizing safety tool box meeting ever day.
reporting, preparing the work permits.
Supervising and monitoring the tankage jobs .
Responsible For the Tanks erection and Piping welding activities
• Supervising the welding and piping activities according the drawings, WPS and PQR.
• Shifting the materials from storage area to the site.
• Organising for materials receiving at site procedure, with other departments.
• Supervising 50-60 craftmens and 4 foremans in activities.
• Reporting all activities as daily, weekly to site manager.
• Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage.
• Check the physical condition of anchor bolts and leveling of foundations before erection of equipments.
• Check preservation status of equipments at site.
• Ensure to have a preservation log for all the equipments checked and monitored daily/weekly for easily tracking the status.
• Responsible person for clearance of materials inspection.
• Good knowledge in permit to work system.
• Responsible for safe execution of job
Responsible Fort he Tanks erection and Piping welding activities
• Supervising the welding and piping activities according the drawings, WPS and PQR.
• Shifting the materials from storage area to the site.
• Organising for materials receiving at site procedure, with other departments.
• Supervising 50-60 craftmens and 4 foremans in activities.
• Reporting all activities as daily, weekly to site manager.
• Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage.
• Check the physical condition of anchor bolts and leveling of foundations before erection of equipments.
• Check preservation status of equipments at site.
• Ensure to have a preservation log for all the equipments checked and monitored daily/weekly for easily tracking the status.
• Responsible person for clearance of materials inspection.
• Good knowledge in permit to work system.
• Responsible for safe execution of job
COMPANY: GAP INSAAT CONTRACTING
PROJECT: TEJEN FERTILIZER PROJECT
CITY: TEJEN
COUNTRY: TURKMENIA
YEARS: 05/01/2004//15/11/2004
REASON OF TERMINATION: END OF CONTRACT
COMPANY: GAMA-AL-MOUSHEGAH ARABIA LIMITED
PROJECT: SHOAIBAH POWER PLANT PROJECT
CITY: JEDDAH
COUNTRY: SAUDI ARABIA
YEARS: 2001//2003
REASON OF TERMINATION: END OF WORK
MECHANICAL ENGINEERING FACULTY
PRIMARY SCHOOL: 1985--1991 Mersin/Turkey OTHER TRAINING; Ministry Of National Education:Certificate Of Mastership