Work Experience

Total years of experience :41 years, 4 Months

MEP Senior Electrical Engineer at Skanska Civil, USA
  • United States - New York
  • My current job since August 1987

MEP Electrical Engineering / project manager for Heavy electrical mechanical equipment.
Verifying the design and field supervision of the installations, testing and commissioining the electrical / mechanical equipment.

Electrical Project Manager at Skanska USA Inc
  • United States
  • My current job since March 2012

Manage the Electrical and low voltage/communication systems and the associated civil work. Completed the new construction of 34 St. Station at the 7 Line Extension, MTA NYCT Project. Currently I am managing the electrical and communication systems at the Bayonne Bridge, PANY&NJ Project.

•Manage sub-contractors & coordinate construction activities to insure completion of project in accordance with the Contract documents and within budget and schedule.
•Supervise all field installation as per contract requirement, the approved shop drawings and all applicable codes and safety standards.
•Review, verify and process all progress payments for sub-contractors.
•Estimates and additional work orders.
•Support all administrative, CAD engineer, and field activities for a successful completition of the project.

Senior Project Manager at Barbaro Electric
  • United States
  • August 2010 to March 2012

NYCT Contract C34892, Fire Suppression Sys. In Various Signal Equip. Locations.
•Responsible for supervision of engineering, guidance and technical support.
•Provides electrical/ communication construction design, layouts, and calculations to comply with codes, standards, and project requirement in support of all projects.
•Value Engineering, Proposals, Estimates and AWO Negotiations
•Coordinate power requirement and layouts with Utility company.
•Project Management / Field Supervision.

Senior Project Engineer at TC Electric
  • United States
  • September 2008 to August 2010

Managed the Electrical, Communication, and Traction Power Systems at the Culver line, MTA NYCT Project.

•Responsible for supervision of engineering and technical support.
•Provide electrical construction design in support of Rehabilitation of Culver Line Viaduct.
•Layout and design on NYCT traction power system equipment.
•Layout and design communication systems.

Project Engineer at Five Star Electric, Inc
  • United States
  • June 2007 to September 2008

Provided electrical and communication design for Gansevoort Hotel, a 22 floors, new construction. Layout of electrical service, switchgear, panel boards. Coordinate electrical service with the Utility Companies.

Project Manager at D.L. Blaine Corp
  • United States
  • February 2005 to June 2007

MTA/ TBTA Contract # BW-82, Replacement of roadway deck at the Bronx Whitestone Bridge, project includes installation of 2 substations, 5 KV redundant feeder across the bridge, bridge lighting, bridge sensors, SCADA system, fiber optic, 4 maintenance travelers, motorized dampers & controls, fire alarm & security systems, rehab. of primary service feeders, communication systems upgrades, temporary power, control & communication systems to
maintain operation of the bridge.

Project Manager / Communications Engineer at Welsbach Electric Corp
  • United States
  • February 1995 to February 2005

I ran multiple NYSDOT, NYCDOT, Port Authority, & NYCT Projects. Responsibilities as outlined in the summary of experience above and coordinated all work with Con Edison and Verizon.

Project Manager / Communication Engineer at Warde Electric Contracting Inc
  • United States
  • May 1990 to February 1995

Completed NYS Thruway, PANYNJ, and NYC Transit Projects. Responsibilities as outlined in the summary of experience above.
Projects Completed :
•NYS Thruway Authority: F & I Power & Communication for variable message signs along the Tappan Zee Bridge and substations.
•PANY&NJ Project to upgrade roadway signs structures and install new electronic signs at LaGuardia Airport.
•NYC Transit Projects. Communications Engineering include layouts shop drawings, Telephone Terminal Box Wiring diagrams, and directed all required place in service bulletins.

Engineer at Underwriters Laboratories, Inc
  • United States
  • January 1983 to June 1994

Investigate electrical products for public safety.

Project Engineer / Systems Engineering at Comco Systems, Inc
  • United States
  • June 1984 to May 1990

Involved in the design of the communications equipment for Mass Transit, i.e. P.A. Amplifier, Intercom Systems and other communication systems.
•System Engineering; Public Address & Intercom Systems, Sound Systems, CCTV & Security Systems, and Fire Alarms.
•Cost estimating including preliminary design and equipment selections.
•Field Supervision, project engineering.

Education

High school or equivalent, Professional Engineer
  • at Polytechnic University
  • December 1987

.

High school or equivalent, Professional Engineer
  • at Polytechnic University
  • December 1987

.

Bachelor's degree, Electrical Engineering
  • at Pratt Institute
  • December 1982

.

Specialties & Skills

Service Coordination
Coordination
Construction Management
Installations
SUPERVISORY SKILLS
UPGRADES
ADMINISTRATION
BUDGETING
ENGINEERING
ESTIMATING
MANAGEMENT
PROGRESS

Training and Certifications

OSHA Safety Training (Training)
Training Institute:
NYC Dept of Buildings
Date Attended:
May 2015
Duration:
10 hours
OSHA Safety Training (Training)
Training Institute:
NYC Dept of Buildings
Date Attended:
May 2015

Hobbies

  • Treavel and Exploration