Maria Trinidad del Carmen-Villa, Lean Engineer

Maria Trinidad del Carmen-Villa

Lean Engineer

Engineering Contracting Co. LLC

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
بكالوريوس, Electronics andCommunication Engineering
الخبرات
18 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 9 أشهر

Lean Engineer في Engineering Contracting Co. LLC
  • الإمارات العربية المتحدة - دبي
  • يونيو 2018 إلى ديسمبر 2021

Key Result Areas:
• $280, 000 Total Material Cost Savings on Ceramic Tile Laying Activity; 7 projects with horizontal deployment of Centralized
Tile Cutting; $40, 000 Cost Savings from Process Improvement; Tools applied: Value Stream Mapping (VSM), 5S, Kaizen, A3, Time and Motion, 5 Why, Lean Construction Tools (Pull Planning), Decoupling Point, First Run Studies, Modularization, Prefabrication, etc.), Centralized Tile Cutting
• $380, 000 Manpower Cost Savings on Other Building Construction Activities (Blockworks, Plastering, Painting); Reducing Non-Value Adding Activities; Reducing Slab Cycle from 14 days to 3 days
• Facilitate and execute the phases of Lean Implementation on the company.
• Conduct Training to introduce Lean concept and different Lean Tools to the company.
• Conduct Value Stream Mapping Session to identify Value-Adding and Non-Value Adding process.
• Promote workplace organization through the culture of 5S.
• Initiate and encourage people to come-up with Kaizen points; follow-up and assure the implementation.
• Facilitate and support Case Studies to assure that Right Things, are at the Right Place, on the Right Time and Right Quantity.
• Avoid Non-Conformances to re-occur from one site to another.
• Participate in the Pull Planning and Design of Activity and coordination among different groups such as planning, project
management, finance, QAQC and others upon execution of every new activity that will be implemented.
• Direct reporting to Group Cost Control Director.

Senior Process Engineer في Saif Bin Darwish
  • الإمارات العربية المتحدة - أبو ظبي
  • يوليو 2013 إلى مايو 2018

• $81, 000 Manpower Cost, Transportation Cost and Utility Cost Savings on Kerbstone Laying Activity; Increasing the productivity from 400 LM to 1000 LM per day; Tools applied: Identifying Lean Waste, Total Quality Control, Feasibility Studies, Time and Motion Studies, Line Balancing, Kaikaku (Transformation of Mind), Skill Map, Labor Report, Centralized Kerbstone Cutting Area, 5S
• Prevent $10M and $30M worth of liability and claims by Archiving 8, 000 files from old projects and 5, 200 master files from existing projects; Setting-up of Centralized Filing Room
• Conduct Kick-Off Meeting to introduce Lean concept to the company.
• Give training or induction about different Lean Tools.
• Promote the Lean Culture through the concept of Quality Circle, Kaizen, 5S and Factory-Thinking Approach.
• Encourage the people to perform the Lean Thinker’s Daily Task.
• Analyze Daily Production versus Utilization of Resources (Cost Control).
• Advise and support Production in achieving daily plan and cost efficiency.
• Initiate and facilitate process improvement activities in the site.
• Direct reporting to COO. Provide quality reports and presentations.

Senior Production Engineer في EPSON Precision Philippines Inc
  • الفلبين - Lipa City
  • مارس 2003 إلى مايو 2013

• $240, 950 Repair Cost, Analysis Cost and Set-up Cost Savings on Projector Production; “Dirt Defect” reduction from 4.25% to 0.23%; Utilize this project in competing and winning Southeast Asian and Worldwide Kaizen Events; Tools applied: Suheitenkai (Horizontal Deployment), Sangen-Shugi (3R), Mind Map, Brainstorming, 5S, Standard Procedure
• $1M increase in profit; increase in customer demand due to guaranteed Printer product quality thru application of Unit Guarantee System; Tools applied: MSA, Determining the sample size through z-distribution, Setting the UCL and LCL
PREVIOUS EXPERIENCE
• Build a new engineering department for the analysis and repair of the new product.
• Make the overall planning for the group activities in-line with the department and company’s set targets for the given fiscal
year; Planning includes target measurable indices, target completion of each activity, manpower allocation, and budget for
factory tools, supplies, and consumables.
• Supervise manpower of engineering department through enhancement of their technical and professional skills; Assure the
complete documentation and quality of their reports.
• Create and lead several special projects which promote quality yet consider productivity and cost.
• Advise and support Production in achieving daily plan and First Pass Yield.
• Conduct product analysis, troubleshooting, and give effective countermeasures.
• Design-Trainee at SEIKO-EPSON CORP., JAPAN.
• Conduct 4M (Man, Machine, Material, and Method) Evaluation and verifies the effectiveness of improvement.
• Create and standardize Evaluation Procedure.
• Maintain and control the equipment and evaluation tools used in product evaluation.
• Direct reporting to Japanese Manager. Provide quality reports and presentations.

الخلفية التعليمية

بكالوريوس, Electronics andCommunication Engineering
  • في Batangas State University
  • مارس 2002

Engineering is not only technical, it is logical.

Specialties & Skills

Process Flow
Product Engineering
Lean Construction
Lean Manufacturing
Lean Sigma
CUSTOMER RELATIONS
MICROSOFT WORKS
APPROACH
CONCEPT DEVELOPMENT
COST CONTROL
FEASIBILITY STUDIES
FILE MANAGEMENT
PROCESS ENGINEERING
QUALITY
LEAN SIX SIGMA BLACK BELT

اللغات

اليابانية
مبتدئ
الانجليزية
متمرّس
التاغلوج
اللغة الأم

التدريب و الشهادات

Six Sigma Black Belt (الشهادة)
تاريخ الدورة:
November 2021
CERTIFICATION OF MANAGEMENT - LEAN PROFESSIONAL (الشهادة)
تاريخ الدورة:
October 2019
SUPPLY CHAIN MANAGEMENT (الشهادة)
تاريخ الدورة:
April 2016