Tryfina Kgokong, Senior Quantity Surveyor

Tryfina Kgokong

Senior Quantity Surveyor

Arabtec

Location
United Arab Emirates
Education
Master's degree,
Experience
21 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 5 Months

Senior Quantity Surveyor at Arabtec
  • United Arab Emirates - Abu Dhabi
  • My current job since August 2014

• Contract and commercial administration of Work Package Subcontractors.'
• Preparing Letter of Intent, Letter of Appointment and Subcontract Agreements.
• Reviewing technical aspects of the Subcontracts.
• Integration of Subcontract Bills of Quantities into Building Information Model and Cost Loading.
• Assist in finalising Earned Value for subcontractors.
• Preparing and reviewing Subcontractors advance payments and monthly invoicing for compliance.
• Determination of interim payment entitlement.
• Finalisation of interim payment certificates.
• Determine impact of Drawing changes.
• Issue Contractor’s Instruction to subcontractors.
• Issue Value Engineering Proposals and Request for Variation Proposals to Subcontractors.
• Analysis of Subcontractor cost due to Employer’s proposed design change.
• Valuation of Cost impact regarding Value Engineering.
• Valuation of Variations through Engineering Instruction, Request for Variation Order, Value Engineering Proposal, Rough Order of Magnitude, etc.
• Determination of Variations to Subcontract and Value Engineering.
• Drafting and ensuring contractual correspondence and notices are issued on time to the Subcontractors as per the provisions of the Subcontract.
• Attend Subcontractor’s Commercial & Progress Meetings.
• Preparing and reviewing Subcontractors monthly liabilities.
• Implement Subcontract reviews on a consistent basis to gauge progress of Subcontracts.
• Upon completion of reviews, preparing written reports detailing the overall progress of Subcontracts and briefing my Manager regarding those reviews and any associated actions taken.
• Resolving conflicts, mediating disputes; finding solutions to problems and making decisions in coordination with my Manager.
• Applying company policies, legal procedures & regulations, to maintain effective administration of the Subcontracts.
• Obtaining close out documentation upon completion/termination of Subcontract Works and negotiating final (end) settlements of the Subcontract.

Senior Quantity Surveyor – Hotels/Hospitality, Uae at MLC International
  • United Arab Emirates - Dubai
  • February 2013 to July 2014

Responsible for estimating, production of documents, tendering, cost control, administration of contracts and final account preparation.

Senior Q.S at United Precast Concrete
  • United Arab Emirates
  • September 2012 to January 2013

• Cost control & reporting during pre-contract period
• Appropriate fees scales & conditions of engagement
Contract Documentation: • Preparing of bills of quantities for main or sub-contracts or contracts of supply including the measurement & description of work, & the drafting of preliminaries, preambles & contract conditions.
• Preparing specifications and/or schedules of rates
• Contractual correspondence
Tendering & Contractual Arrangements: • Formulating or implementing procedures on tendering & contractual arrangements for main or sub-contracts or contracts of supply
• Advising on selection of tenderers; evaluation of & reporting on tenders
• Preparing tenders including compilation of rates for work & preliminaries
Contract Services: The following are applicable to main or sub-contracts or contracts of supply: • Advising on cost during progress of the works, estimating final costs & reporting on the financial effects
• Monitoring of proposed construction methods or sequences & reporting on actual requirements; preparing cost benefit reports on alternative construction methods
• Cost control during progress of the works
• Preparing valuations for interim certificates
• Analyzing contract prices relative to cost recording methods
• Preparing & agreeing final accounts & contract charges
• Reporting on, evaluating & negotiating contractual & extra-contractual issues; contract correspondence; attending site meetings
• Preparing or interpreting cost/value & other reconciliation statements for management purposes
• Surveying, measuring & recording site information

Specialization: • MBA research theses in the area of green buildings
• Development in the area of business management
• MBA electives in project management and emotional intelligence

1. Current position: Senior Q.S (Systems development, estimating and cost control) at United Precast Concrete - September 2012 to Present
My role involves conducting an in-depth review and audit of current accounting, estimating and cost control systems in order to prepare in conjunction with Software Development team a new estimation and project cost control and reporting system.
• To audit current cost capturing systems and interrogate the basis of current cost capturing systems.
• To evaluate the correctness of the accounting system in the allocation of costs.
• To evaluate the correctness in estimation system and develop a new estimating package.

at BIM Q.S
  • June 2011 to October 2012

3. BIM Q.S at 6D Projects/SkyBIM: June 2011 - October 2012

I was responsible for the implementation of the SkyBIM software in order to bring in the aspect of Building Information Modelling (BIM) into projects and to allow for better collaboration and management of information within the entire design team and throughout the life-cycle of the project. I facilitated the final development phases of the SkyBIM software by providing professional Quantity Surveying advice to enable the programmer to input coding that will produce the desired output. My role was to make use of very sophisticated software such as SkyBIM and Revit to produce estimates for the following projects:
• The Orchards low cost housing
• Pick n Pay fit-outs
• Nandos fit-outs
• Birchwood sports centre
• McDonalds

at National Pension Scheme Authority
  • May 2011 to August 2012

Services Provided on Projects include: Cost Advice and Cost Planning: • Preparing & using cost data
• Preparing estimates
• Preparing & using detailed budgets & cost plans; cost checking during design development; compiling & using cost limits
• Cost control & reporting during pre-contract period
• Appropriate fees scales & conditions of engagement
Contract Documentation: • Preparing of bills of quantities for main or sub-contracts or contracts of supply including the measurement & description of work, & the drafting of preliminaries, preambles & contract conditions.
• Preparing specifications and/or schedules of rates
• Contractual correspondence
Tendering & Contractual Arrangements: • Formulating or implementing procedures on tendering & contractual arrangements for main or sub-contracts or contracts of supply
• Advising on selection of tenderers; evaluation of & reporting on tenders
• Preparing tenders including compilation of rates for work & preliminaries
Contract Services: The following are applicable to main or sub-contracts or contracts of supply: • Advising on cost during progress of the works, estimating final costs & reporting on the financial effects
• Monitoring of proposed construction methods or sequences & reporting on actual requirements; preparing cost benefit reports on alternative construction methods
• Cost control during progress of the works
• Preparing valuations for interim certificates
• Analyzing contract prices relative to cost recording methods
• Preparing & agreeing final accounts & contract charges
• Reporting on, evaluating & negotiating contractual & extra-contractual issues; contract correspondence; attending site meetings
• Preparing or interpreting cost/value & other reconciliation statements for management purposes
• Surveying, measuring & recording site information

Specialization: • MBA research theses in the area of green buildings
• Development in the area of business management
• MBA electives in project management and emotional intelligence

1. Current position: Senior Q.S (Systems development, estimating and cost control) at United Precast Concrete - September 2012 to Present
My role involves conducting an in-depth review and audit of current accounting, estimating and cost control systems in order to prepare in conjunction with Software Development team a new estimation and project cost control and reporting system.
• To audit current cost capturing systems and interrogate the basis of current cost capturing systems.
• To evaluate the correctness of the accounting system in the allocation of costs.
• To evaluate the correctness in estimation system and develop a new estimating package.

2. Senior Q.S at Nonku Ntshona & Associates Quantity Surveyors November 2011 May 2012
I was involved with the running of the projects listed below:
2.1. Levy Business Park - Freshview Cinema
Project Name Levy Business Park - Freshview Cinema Tenant Installation in Zambia
Project Description
Levy Business Park Freshview Cinema comprised of: The Construction of a cinema as a tenant installation for Freshview cinema.
Total Construction Area 3 500 m²

Project Value $ 6 700 000
Client National Pension Scheme Authority (NAPSA) & Liberty
Contract Period 1 Year and 3months ( 31 May 2011 to 31 August 2012)


2.2. Dawn Park Retail Development

Hall, Administration at Free State Public Works
  • May 2011 to August 2012

Letlotlo Naledi Primary School comprised of: The Construction of Classroom blocks, Activity centre, Hall, Administration block, Feeding Scheme block and Media centre.

Contract Price R30 598 781.91
Client Free State Public Works
Contract Period 1 Year and 3months ( 31 May 2011 to 31 August 2012)


2.4. Ntuthuzelo Secondary School
Project Name Ntuthuzelo Secondary School in Bultfontein, Free State
Project Description
Ntuthuzelo Secondary School l comprised of: The Construction of new facilities: Classrooms, school hall, computers centre, feeding Scheme, etc

Contract Price R24 639 072.39

at National Public Works
  • November 2011 to May 2012

Client National Public Works
Contract Period 7 Months ( 10 November 2011 to 03 May 2012)

Senior Q.S at Nonku Ntshona & Associates Quantity Surveyors
  • November 2011 to May 2012

2. Senior Q.S at Nonku Ntshona & Associates Quantity Surveyors November 2011 May 2012
I was involved with the running of the projects listed below:
2.1. Levy Business Park - Freshview Cinema
Project Name Levy Business Park - Freshview Cinema Tenant Installation in Zambia
Project Description
Levy Business Park Freshview Cinema comprised of: The Construction of a cinema as a tenant installation for Freshview cinema.
Total Construction Area 3 500 m²

Project Value $ 6 700 000

at Independent Development Trust
  • November 2011 to May 2012

Client Independent Development Trust (IDT)
Contract Period 7 months ( 10 November 2011 to 03 May 2012)


2.7. SAPS Houses
Project Name SAPS 4 Houses Renovations and Alterations in Bultfontein, Free State
Project Description SAPS 4 Houses Renovations and Alterations comprised of: The Renovations & Redecoration of 4 SAPS houses
Contract Price R3 000 000

at Free State Public Works
  • to November 2011

Client Free State Public Works
Final Price N/A
Contract Period 1 Year and 3months ( 10 November 2011 to 03 March 2013)


2.5. Iphateleng Secondary School
Project Name Iphateleng Secondary School in Wesselbroon, Free State
Project Description
Iphateleng Secondary School comprised of: The Construction of new facilities: Classrooms, school hall, computers centre, feeding Scheme, etc

Contract Price R20 000 000
Client Free State Public Works
Final Price N/A
Contract Period 1 Year and 3months ( 10 November 2011 to 03 March 2013)


2.6. Diphetoho Secondary School
Project Name Diphetoho Secondary School in Bothaville, Free State
Project Description
Diphetoho Secondary School l comprised of: The Construction of a new administration block formed of a raft foundation, face brickwork, ring beams, timber roof and external works

Contract Price R4 700 000

at MLC Quantity Surveyors Cape Town
  • South Africa
  • January 2007 to May 2011

4. Pr. Q.S at MLC Quantity Surveyors Cape Town: January 2007 - May 2011
4.1 Anson Square Retail & Residential
Project Name Anson Square in Observatory, Cape Town.
Project Description
Anson Square comprised of: The construction of a combination of retail and residential, build up of a naturally ventilated basement parking area, ground floor retail shops and three levels of apartment floors, formed of a brickwork and concrete envelope, surface bed, reinforced concrete columns and structural steel roof.
Total Construction Area 3 965 m²

Contract Price R139 000 000
Client Daleglen Properties
Contract Period N/A


4.2 Umhlanga Holiday Inn Express
Project Name Holiday Inn Express: Umhlanga Rocks in Umhlanga, Durban
Project Description
The construction of a hotel, build up of two basement parking levels, a public area level and five hotel floor levels formed of a brickwork and concrete envelope, surface bed, reinforced concrete structure and roof
Total Construction Area 7 720 m²

at Iso Leisure
  • France
  • March 2009 to May 2010

Client Iso Leisure
Contract Price R 276 745 000
Contract Period 1 Year and 3months (02 March 2009 to 14 May 2010)


4.3 Umhlanga Elevated Roadway
Project Name Umhlanga Ridge: Elevated Roadway in Umhlanga, Durban
Project Description
The construction of an elevated roadway, build up of two levels, formed of a brickwork and concrete envelope, surface bed and reinforced concrete structure
Total Construction Area 3 000 m²

at Holiday Inn Sunny Park
  • January 2004 to January 2010

4.10 Holiday Inn Sunny Park
Project Name Holiday Inn Sunny Park in Sunnyside, Pretoria
Project Description
The principal focus of this enquiry is the conversion of twelve levels of an existing apartment block into a hotel, comprising level four public and back-of-house and levels six to sixteen guestroom floors plus new level one entrance / port cochere with link to level four. In addition, the scope of works includes for the replacement of windows / window walls to the entire building, the construction of feature balconies off the south-west core and the redecoration of external walls.
Total Construction Area 15 924

at Iso Leisure
  • December 2007 to December 2009

Client Iso Leisure
Contract Price R 181 246 000
Contract Period 2 Years (07 December 2007 to 03 December 2009)

at Zenprop Properties
  • South Africa
  • July 2009 to December 2009

Client Zenprop Properties
Contract Price R 6 197 040
Contract Period 6 months (02 July 2009 to 14 December 2009)


4.4 Fisherman's World Alterations
Project Name Fisherman's World in Hout Bay, Cape Town
Project Description Alterations and Renovations of existing mall and office blocks
Contract Price R 38 000 000
Contract Period 1 months (02 April 2002 to 30 April 2002)


4.5. Holiday Inn Express St. Georges Hotel Refurbishment
Project Name Holiday Inn Express St.Georges Hotel in Cape Town
Project Description
The conversion of an existing office block into a hotel, build up of basement parking, ground floor and fourteen hotel floors.
Total Construction Area 8 560 m²

at Iso Leisure
  • South Africa
  • April 2007 to May 2008

Client Iso Leisure
Contract Price R 105 769 000
Contract Period 1 year 1 month (16 April 2007 to 23 May 2008)


4.8. Graham Beck Skills Development Centre
Project Name Graham Beck Skills Development Centre in Robertson, Cape Town
Project Description
Skills development centre over four levels, comprising concrete and brick structure, combination steel and timber roof structure with sheet metal roof covering, plastered and painted facade with aluminium windows and doors.
Total construction area 6 170 m²

at Iso Leisure
  • South Africa
  • April 2007 to March 2008

Client Iso Leisure
Contract Price R111 703 000 (Excluding VAT)
Contract Period 11 months (10 April 2007 to 30 March 2008)


4.6. Middestad Mall Bellville Alterations and Extensions
Project Name Middestad Mall in Bellville, Cape Town
Project Description Phase One: Shoprite Construction two: New First Floor Library, three: Existing Library Infill

at Paramount Property Fund Limited
  • October 2006 to November 2007

Client Paramount Property Fund Limited
Contract Price R 179 542 000
Contract Period 1 year and 1 month (01 October 2006 to 30 November 2007)


4.7. Woodmead Holiday Inn Express
Project Name Woodmead Holiday Inn Express in Woodmead, Gauteng
Project Description
The construction of a hotel, build up of a naturally ventilated ground floor parking area and three levels of hotel floors, formed of a brickwork and concrete envelope, surface bed, reinforced concrete columns and roof
Total Construction Area 8 052 m²

Receptionist-Part time at VACATION WORK
  • January 2006 to December 2006

VACATION WORK
2006: UCT Liesbeeck Gardens: Receptionist-Part time

Quantity Surveyor - part time at Davis Langdon
  • United Arab Emirates
  • January 2006 to December 2006

2006: Davis Langdon: Quantity Surveyor - part time

Peer Helper at UCT Liesbeeck Gardens
  • January 2005 to December 2005

2005: UCT Liesbeeck Gardens: Peer Helper

Site Agent - part time at Nova Construction
  • January 2005 to December 2005

2005: Nova Construction: Site Agent - part time

Orientation Leader
  • January 2004 to January 2005

2004 & 2005: UCT Engineering and Built Environment: Orientation Leader

Student Q.S -part time at Grinaker-LTA
  • January 2004 to December 2004
Proman Project Management Services at Mr Alex Van Zyl
  • January 1966 to December 1966

Design Team Reference: Proman Project Management Services
Mr Alex Van Zyl
Director
Tel: (021) 425 6377
Cell: 082 561 1966
alex@proman.co.za

Character reference: Werksmans Attorneys
Miss Winnie Marutle
Best Friend
Tel: 011 535 8254
Cell: 072 084 1846
wmarutle@werksmans.com

Dawn Park Retail Development in Ext 31 at Gauteng
  • to

Project Name Dawn Park Retail Development in Ext 31, Gauteng
Project Description
Dawn Park Retail Development comprised of: The Construction of a shopping centre with raft foundation slab, column bases, columns, ring beams, external and internal brick walls, glass and aluminium shopfronts, steel roof covering on structural steel trusses, walkways, roads and parking as well as specialist services.
Total Construction Area 12 630 m²

Project Value R 120 000 000

Associate Quantity Surveyor at Mr Neil Du Pisani
  • to
Director at Mr Allan Nenguke
  • to
Proman Project Management Services at Mr Alex Van Zyl
  • to

Services Provided on Projects include: Cost Advice and Cost Planning: • Preparing & using cost data
• Preparing estimates
• Preparing & using detailed budgets & cost plans; cost checking during design development; compiling & using cost limits
• Cost control & reporting during pre-contract period
• Appropriate fees scales & conditions of engagement
Contract Documentation: • Preparing of bills of quantities for main or sub-contracts or contracts of supply including the measurement & description of work, & the drafting of preliminaries, preambles & contract conditions.
• Preparing specifications and/or schedules of rates
• Contractual correspondence
Tendering & Contractual Arrangements: • Formulating or implementing procedures on tendering & contractual arrangements for main or sub-contracts or contracts of supply
• Advising on selection of tenderers; evaluation of & reporting on tenders
• Preparing tenders including compilation of rates for work & preliminaries
Contract Services: The following are applicable to main or sub-contracts or contracts of supply: • Advising on cost during progress of the works, estimating final costs & reporting on the financial effects
• Monitoring of proposed construction methods or sequences & reporting on actual requirements; preparing cost benefit reports on alternative construction methods
• Cost control during progress of the works
• Preparing valuations for interim certificates
• Analyzing contract prices relative to cost recording methods
• Preparing & agreeing final accounts & contract charges
• Reporting on, evaluating & negotiating contractual & extra-contractual issues; contract correspondence; attending site meetings
• Preparing or interpreting cost/value & other reconciliation statements for management purposes
• Surveying, measuring & recording site information

Specialization: • MBA research theses in the area of green buildings
• Development in the area of business management
• MBA electives in project management and emotional intelligence

1. Current position: Senior Q.S (Systems development, estimating and cost control) at United Precast Concrete - September 2012 to Present
My role involves conducting an in-depth review and audit of current accounting, estimating and cost control systems in order to prepare in conjunction with Software Development team a new estimation and project cost control and reporting system.
• To audit current cost capturing systems and interrogate the basis of current cost capturing systems.
• To evaluate the correctness of the accounting system in the allocation of costs.
• To evaluate the correctness in estimation system and develop a new estimating package.

2. Senior Q.S at Nonku Ntshona & Associates Quantity Surveyors November 2011 May 2012
I was involved with the running of the projects listed below:
2.1. Levy Business Park - Freshview Cinema
Project Name Levy Business Park - Freshview Cinema Tenant Installation in Zambia
Project Description
Levy Business Park Freshview Cinema comprised of: The Construction of a cinema as a tenant installation for Freshview cinema.
Total Construction Area 3 500 m²

Project Value $ 6 700 000
Client National Pension Scheme Authority (NAPSA) & Liberty
Contract Period 1 Year and 3months ( 31 May 2011 to 31 August 2012)


2.2. Dawn Park Retail Development
Project Name Dawn Park Retail Development in Ext 31, Gauteng
Project Description
Dawn Park Retail Development comprised of: The Construction of a shopping centre with raft foundation slab, column bases, columns, ring beams, external and internal brick walls, glass and aluminium shopfronts, steel roof covering on structural steel trusses, walkways, roads and parking as well as specialist services.
Total Construction Area 12 630 m²

Project Value R 120 000 000
Client Saint Holdings (Pty) Ltd T/A Buna Group
Contract Period 1 Year and 5months ( 31 January 2012 to 31 June 2013)


2.3. Letlotlo Naledi Primary School
Project Name Letlotlo Naledi Primary School in Bothaville, Free State
Project Description
Letlotlo Naledi Primary School comprised of: The Construction of Classroom blocks, Activity centre, Hall, Administration block, Feeding Scheme block and Media centre.

Contract Price R30 598 781.91
Client Free State Public Works
Contract Period 1 Year and 3months ( 31 May 2011 to 31 August 2012)


2.4. Ntuthuzelo Secondary School
Project Name Ntuthuzelo Secondary School in Bultfontein, Free State
Project Description
Ntuthuzelo Secondary School l comprised of: The Construction of new facilities: Classrooms, school hall, computers centre, feeding Scheme, etc

Contract Price R24 639 072.39
Client Free State Public Works
Final Price N/A
Contract Period 1 Year and 3months ( 10 November 2011 to 03 March 2013)


2.5. Iphateleng Secondary School
Project Name Iphateleng Secondary School in Wesselbroon, Free State
Project Description
Iphateleng Secondary School comprised of: The Construction of new facilities: Classrooms, school hall, computers centre, feeding Scheme, etc

Contract Price R20 000 000
Client Free State Public Works
Final Price N/A
Contract Period 1 Year and 3months ( 10 November 2011 to 03 March 2013)


2.6. Diphetoho Secondary School
Project Name Diphetoho Secondary School in Bothaville, Free State
Project Description
Diphetoho Secondary School l comprised of: The Construction of a new administration block formed of a raft foundation, face brickwork, ring beams, timber roof and external works

Contract Price R4 700 000
Client Independent Development Trust (IDT)
Contract Period 7 months ( 10 November 2011 to 03 May 2012)


2.7. SAPS Houses
Project Name SAPS 4 Houses Renovations and Alterations in Bultfontein, Free State
Project Description SAPS 4 Houses Renovations and Alterations comprised of: The Renovations & Redecoration of 4 SAPS houses
Contract Price R3 000 000
Client National Public Works
Contract Period 7 Months ( 10 November 2011 to 03 May 2012)


3. BIM Q.S at 6D Projects/SkyBIM: June 2011 - October 2012

I was responsible for the implementation of the SkyBIM software in order to bring in the aspect of Building Information Modelling (BIM) into projects and to allow for better collaboration and management of information within the entire design team and throughout the life-cycle of the project. I facilitated the final development phases of the SkyBIM software by providing professional Quantity Surveying advice to enable the programmer to input coding that will produce the desired output. My role was to make use of very sophisticated software such as SkyBIM and Revit to produce estimates for the following projects:
• The Orchards low cost housing
• Pick n Pay fit-outs
• Nandos fit-outs
• Birchwood sports centre
• McDonalds

4. Pr. Q.S at MLC Quantity Surveyors Cape Town: January 2007 - May 2011
4.1 Anson Square Retail & Residential
Project Name Anson Square in Observatory, Cape Town.
Project Description
Anson Square comprised of: The construction of a combination of retail and residential, build up of a naturally ventilated basement parking area, ground floor retail shops and three levels of apartment floors, formed of a brickwork and concrete envelope, surface bed, reinforced concrete columns and structural steel roof.
Total Construction Area 3 965 m²

Contract Price R139 000 000
Client Daleglen Properties
Contract Period N/A


4.2 Umhlanga Holiday Inn Express
Project Name Holiday Inn Express: Umhlanga Rocks in Umhlanga, Durban
Project Description
The construction of a hotel, build up of two basement parking levels, a public area level and five hotel floor levels formed of a brickwork and concrete envelope, surface bed, reinforced concrete structure and roof
Total Construction Area 7 720 m²

Client Iso Leisure
Contract Price R 276 745 000
Contract Period 1 Year and 3months (02 March 2009 to 14 May 2010)


4.3 Umhlanga Elevated Roadway
Project Name Umhlanga Ridge: Elevated Roadway in Umhlanga, Durban
Project Description
The construction of an elevated roadway, build up of two levels, formed of a brickwork and concrete envelope, surface bed and reinforced concrete structure
Total Construction Area 3 000 m²

Client Zenprop Properties
Contract Price R 6 197 040
Contract Period 6 months (02 July 2009 to 14 December 2009)


4.4 Fisherman's World Alterations
Project Name Fisherman's World in Hout Bay, Cape Town
Project Description Alterations and Renovations of existing mall and office blocks
Contract Price R 38 000 000
Contract Period 1 months (02 April 2002 to 30 April 2002)


4.5. Holiday Inn Express St. Georges Hotel Refurbishment
Project Name Holiday Inn Express St.Georges Hotel in Cape Town
Project Description
The conversion of an existing office block into a hotel, build up of basement parking, ground floor and fourteen hotel floors.
Total Construction Area 8 560 m²

Client Iso Leisure
Contract Price R111 703 000 (Excluding VAT)
Contract Period 11 months (10 April 2007 to 30 March 2008)


4.6. Middestad Mall Bellville Alterations and Extensions
Project Name Middestad Mall in Bellville, Cape Town
Project Description Phase One: Shoprite Construction two: New First Floor Library, three: Existing Library Infill
Client Paramount Property Fund Limited
Contract Price R 179 542 000
Contract Period 1 year and 1 month (01 October 2006 to 30 November 2007)


4.7. Woodmead Holiday Inn Express
Project Name Woodmead Holiday Inn Express in Woodmead, Gauteng
Project Description
The construction of a hotel, build up of a naturally ventilated ground floor parking area and three levels of hotel floors, formed of a brickwork and concrete envelope, surface bed, reinforced concrete columns and roof
Total Construction Area 8 052 m²

Client Iso Leisure
Contract Price R 105 769 000
Contract Period 1 year 1 month (16 April 2007 to 23 May 2008)


4.8. Graham Beck Skills Development Centre
Project Name Graham Beck Skills Development Centre in Robertson, Cape Town
Project Description
Skills development centre over four levels, comprising concrete and brick structure, combination steel and timber roof structure with sheet metal roof covering, plastered and painted facade with aluminium windows and doors.
Total construction area 6 170 m²

Client Graham Beck Wines
Contract Price R 15 017 547
Contract Period 11 months (05 February 2007 to 1 December 2007)


4.9. Public Private Partnership Prison Bid
Project Name PPP Prison Bid in East London, Klerksdorp, Paarl and Nigel
Project Description
The four number prisons comprised of: • All the prison Pods (A-H), Pod Control Unit, Pod Control Unit, Education Centre, Gymnasium, Religious Centre, Education Unit, Hospital, Clinic, Assessment Complex, Waste recycle centre, Industrial Workshops, Vocational Training, Maintenance Unit,

Contract Price N/A
Client Murray & Roberts
Contract Period N/A


4.10 Holiday Inn Sunny Park
Project Name Holiday Inn Sunny Park in Sunnyside, Pretoria
Project Description
The principal focus of this enquiry is the conversion of twelve levels of an existing apartment block into a hotel, comprising level four public and back-of-house and levels six to sixteen guestroom floors plus new level one entrance / port cochere with link to level four. In addition, the scope of works includes for the replacement of windows / window walls to the entire building, the construction of feature balconies off the south-west core and the redecoration of external walls.
Total Construction Area 15 924

Client Iso Leisure
Contract Price R 181 246 000
Contract Period 2 Years (07 December 2007 to 03 December 2009)


VACATION WORK
2006: UCT Liesbeeck Gardens: Receptionist-Part time
2006: Davis Langdon: Quantity Surveyor - part time
2005: UCT Liesbeeck Gardens: Peer Helper
2004 & 2005: UCT Engineering and Built Environment: Orientation Leader
2005: Nova Construction: Site Agent - part time
2004: Grinaker-LTA: Student Q.S -part time

MLC Quantity Surveyors
Mr Neil Du Pisani Mr Mike Stricker
Associate Quantity Surveyor Director - CEO
Tel: (021) 671 5800 Tel: (021) 671 580
Cell: 083 283 9709 Cell: 083 675 4117
ndupisani@mlcct.co.za mstricker@mlcct.co.za

Mr Allan Nenguke Mr Graham Haldane
Director Director
Tel: (021) 671 5800 Tel: (021) 671 5800
Cell: 083 478 0254 Cell: 082 880 7377
anenguke@mlcct.co.za ghaldane@mlcct.co.za

Education

Master's degree,
  • at University of Stellenbosch Business School
  • December 2012

University of Stellenbosch Business School • Masters of Business Administration (December 2012)

Bachelor's degree, Quantity Surveying
  • at University of Cape Town
  • January 2006

University of Cape Town • Honours in Quantity Surveying (2006)

High school or equivalent,
  • at University of Cape Town
  • January 2005

University of Cape Town • Batchelor of Science in Construction Studies (2005)

High school or equivalent,
  • at Modipa High School
  • January 2002

Modipa High School (Limpopo Province) • Matric (2002)

High school or equivalent, Economics & Management
  • at University of Cape Town

University of Cape Town Mrs Karen Le Jeune Construction Economics & Management Department (Senior Lecturer) Tel: (021) 650 2451 Cell: 083 517 8299 Karen.LeJeune@uct.ac.za

Specialties & Skills

Cost Planning
Contract Administration
Communications
Cost Management
Quantity Surveying
Microsoft Office
Communications
Leadership
Emotional Intelligence
Quantity Surveying Software
Project Management
Cost Planning and Management

Languages

English
Expert

Memberships

Royal Institute of Chatered Surveyors
  • Professional Member
  • December 2013

Hobbies

  • Leadership, skills development, emotional intelligence, socialising, tennis, gym, piano, fashion, mu
    2015: Featured on Midfield Terminal Project HSE Video @ 8:38 minutes, link : http://youtu.be/Yv849i4tMGM 2009: Awarded scholarship by the University of Stellenbosch to study MBA at their business school. 2005: Second place in salsa section of dance sport competition at Stellenbosch University 2003: Attended 13 weeks of Orientation Training at UCT.