Tuan Nguyen Ngoc, Electrical Engineer

Tuan Nguyen Ngoc

Electrical Engineer

Taisei Vinaconex Joint Venture

Lieu
Vietnam
Éducation
Master, Electronic Engineering
Expérience
14 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 10 Mois

Electrical Engineer à Taisei Vinaconex Joint Venture
  • Vietnam
  • Je travaille ici depuis mars 2013

March 2013 - Present
Taisei - Vinaconex Joint Venture (TVJV) is the Main Contractor at Noi Bai International Airport Terminal 2 Construction Project. I am working at MEP Section - Terminal Equipment Division, which handles equipment dedicated for Airport Terminal like Baggage Handling System, Airport Security System, Passenger Boarding Bridges, Airport Information System and Docking Guidance System. Since I joined TVJV, my responsibility is:

1. Engineering:
- Terminal Equipment Divison has 4 Sub-Contractors:
+ Vanderlande Industries: Provide Baggage Handling System
+ ShinMaywa Industries: Provide Passenger Boarding Bridges
+ Jalux Inc.: Provide Airport Security System
+ Arinc Incorporated: Provide Airport Information System and Docking Guidance System
I control Sub-Contractors’ submissions and fabrication progress.
- Check all submissions from Sub-Contractors such as material approval, shop drawing, method statement and make sure they are fully complied with Tender Specifications and Tender Drawings. Then submit them to Consultant to get approval.
- Issue Request for Information and Letter to Consultant and Owner.
- Coordinate with other Section (MEP and Building) in order to control Sub-Contractors working properly and finish on time.
- Check as built drawings from Sub-Contractor and hand-over systems to Owner.

2. Site work:
- Monitor and supervise Sub-Contractor working daily on site.
- Collect report from Sub-Contractor regarding progress, working coordination, safety and report to Section Manager.
- Notice to Sub-Contractor when they have any non-conformance issue on site. Make sure Sub-Contractors implement systems on site with good quality and safety.
- Arrange internal inspection with Sub-Contractors and inspection with Consultant until Consultant approves all items.

Besides, I also join other electrical works such as:
- Check Shop Drawings according to Project Specification and site conditions.
- Check Manufacturer and Material Approval document.
- Check Method Statement to implement and install system.
- Check Interface Control Document in order to get proper interoperation between all systems.
- Monitor the system installation works base on Overall Schedule, Sub-Contractors’ Schedule, Weekly Schedule and Monthly Schedule.
- Control quality of work.
- Coordinate with other teams (Building, Mechanical teams…) to avoid and resolve all unnecessary clashing.
- Testing and commissioning.
- Carry out inspection.


3. Defect Notification Period:
- Review the system maintenance schedules and monitor the Sub-Contractor’s maintenance activities on site.
- Coordinate between Airports Corporation of Viet Nam, Noi Bai Terminal Operation Centre, Project Management Unit Terminal 2, Japan Airport Consultant and Sub-Contractors to maintain systems running properly.
- Check, evaluate and propose method to resolve all the troubles happen during operation.
- Make monthly reports and distribute to all related parties.

Site Manager à Niem Tin Co., Ltd
  • Vietnam
  • septembre 2010 à mars 2013

Niem Tin Co., Ltd (NTC, 6&8FL, 142 Doi Can, Ba Dinh, Ha Noi). I'm a member of Technical Implementation Department (TID), my responsibility is:

1. Engineering:
- Check Tender Specification and Tender Drawing and propose Building Management System (BMS) solution.
- Prepare shop drawings and equipment schedule used for BMS construction work.
- Coordinate with Purchasing Department to order and delivery equipment to construction site.

2. Site work:
- Do site survey and implement BMS installation, testing and commissioning.
- Setup control software, configure controller, design graphic and code automation control program.
- Meeting with Owner, Consultant and solve all requirements.
- Manage Site Engineers and workers during construction period.
- Collect report from Site Engineer, analyse and coordinate with other Contractors on site in order to implement BMS properly.
- Prepare weekly report to Directors and Managers about progress on site.
- Inspect material, installation work, system integration with Owner and Consultant.
- Training and Hand over system.
I joined some projects, such as:
September 2011 - 2013: Implement and T&C BMS for Indochina Plaza Hanoi Project (239 Xuan Thuy - Cau Giay - Hanoi): On-Site Manager.
April 2011 - September 2011: Implement and T&C BMS for VTV project: On-Site Engineer
November 2010 - April 2011: T&C BMS, CCTV System for Crowne Plaza Complex Project: On-Site Engineer.
September 2010 - November 2010: T&C BMS and CCTV system for Grand Hanoi Plaza Project: On-Site Engineer.

Internet Service Core System Infrastructure Engineer à FPT Telecom
  • Vietnam
  • juillet 2009 à septembre 2010

FPT Telecom is an Internet Service Provider. My responsibility is:

1. Planning:
- Schedule development plan and maintenance plan for Internet Service Core System Infrastructure.
- Report to Managers and Directors about development progress.

2. Engineering:
- Assembly hardware, setup and configure core equipment for Internet Service Provider.
- Manage equipment storage used for Internet Infrastructure development and maintenance.
- Overcome, repair errors for Fibre Optical Transmission System Internet Distribution System.

3. Customer Care:
- Setup service for the new Internet Subscriber.
- Maintenance errors and support for subscribers.

Éducation

Master, Electronic Engineering
  • à Military Technical Academy
  • juin 2012
Diplôme supérieur, Electronic and Telecommunication
  • à Military Technical Academy
  • octobre 2011
Baccalauréat, Electronic and Telecommunication
  • à Military Technical Academy
  • octobre 2006

Specialties & Skills

Building Management System BMS
Aviation Operations
COMPUTER HARDWARE
CONSULTING
GRAPHIC DESIGN
PROGRESS
SPECIFICATION

Langues

Anglais
Expert

Loisirs

  • Sport, Music, movie