20” and 24” Inch 350 KM Yanbu - Jeddah Pipelines, Yanbu Tank Farm Package, Yanbu Distribution Hub CMEI Package, North Jeddah Bulk Pant Expansion and Vapor Recovery Unit North Jeddah Bulk Plant
• Effective participation in Saudi Aramco internal audits and Contractor/subcontractor full QMS annual internal audits as per project approved Schedule Q
• Conduct Quality Assessments of contractor quality functions and obligations as per Schedule Q, site surveillance and critical focus assessment of special process procedure as per SAEP-1150
• Review and approval of WPS against ASME Sec IX, API 1104, AWS D1.1 and SAEP-352 guidelines
• Review, comments and approval of method statements and quality control special process procedures as per Schedule Q, Attachment IV
• Review and approval of Welder Job Clearance Card as per SAEP-324 guidelines
• Receiving inspection of incoming welding consumables and construction materials against IFC drawings and as per MTC & ASME II Part C & A
• Witness Request for Inspection (RFI) and maintain Saudi Aramco Application for Inspection of Facilities (SAIF), Quality Management Information System (QMIS) and Enterprise Project Management (EPM) software
• Conduct Visual Inspection of Joint fit-up, In-Progress and Post Welding of piping, tank and structure as per approved WPS, IFC drawings and ASME B31.3, B31.8, B31.4 and AWS D1
• Review and ensure all calibration certificates & tags of weld machine, measuring tools and pressure & temperature gauges as per Aramco specifications
• Perform focus assessment and site surveillance against the project construction activities
• Review and approval the weekly and monthly deliverables i.e. weekly weld production report, welder repair rates, defect analysis report and monthly quality management report.
• Prepare and submit the project quality inspection (PQI) score sheet and project productivity index (PPI)
• Raise Log Book Entries and made follow up of contractor INCR as per SAEP-381
• Monitoring indoor and outdoor construction material preservation, handling and storage in accordance with approved project preservation plan
• Coordinate for Non Destructive examination of welds (RT/UT/MT/PT) acceptance in accordance with ASME Section V, approved quality procedures and ITPs
• Conduct tank in & out of service inspection activities as per API STD 653 & API RP 575 & 00-SAIP-75
• Conduct process piping in service inspection as per API STD 570 & 00-SAIP-75
• Conduct pressure vessel inspection as per API STD 510 & 00-SAIP-75
• Conduct inspection and verify cleaning activity of AC chillers tube as per Carrier operating and maintenance manual
• Selection of Corrosion monitoring locations and monitoring of UT thickness measurement
• Witness Hydro & Pneumatic test as per approved procedure, ASME B31.3 & API 1110
• Review of test package and walk down the line after completion of construction work in accordance with approved IFC drawing
• Inspection of drying, chemical cleaning and service test of lines and stainless steel passivation activity
• Review project quality dossiers and present it to Saudi Aramco
• Liaison with Aramco project quality manager, site management staff and contractors regarding on-going project and in-service inspection activities and expedite the balance work in order to complete piping and pipeline priority systems along with QHSE matters
- مجال الشركة:
- الاستشارات الهندسية العامة
- الدور الوظيفي:
-
مراقبة الجودة