Project Engineer
SIEMENS Ltd
مجموع سنوات الخبرة :17 years, 10 أشهر
Project Engineer
• Managing all the Technical aspects of 110KV, 230KV Power Cables.
• Takes approval of GIS & Transformer Sealing ends from the Client as per the Specification of the Power Cables from their Cross-section. (630mm². 800mm², 1000mm², 1200mm², 2000mm²).
• Star Point Connection through Link Box (SVL, without SVL).
• Handling of 110KV Projects of Saudi Electricity Corporation like AL-Yamamah Substation, Al Ajwad Substation
Fiber Optics
• Project Management through designing of topology & Ordering the material as per the requirement of Client .
• Termination & Jointing of Fiber Optics through Fusion Splicing Technique using Splicing machine.
• Testing of Fiber Optics Cable using Optical Time Domain Reflectometer (O.T.D.R).
Current executing project of Underground 110kV project named as Construction & Installation of 110kV Power Cable for Salama-2, Khumra and Taif-2 in Western Region.
I am solely responsible of the Profit /or Loss in the Project and implementing the Global standard of Managing the project by PMI methodology.
As a Siemens employee, s (Equivalent to PMP) is implemented and use in Projects.
My communication skill with the Subcontractor, Suppliers and Client and coordination always appreciated by the Management which is one the most useful factor to successfully complete the Project.
• Handles installation & critical troubleshooting regarding PABX & Software.
• Handles work related to PANASONIC Video Conference Devices like "POLYCOM" which communicate through ISDN & IP.
• Completed my project successfully that included an assignment to formulate & structure an "Alarm system" to indicate & warn against an instant & aggressive up-side fluctuation (shoot-up) in voltage level.
• Used ADC (Analogue to Digital), Amplifier & Transistor to structure the system.
• Completed my project successfully that included an assignment to
formulate & structure an "Alarm system" to indicate & warn against an
instant & aggressive up-side fluctuation (shoot-up) in voltage level.
• Used ADC (Analogue to Digital), Amplifier & Transistor to structure the
system.
• Completed a project that dealt with "Switched Telecommunication Services" like Free-phone, Virtual Private Networks & Calling Card Calls.
• It concisely featured distinct working & study on segregation of the "Services Intelligence" from the "Network Switching Function" for the purpose of development & upgrading.
• Had comprehensive & systematic training on PLC, Hydraulics, Electro Pneumatics and DCS.
• Probed in to the study of Mitsubishi PLC series FX1S to learn implementation of Distributive Control System. Learned about Electro-pneumatics \[combination of Electric (PLC) & Pneumatics\].
Final Year Project on "Valley Car Parking", featuring sensors & S7-300 Modular PLC. Project on Traffic Control signals (Microcontroller 8951 Based) Project on Networking of ATMs of Habib bank Ltd. (a major bank in Pakistan) Presented an extensive study on "Difference between CDMA & CDMA 2000" in an informative seminar. University's Final Year project on "Valley Car Parking" was graded 3.70 (out of total 4) Presented a study on DSP (Digital Communication) that was ranked high on the evaluation scales
It is Biscally Siemens Online Certification in AC drive and AC motors.In which we learn different types of Drive and motors use in AC . Now Preparing for Dc drives and Motors
I got 72% in my acedamics year of Collage