Muhammad Umair Khan, Assistant Manager (IT)

Muhammad Umair Khan

Assistant Manager (IT)

Board of Revenue Govt of Sindh, PMU (Land Administration Revenue Management Information System)

Lieu
Pakistan
Éducation
Master, Telecommunication
Expérience
17 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 1 Mois

Assistant Manager (IT) à Board of Revenue Govt of Sindh, PMU (Land Administration Revenue Management Information System)
  • Pakistan - Karachi
  • Je travaille ici depuis avril 2014

 Supervise all daily and weekly IT operations, procedures, report directly to District Manager
 Design, Implement Preventive Maintenance for all IT hardware & software.
 Manage additional responsibilities including troubleshooting, file back-ups, regular updating, and retrival of data, as and when required.
 Checking daily back-ups, all system interfaces, Server hardware and logs.
 Supervision of Data Processing Assistants.
 Follow-up all claims that are being forwarded to IT Department.

Transmission Engineer à KONNECT HOLDEN (Pvt) Ltd. (Telenor Pakistan Operation Project)
  • Pakistan - Hyderabad
  • juin 2013 à mars 2014

 Responsible for Trouble Shooting Of NEC iPASOLINK Microwave Equipment (100/200/400/1000)
 Responsible for Trouble Shooting Of ZTE BTS (BS8700/BS8900A/W301) Commissioning and its integration to the BSC

Site Engineer à Advanced Technology Services (ATS). (Telenor Pakistan Implementation Project)
  • Pakistan - Hyderabad
  • avril 2013 à juin 2013

 Responsible for ZTE BTS (BS8700/BS8900A/W301) Installation Commissioning and its integration to the BSC \n Installation Commissioning & Trouble Shooting Of NEC iPASOLINK Microwave Equipment (100/200/400/1000)

BSS Engineer à MYSON ENGINEERING SYSTEMS. (Mobilink Pakistan Operation Project)
  • Pakistan - Hyderabad
  • mars 2013 à avril 2013

 Responsible for ALCATEL BTS Commissioning and its integration to the BSC \n Responsible for Operation and maintenance & trouble-shooting of BTS. \n Responsible for GSM KPIs, Worst Cell and Quality Issues \n Installation of Sectors and TRX (ALCATEL Equipment) \n Commissioning of SUMA Card (ALCATEL Equipment) \n Measuring VSWR and Clearing faults in Feder cable and Jumper through Site Master \n BTS Commissioning (Configure Microwave Links) \n Installation of STM1 Radio PASOLINK NEO (NEC Equipment) \n Testing of Installed Equipment.

NOC Engineer à KONNECT HOLDEN (Pvt) Ltd. (Telenor Pakistan Operation Project)
  • Pakistan - Hyderabad
  • août 2012 à février 2013

 Supervising Network Operation Centre South II. Mobilized teams for Corrective Maintenance \n Quarterly Messaging & Emails to Client for Updating 475 sites of Telenor Operation & Maintenance Status. \n Ensure Reporter of SLA. Coordinate between Telenor & Huawei / ZTE on different job assignment. \n Assign duties to Trouble Shooter & Service Personnel on daily basis. \n Maintain Technicians-Supervisor & NOC (Network Operation Center) duty roster. \n Discuss and resolve the sites issues with Telenor NOC (Network Operation Center) Islamabad.

NOC Engineer à PEOPLELOGIC PAKISTAN. (Telenor Pakistan Operation Project)
  • Pakistan - Hyderabad
  • septembre 2011 à juillet 2012

 Supervising Network Operation Centre South II. Mobilized teams for Corrective Maintenance \n Quarterly Messaging & Emails to Client for Updating 475 sites of Telenor Operation & Maintenance Status. \n Ensure Reporter of SLA. Coordinate between Telenor & Huawei / ZTE on different job assignment. \n Assign duties to Trouble Shooter & Service Personnel on daily basis. \n Maintain Technicians-Supervisor & NOC (Network Operation Center) duty roster. \n Discuss and resolve the sites issues with Telenor NOC (Network Operation Center) Islamabad.

IT Officer à Royal Institute of Medicine and Surgery
  • Pakistan - Karachi
  • mars 2008 à août 2011

IT Operations

Transmission Engineer à SOLUTION & SERVICES (Pvt) Ltd. (Telenor & Ufone Pakistan Implementation Project)
  • Pakistan - Karachi
  • mars 2007 à janvier 2008

 Installation, Commissioning & Trouble Shooting Of Microwave Equipments PDH, SDH & XPIC \n LOS & TSSR Surveys for Microwave Links \n Siemens SRAL Equipment (Telenor) \n NEC Equipment (Telenor & Huawei Ufone)

Éducation

Master, Telecommunication
  • à Mohammad Ali Jinnah University Karachi
  • avril 2010

Specialties & Skills

Commissioning
Installation
Integration

Langues

Anglais
Moyen