Project Leader / Planning Engineer for Projects:
120 TPH Baggase Fired Boiler - Sugar Mill (In Progress)
30 TPH HRSG Boiler - F.F.C, Pakistan.
1.5 TPH Fire Tube Boiler - P & G, Pakistan.
7.4 TPH HRSG Boiler - Fertil, UAE.
25 TPH HRSG Boiler - Saudi Paper, KSA (Coordinated)
Technical assistance on
Kiln Heat Recovery Power Generation Project.
Cement Plant Extension to 6700 TPD Production Project.
Poly Propylene Bag Manufacturing Plant Project
B.Sc. (Chemical Engineering & Tech.) - 75.35 % Two times awarded Merit Scholarship. Submitted Report on Manufacture & Analysis of Soap Based Greases. Research Thesis on Separation Of benzene from BTX using Distillation.