Umer Bhatti, Transmission Line Engineer

Umer Bhatti

Transmission Line Engineer

K-Electric

Location
Pakistan - Karachi
Education
Bachelor's degree, Electrical Engineering
Experience
9 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :9 years, 2 Months

Transmission Line Engineer at K-Electric
  • Pakistan - Karachi
  • My current job since August 2019

. Karachi Electric (August 2019 to still Present):
1.a)
Planning & Development and Design Review Team (Feb
2021 to Till date) (As a joint resource)
(Still present)
Duties and Responsibilities (Transmission Lines 500kV, 220kV
and 132kV)
• Structures spotting, finalization of route, preparation of plan and profile
in PLS CADD, Design criteria in PLS CADD, M4 modelling of PLS Pole
and PLS Tower models.
• Selection of conductor after ampacity calculations as per IEEE-738 as
per Load (in amperes) requirement shared by the Network study team.
• Supervision of Surveys.
• Preparation of Tentative Routes on Google Earth for bidding purposes.
• Preparations of Scope of works / BOQ, s and complete technical tender
documents including technical specifications required for the project as
per international applicable standards.
• Pre-Bid clarifications.
• Technical evaluation of bids proposals and finalization of vendors for
conductor, insulators, Towers / Poles with all allied hardware as per
specifications.
• Kick-OFF Meeting
• Preparations / Review of Sag and Tensions at initial conditions for
Loading calculations
• Review of Loading Calculations of Towers and Poles as per ASCE-74
and IEC-60826
• Calculations of Tower Top Geometry (i.e Phase to phase, phase to earth
and mid span clearances as per cigre and IEC-71.
construction supervision of UGTL
• Preparation / Review of Plan & Profile (Experience in both preparations
and review)
1.b) Execution-------Karachi Electric (August 2019 to Feb 2021)
Project -------- Rehabilitation of 220kV Twin Bundle, Double
Circuit BQPS-ICI-PIPRI Transmission Line
Duties and Responsibilities
• Review and approvals of conductor, insulators, OPGW with all allied
hardware detailed design documents.
• Review of Towers assessment for newly proposed conductor in
comparison with the already installed conductor i.e., transverse,
longitudinal and vertical loadings as per technical specifications loading
conditions i.e., 90° wind, 45°wind, Failure containment and Construction
& Maintenance.
• Tracking of Planned vs. Actual progress and highlights the areas of
concerns to contractor for timely completion of project.
• Supervision of detailed survey, Construction of foundations, towers
reinforcements and stringing as per approved design and protocols /
procedures.
• Hi-Pot Test
1.b.1)
Project -------- Construction of 220kV, Quad Bundle, Double
Circuit KDA - NPQ Transmission Line
Duties and Responsibilities
• Tracking of Planned vs. Actual progress and highlights the areas of
concerns to contractor for timely completion of project
• Supervision of detailed survey, civil works including stub settings and
earthing, erection, stringing, Testing & commissioning as per approved
drawings and protocols / procedures.

Transmission Line at K-Electric
  • Pakistan - Karachi
  • My current job since March 2015

I am PEC certified / Registered Electrical Engineer. As an individual who is interested in continuous
professional development, I have dedicated more than 8 years of experience to working with Companies
(KE, TBEA & BARQAAB) within the Power field. This has resulted in professional competency in all technical
aspects of Transmission Lines
I have experience of Transmission Lines and Grid Station works as following;
1. Designing and construction of 500kV, 220kV and 132kV Transmission Lines (including technical
data sheets, sag & tension, Loading calculations for Towers and Poles, PLS-CADD profiling,
construction of foundations, Erection, Stringing and Testing).
2. Construction of primary sides of 500kV Grid stations including cable terminations as per approved
schematics and testing of equipment.
3. Project scheduling on MS project and primavera P6.
4. Surveying and preparations of Tender documentsfor 500kV, 220kV and 132kV Transmission lines.

junior Engineer Electrical at consultancy
  • Pakistan - Lahore
  • May 2018 to August 2019

Barqaab Consulting Services (April, 2018 to August, 2019):
2.a) ±660kV HVDC Matiari - Lahore Transmission Line
(Portion)
• Supervision of erection of Towers, installation of insulator strings /
Hardware and Stringing of Conductor.
2.b) Project----------------220kV Mardan to Chakdara, D/C, T/B
Transmission Line)
Duties and Responsibilities:
• Making Monthly Progress reports along with the progress curve
comparison Planned v.s Actual.
• Supervision of detailed survey, civil works including stub settings and
earthing, erection, stringing, Testing & commissioning as per technical
specifications, approved drawings, and protocols / procedures.
2.c) Project------------------------------------------ 220kV Nowshera,
D.IKhan and Chakdara Substations (Barqaab)
Duties and Responsibilities
Making Monthly Progress reports along with the progress curve
comparison Planned v.s Actual.
• Made EOT case for three above mentioned Substations for consultant. • Made Schedule Vs Actual comparison for above mentioned substations
on primavera p6 with causes of Delay
.
2.d) Project----------------------------------- 500KV Gatti Grid Station
Extension (Barqaab)
Duties and Responsibilities
• Made a complete Schedule of Construction on primavera p6 and Ms
project.
• Made daily progress sheet in Excel with weightage of each activity
according to BOQ.
• Made S
-Curve according to cost weightage.
• Supervised Foundations, Erections and Testing of complete equipment
in 500kV and 220kV Switch yard including 600MVA ATB and installation
of H.L BB, L.L BB (Flexible conductor), Tubular Conductor including
earthing mesh
• Supervised the Cable laying and termination C. Bs and CTs, Isolators to
relay room, 50BF breaker failure relays, 87HV protection relay, 50/51
over current relays and 87 differential protection relays to WC
-1 and C2
installed in Control House Building according to approved schematics.
• Supervised the cable laying and termination from transformer fans to
cooling cabinets to L.C.C to transformer auxiliary panel and Transformer
protection panels.

Electrical Engineer at TBEA
  • Pakistan - Lahore
  • March 2015 to April 2018

3. TBEA EPC Contractor
(April, 2015
- March, 2018):
3.a) Project------------------------------------ 500KV New Lahore
Transmission Line (TBEA)
Duties and Responsibilities
:
• Supervision of foundations construction and stub setting. • Erection of Towers and Poles and stringing of conductor and OPGW • Supervised OPGW continuity Test through OTDR
3.b) Project------------------------------------ 500KV New Lahore
Substation (TBEA)
• Made a complete Schedule of Construction on primavera p6 and Ms
project.
• Made daily progress sheet in Excel with weightage of each activity
according to BOQ.
• Made S
-Curve according to cost weightage.
• Supervised Foundations, Erections and Testing of complete equipment
in 500kV and 220kV Switch yard including 600MVA ATB and installation
of H.L BB, L.L BB (Flexible conductor), Tubular Conductor including
earthing mesh
• Supervised the Cable laying and termination C.Bs and CTs, Isolators to
relay room, 50BF breaker failure relays, 87HV protection relay, 50/51
over current relays and 87 differential protection relays to WC
-1 and C2
installed in Control House Building according to approved schematics
Supervised the cable laying and termination from transformer fans to
cooling cabinets to L.C.C to transformer auxillary panel and Transformer
protection panels.

Education

Bachelor's degree, Electrical Engineering
  • at Comsats Institute Of Information Technology
  • March 2015

Bachelors in Electrical Engineer.

Specialties & Skills

Network Configuration
Machine Control
Network Troubleshooting
Transmission Line
primavera p6
materials
maintenance engineering
planning
quantity surveying
site inspection
supervising
project execution
on site

Languages

English
Expert

Hobbies

  • Transmission Line