Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
kamal kannan, Senior Engineer

kamal kannan

Senior Engineer·Aircel Ltd.,

India

Bachelor's degree, Electronics & Communication

Work experience

Total years of experience: 6 years, 10 months

Senior Engineer

November 2008 - August 2015

Aircel Ltd.,

Chennai, India

November 2008 - August 2015

 Configuration and maintenance of TRAFFIC NODE to provide ring Protection to the sites by SNCP.
 E1 provisioning for new cell sites & expansion sites.
 E1 re-routing and DIP (Digital Path) change as per planning.
 Operations & Maintenance of SDH and PDH Configuration & Testing of Ericsson SDH and PDH Microwave links and Stability testing for transmission equipments.
 Microwave Nodes and SDH, PDH Network transmission planning.
 Link capacity Bandwidth planning and up gradation as per planning.
 Technical support for maintaining the network and Link capacity up gradation as per planning.
 Breakdown maintenance and fault management of optical and Microwave link through NMS.
 Handling all kind of equipment related faults like card failure, synchronization & management related issues.
 E1 configuration / reconfiguration management and new node, Trail & Topology creation in NMS.
 All nodes taking PM reports, FM reports, Configuration reports and Back up throw NMS server, all nodes
 Regular Periodic Maintenance of site RBS & Microwave equipments by using proper tools and E1 routing from BSC to Site end.
 Performing the MW NW optimization; carrying out site dependency reduction, rerouting longer & fading hops.
 Maintaining NW Availability over 99.990%, ring protection for resilience and proposing new fibre pops.
 Maintaining NW Availability over 99.99%, Maintained near 1400 sites in our circle. (Chennai AIRCEL Network).
• Installation, Commissioning & Maintenance:
 ECI Micro SDM, XDM100, 500 & XDM1000.
 Ericsson OMS 846 & 860
 ERICSSON MW PDH & SDH Equipments.
• Technology Training:
 Basics of GSM Network by Agilent Technologies’ at Chennai
 SDH, PDH & TN MW equipments O&M by Ericsson at Chennai.
 ECI MUX (uSDM & XDM series) and NMS light soft V3/4 at Mumbai.
 Basics of DWDM training by Huawei at Coimbatore.
 Tejas Mux (TJ100ME, TJ1500&TJ1600 series) and EMS at Bangalore.
 3G(UMTS) Basic fundamentals taken by Nokia Siemens Networks
• Technology:

 Plesiochronous Digital Hierarchy (PDH)
 Synchronous Digital Hierarchy (SDH)
 Digital Cross Connection (DXC)
 Network Management System (NMS)
 Microwave Engineering & Operations


• Project & Planning in Aircel Cellular ltd., ( From 14 Nov. 2008 to 22 Dec 2011)

 Prepare Our New Circle Allocates sites list then send to Planning department and get the GSM & Microwave Antenna Height & Orientation Degrees.
 If RFI Declared Sites, I Directly Visit the sites and check the Infra Status (Tower & Shelter Room(Indoor), Outdoor Bed and Electrical Work ) .
 Check Mw Hop Line Of Sight Survey (LOS) in Farend Sites are cleared the Los.
 Our Planning Department given the BTS Band configuration (2G(900 & 1800)\3G).There after We Prepare Measurement of Materials (MOM) and Bill of Quantity (BOQ) in Accessories Materials of Infra Completed Sites.
 Ready to prepare Materials Request Sheet(SAP Module) for as per MOM & BOQ list Seperate Sites send to the Warehouse.
 Delivered the Materials sites from Warehouse, Check the Materials Physical Quantity and Dc copy Quantity are the same.
 Inform to installation Vendors Team, They are Started the installation work for BTS and Transmission as per our Frequency Planning Rules.
 If the Vendor Completed the Work, After I check the installation and find any Punch points then inform the Vendors team to clear as soon as possible.
 Commisioning the BTS & TransmissionEquipment.After the integrated sites and Halted.
 Finally check the Infra & BTS Completed work there is no Punch points, Then Activated the site and Montioring with in 48 Hours. After Handover to O&M Department.
 Configuration and maintenance of TRAFFIC NODE to provide ring Protection to the sites by SNCP.
 E1 provisioning for new cell sites & expansion sites.
 E1 re-routing and DIP (Digital Path) change as per planning.
 Operations & Maintenance of SDH and PDH Configuration

Company industry:
General Engineering Consultancy
Job role:
Engineering

Education

Sathyabama University

June 2015

June 2015

Bachelor's degree, Electronics & Communication

India

GPA (point): 17.5 out of 20

GPA (point): 17.5 out of 20

Aircel Cellular Ltd., Is a leading company of Telecom Industry, Providing Customers support in every time with well connected Network.

Skills

Wiring
Expert
Wiring
Expert
Java
Expert
Java
Expert
Machine Control
Expert
Machine Control
Expert
C
Expert
C
Expert
C++
Expert
C++
Expert
c,c++ Java, Ms Office
Intermediate
c,c++ Java, Ms Office
Intermediate
Java
Expert
Java
Expert
Ms Office
Expert
Ms Office
Expert
Wiring
Expert
Wiring
Expert
Machine Control
Expert
Machine Control
Expert
C
Expert
C
Expert
C++
Expert
C++
Expert

Languages

English
Expert
Hindi
Expert
Telugu
Expert

Training and Certifications

Certifications
GSM TRAINING
 GSM System training at Hindustan training limited
Mar 2009 - Mar 2009

Hobbies

  • Reading Books & Magazine
    I am Interested in Books & Magzaine , Playing Cricket and Football