Internee Engineer
Pakistan Ordnance Factories
Total years of experience :0 years, 4 Months
Load calculations for mechanical workshop and recommended centralized system for 300 tons
capacity, designed water pumps for 8-floor building and recommended 2 pumps of 0.5 cusec capacity
Detailed analysis of steam power plants each of capacity 27TR/hr. producing 4.8MW cumulatively.
and gas engines
Sheet rolling of Brass
Manufacturing of 9mm bullet shells
Performed Engine maintenance of V8, GLI, Fortuner
Sales management of spare parts
Performed Quick delivery check for PDS
Academic Projects: Development of pipeline leakage detection and localization system using IOT (FYP) Vehicle speed limit controller using Arduino Flame detection robot using Arduino 3D modelling of flange coupling and its assembly Design and analysis of rope for ski lifts Eco assessment analysis of circuit breaker 2D and 3D modelling of pipe vice Failure analysis of extension spring used in motor bike Fabrication of beam deflection apparatus Fabrication of metal hammer Achievements: Final year project fully funded by Sui Northern Gas Private Limited (SNGPL) Overall 2nd position in mechanical department (5th semester -3.98 SGPA)