Project In change
Sperry Internationa
Total years of experience :16 years, 0 Months
1. Papering Project BOQ, Attained meeting with Consultant and owner of the Project, Go through Drawing, Asses Project duration and Project materials. Project Team mobilization, Supervised Project work progress in regarding of Project Completion time schedule . Drawing re- design or re- draw installation route based on actual site condition . Continuous sharing updated information with Office and the owner of the project . Resolve the installation problem discussing with the Proper Authority .
2. Visit Power Plant, cement Factory, Paper mill, Petroleum Refinery for Business development Purpose .
3. Design and drawing of Fire Detection and Protection system according to National Building
code, NFPA and BS standard .
4. Site visit and installation of metering system and guessing system in petrochemical Refinery industries
5. Preparing Official document for the customer and the project .
6 . Participate and Prepare document for tender Bid .
1. Teaching technical and general subject for the Underprivileged Student .
2. Conduct meeting with student guardian to develop their moral and social ethics .
3. Counseling to the Underprivileged people to improve their awareness in all social respect such as Education, health and safety, sanitation, drug and so on.
4. Arrange program for different national and social occasion .
1.Troubleshooting, maintenance and assistance to
commission of CNG compressor.
2. Installation of CNG compressor equipment and
required piping .
3. Frequent service for the the running CNG
compressor in case of trouble
I have had my B.Sc in EEE degree form University of Information Technology and Science in 2014.