Total Years of Experience: 5 Years, 8 Months
February 2012
To September 2017
General Manager
at Mosca Malaysia Sdn Bhd
Location :
Malaysia
Managing Operations including Plastic Strapping Manufacturing and Assembly of Semi-Automatic Strapping machines
Increased Strapping Capacity by Optimization from 120 K rolls to 180 K Rolls
Increased Machine Assembly Capacity from 35 machines per month to 100 machines per month by moving to new facility in 2013
Achieved Productivity Increase of 33 %, Quality Optimization of from 29 complains per year to 1 complain per year.
Establish Proper Bill of Material, Routing and achieve proper stock controls, Introduced KANBAN System, Lean Manufacturing Concept Saved Assembly Space 50% and Stock Reduction from RM 2.5 million to RM 1.5 million
Establish Costing System, followed by transfer pricing concept with Penalty and Reward System
Develop Flexibility Tester for PP Straps
Increase Profitability in 2 plants from breakeven results to 11 % Per Year
Increased Strapping Capacity by Optimization from 120 K rolls to 180 K Rolls
Increased Machine Assembly Capacity from 35 machines per month to 100 machines per month by moving to new facility in 2013
Achieved Productivity Increase of 33 %, Quality Optimization of from 29 complains per year to 1 complain per year.
Establish Proper Bill of Material, Routing and achieve proper stock controls, Introduced KANBAN System, Lean Manufacturing Concept Saved Assembly Space 50% and Stock Reduction from RM 2.5 million to RM 1.5 million
Establish Costing System, followed by transfer pricing concept with Penalty and Reward System
Develop Flexibility Tester for PP Straps
Increase Profitability in 2 plants from breakeven results to 11 % Per Year
Share on Facebook
Share on Twitter
Share Via Email