Vani Maniar, Estimator

Vani Maniar

Estimator

Danway Industry, Aluminium & Glass division,

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, B.E. Civil
Expérience
8 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :8 years, 9 Mois

Estimator à Danway Industry, Aluminium & Glass division,
  • Émirats Arabes Unis - Abu Dhabi
  • octobre 2008 à novembre 2014

Quantity Surveyor / Estimator
• Estimating for Aluminum, glazing works
• Preparation of costing sheets
• Quantity take-off and Supplier enquiries
• Preparation of BOQ, Quotation
RESPOSIBILITES :
Quantity surveying & Estimation

Project Study

(1)Study the specific scope of works to be priced
(2)Study the consultants specification which includes general & particular specifications
(3)Study the consultants supplied B.O.Q.
(4)Refer the consultants specified manufacturer/supplier list
(5)Prepare Specification summary

Enquires

(1)Send enquires to suppliers for the following items :
(a)Aluminium system as per Manufacturer list
(b)Glass as per consultant specifications
(c)ACP Cladding as per consultant specification
(d)Automatic / Manual operator if any
(e)Any type of special accessories/Item

Quantity Surveying

(1)Abstracting the floor wise CW, windows / doors, ACP Cladidng, Handrail, Pergola, Skylight etc. quantities by identifying the assigned numbers in the architectural drawings. Finally summarizing it in the form of B.O.Q.

Price Calculation

(1)Prepare item wise costing sheet & Summary of Costing Sheet

Project Analysis and Break up

(1)Short abstract for quick reference of the cost and marging of project and necessary consideration
(2)Break-up of project includes a detailed price abstract of the project including the factor of costing such as Aluminium cost, glass cost, accessories cost, Labor Cost, overheads, margins etc.

Quotation & B.O.Q.

(1)All considerations and exclusions
(2)General conditions and facilities to be provide by main contractor
(3)Payment terms
(4)Total scope of works
(5)Validity of quotation
(6)B.O.Q. includes item wise description of quantity, unit prices and total price

Preparation of variations during execution of projects

Asst. Manager Technical à WASMO
  • Inde
  • octobre 2005 à avril 2008

• Project Study
• Enquiries
• Quantity surveying
• Price Calculation
• Quotation & B.O.Q.

Éducation

Baccalauréat, B.E. Civil
  • à L.E.College, Morvi, Gujarat, India
  • juin 2003

Specialties & Skills

Langues

Anglais
Expert
Hindi
Expert
Gujarâtî
Expert