Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
VASILEIOS GEORGAS, Senior Project Manager

VASILEIOS GEORGAS

Senior Project Manager·Linesight

Greece

Master's degree, Mechanical Engineering

Work experience

Total years of experience: 16 years, 1 months

Senior Project Manager

September 2025 - Present

Linesight

Groningen, Netherlands

September 2025 - Present

 Provided Project and Contract Management and Subject Matter Expert services as Mechanical Owner’s Rep.
 Early works development, work package alignment with project goals, scope, and specification localization.
 Developed detailed project plans and localized constructability reviews of deliverables to guide progress.
 Identify and mitigate risks proactively through Early Warning Notices, updating management plans as necessary.
 Review of Change Order requests and highlight potential Scope gaps.
 Engaged in Procurements process from Production to Delivery of Owner’s Furnished Equipment and Owner’s Negotiated Contractor’s Procurement for Fit-out and Field Integrated Assembly
 Conduct periodically status evaluations to capture lessons learned and future proof project expansions.
 Managed multiple international contractors and key stakeholders across a confidential hyperscale data center development, ensuring alignment of scope, schedule, risk, and project objectives.

Company industry:
Management Consulting
Job role:
Management

Owner's / Resident Engineer

November 2024 - July 2025

AFRY

Alexandroupoli, Greece

November 2024 - July 2025

AFRY International, Alexandroupolis, Greece, Client: Alexandroupolis Electric Power Nov 2024 - Present
Project: Alexandroupolis CCGT Power Plant (840 MW Nom. Output) (EPC - Lump Sum Turn Key (LSTK))
Contract Budget: 357, 800, 000 Euro
Position, Owner’s (Resident) Engineer- Lead Mechanical
- Provided Project Management, Contract Administration Subject Matter Expert services during the EPC period.
- Owner Resident Engineer services for the Construction / Installation of a Combined Cycle Gas Turbine (CCGT) power plant in the Industrial area of Alexandroupolis, Greece.
- The power plant will utilize one H-class gas turbine (GE Vernova) which will burn natural gas (single fuel) and will produce a net electrical power output of 820 MW, on a single shaft configuration. The steam turbine exhaust will be condensed through an Air-Cooled Condenser (ACC), and the electrical power will be evacuated through the 400kV GIS to the grid.

Company industry:
General Engineering Consultancy
Job role:
Consulting

Project Management Consultant

April 2024 - October 2024

Northvolt

Skelleftea, Sweden

April 2024 - October 2024

roject: Expansion of Plant Facilities (DS4/FA3)- Battery Manufacturing Plant
Overall Investment: 4, 000, 000, 000 Phase II Budget: 300, 000, 000
Position, Project & Construction Management Consultant - Mechanical Lead
- Project Management, Monitor & Control Subject Matter Expert services during the Phase-II Plant Expansion
- Engineering clash analysis & Constructability review of the Mechanical Work Packages (HVAC, Process Utilitites,
and MEP Services). Process Equipment interface coordinator
- Preparation of Management Executive Summary and Progress Evaluation reports.
- Multi-disciplinary Sub-Contractors coordination Schedule review and development of Interface register.
- Development of Sub-Contract Procurement and Work Packages; Evaluation of Bidders and Vendors.

Company industry:
General Engineering Consultancy
Job role:
Consulting

Owner's Resident Engineer

October 2022 - April 2024

Hill International

Komotini, Greece

October 2022 - April 2024

Project: Construction of Komotini Power Plant CCPP Output 877MW (EPC - Lump Sum Turn Key (LSTK))
Contract Budget: 345, 000, 000 Position,
Owner’s (Resident) Engineer

- Provided Project Management, Contract Administration Subject Matter Expert services during the EPC period.
- The Komotini Power plant is equipped with one Siemens SGT5-9000HL Gas Turbine, one SST5-5000 Steam turbine, and one heat recovery steam generator (HRSG) in a 1x1 combined-cycle configuration.
- The gas turbine is connected to a SGen5-3000W generator, while the steam turbine is connected to a SGen5-1200A
generator. The plant will have a rated power output of 877MW and use Siemens SPPA-T3000 control system for safe and efficient operation.

Company industry:
Electric Power Production & Transmission
Job role:
Consulting

Resident Construction Engineer

September 2019 - September 2022

Parsons - Saudi Arabia

Yanbu, Saudi Arabia

September 2019 - September 2022

Project Management/Construction Management services on behald of Royal Commissioning for Yanbu

With minimal supervision, independently performs all aspects of field engineering assignments including development of plans, schedules, contracts, procedures, and construction methods and systems for an assigned project, or a designated area of a large project.
Performs difficult and very complex field engineering assignments involving the development, execution, supervision, and coordination of all technical aspects of a construction project.

Company industry:
General Engineering Consultancy
Job role:
Consulting

MEP Construction Manager

March 2018 - September 2019

SAUDI ARCHIRODON LTD

Eastern Province, Saudi Arabia

March 2018 - September 2019

MEP Construction Manager
Project: Upgrade Pier Facilities, Lump Sum Turn Key (LSTK) Contract
Client: Saudi Arabian Oil Company (Saudi Aramco)
Budget: $131, 290, 000

Main scope involves:
- Construction of 9 new and 15 fully refurbished Berths with the corresponding Utility Stations;
- Upgrade the Diesel Fuel, Potable Water and Fire Fighting, Compressed Air and Electrical Power & Instrument Cable systems (green & brown field) with fully automated controls
- Installing new Fire Water, Potable Water & Diesel Fuel pumps & accessories,
- Air compressors with integrated Dryers and Air Receivers
- Demolish existing lifting/pumping stations (Sanitary & Oily Water) and install new fully automated control; Refurbish and Upgrade corresponding treatment Plants
- Construction of an API 650 Diesel Tank and Safra Oil tanks with corresponding pump stations

Major Activities:
Management of the Mechanical & Electrical Construction Team
- Responsible for the timely completion of all Mechanical & Electrical scope
- Responsible for the efficient review and adherence to all Client’s requirements & job specifications and procedures
- Optimization of Budget, scheduling and resourcing of main works
- Review of Engineering from FEED to Detailed Design and Materials Procurement
- Construction supervision, methodology implementation and activities coordinator
- Safety, Risk Assessment / Management and Process Optimization

Company industry:
Construction & Building
Job role:
Mechanical Engineering

MEP Construction Manager

March 2017 - March 2018

Archirodon Construction

Yanbu, Saudi Arabia

March 2017 - March 2018

Electro-Mechanical Construction Manager
Project: Rehabilitation Of Al Mu’ajjiz Terminal in Yanbu, Lump Sum Procure Basis (LSPB) Contract
Client: Saudi Arabian Oil Company (Saudi Aramco)
Consultant: Japan Gas Company (JGC)
Budget: $58, 200, 000

Major Activities
- Management of the E-M Construction Team during the refurbishment of 3 Marine Berths
- Construction supervision and methodology implementation and activities coordinator
- Responsible for the construction of the Crude Oil, Fire Water, Oily Water Drains, Potable Water and Sewer pipeline and piping in the Causeway and 3 Marine Berths
- Completion of the erection and installation of the various rotary and static refurbished equipment (Loading Arms, Sump Tanks &Pumps, Fire Water Foam skid, Surge Relief Pressure Vessels Weather monitoring system, Quick Release Hooks)
- Procurement of Materials (except Aramco supplied materials)
- Preparation for Testing, Pre-Commissioning & PMCCs
- Punchlisting & Close out
- Preparation of As Built-Drawings

Company industry:
Construction & Building
Job role:
Management

MEP Construction Manager

May 2015 - March 2017

Archirodon Construction

Riyadh, Saudi Arabia

May 2015 - March 2017

Project: Riyadh Power Plant 14 (RPP14) Procurement and Construction of Early And General Civil Works
Client: Saudi Electricity Company (SEC)
Consultant: Worley Parsons (WP)
Budget: $116, 732, 209

Construction supervision and methodology implementation of the project’s electro-mechanical scope which pertains but is not limited to:

Management of the Construction Team
The procurement of conduits and the installation and testing of the Electrical Duct Banks
The procurement, installation and testing of the Grounding networks
The installation of the Underground Piping Drain and Storm Water Drain networks
The engineering evaluation and installation of the Cathodic Protection System for the Underground steel pipes and for the steel tanks
The engineering evaluation and installation for the street lighting system
Responsible for the take-off and re-measured quantities of the permanent construction materials
Preparation of welding documentation (Weld map, WPSs, PQRs, Certification & NDT examination)
Coordination of main works with the Project’s other Sections
Scheduling the work according to project needs
Responsible for engineering evaluation and material submittals
Checking and reviewing the process of works and ensuring proper reporting and invoicing

Company industry:
Construction & Building
Job role:
Construction and Building

Mechanical Section Head Engineer

October 2011 - May 2015

Archirodon Group NV

Jeddah, Saudi Arabia

October 2011 - May 2015

Mechanical Section Head Engineer
Project: Expansion of SRF in KFNB - Jeddah
Client: Kingdom of Saudi Arabia - Royal Saudi Naval Forces
Consultant: Arabian Consulting Engineering Center (ACEC)
Budget: $199, 034, 363

Major Activities Completed
Construction supervision and methodology implementation of the project’s mechanical scope which pertains but is not limited to:
- The installation of the main pipeline networks (Potable Water, Sea water, Sanitary, Compressed Air, Diesel fuel & Hydraulic System) and the corresponding pumping stations and air compressors room including the installation of two diesel fueled generators (1200 & 800 kW)
- Coordination of main works with the Project’s other Sections
- Organizing and monitoring of daily production including the preparation of fabrication drawings
- Scheduling the work according to project needs
- Preparation of the Project Controls required tables for the monthly executed works & invoiced quantities
- Responsible for engineering evaluation and submittals
- Preparation of welding documentation (Weld map, WPSs, PQRs, Cetification & NDT examination)
- Modifying the design when necessary as per site conditions
- Responsible for the take-off and re-measured quantities of the permanent construction materials
- Monitoring the material procurement and evaluating the involved QC documentation as per project’s requirements
- Systems Initial Start-up, Commissioning & Troubleshooting
- Punchlist items handling & Close out
- Client’s operators training & Handing Over

Company industry:
Construction & Building
Job role:
Engineering

Site Engineer

February 2011 - October 2011

Saudi Archirodon Construction

Saudi Arabia

February 2011 - October 2011

Name and address of employer: Saudi Condreco \[Branch of Archirodon Group NV\]
Type of business or sector : Construction

Dates February 2011 - October 2011
Position held
Site Engineer
Project: Shoaiba Power Plant Extension, Stage III, Saudi Arabia
Client: Saudi Electricity Company
Consultant: A.M. Al-Issa (Al Issa-Kujlian) Consulting Engineers
Budget: $ 324, 703, 000

Main activities and responsibilities
Major activities completed: The evaluation and repair method study for the restoration of the project's two oil storage tanks (43m radius) bottom plates, to their initial life span, due to pitting corrosion as per API 653.
The construction supervision and the implementation of the repair method study, including the preparation of fabrication drawings and the procurement of the necessary materials
Recording of activities and reporting to the Management
Prepare documentation (Method Statement, Risk Assessment, Fabrication Drwgs) and follow up activities
Co-ordination and joint inspections with client's consultant engineers

Company industry:
General Engineering Consultancy
Job role:
Civil Engineering

Self-employed freelance Mechanical Engineer

May 2010 - February 2011

Self-employed freelance Mechanical

Greece

May 2010 - February 2011

Dates May 2010 - February 2011
Self-employed freelance Mechanical Engineer

Main activities:
Building design E/M drawings
Technical calculations and studies preparation for HVAC systems, Elevators, Photovoltaic panels

Company industry:
General Engineering Consultancy
Job role:
Mechanical Engineering

Education

Aristotle University of Thessaloniki

January 2009

January 2009

Master's degree, Mechanical Engineering

Greece

Dates 2001-2009 Master's Degree (5Yrs) in Mechanical Engineering Energy Section - Specialty: Department of Computational Fluid Dynamics Dissertation Thesis: Carbon Dioxide Capture from Fossil-fueled power stations: assessment of the technologies available and preliminary techno-economic analysis Aristotle University of Thessaloniki Polytechnic School Faculty of Mechanical Engineers

Skills

Oil and Gas

Expert

MEP

Expert

Contract Management

Expert

Construction Management

Expert

Engineering

Expert

API

Intermediate

COMPRESSORS

Intermediate

CONSTRUCTION MATERIALS

Expert

ENGINEER

Expert

HVAC SYSTEMS

Expert

Construction Management

Expert

Project Management

Expert

PHOTOVOLTAIC

Intermediate

BUILDING DESIGN

Intermediate

BUDGET

Expert

Contract management

Expert

Procurement

Expert

Planning

Expert

Engineering

Expert

Piping

Expert

Languages

English

Expert

French

Beginner

Greek

Native Speaker

Arabic

Beginner

Memberships

Saudi Council of Engineers

Member

March 2013

Technical Chamber of Greece

Member

April 2009

Project Management Institute

Member

June 2024