Associate Director Operations
AECOM ASIA LIMITED,NEW DELHI
Total years of experience :12 years, 4 Months
On Vizag Smart City project on water supply and sewerage projects worth Rs 150 crores in Andhra Pradesh.
To implement 24X7 water supply scheme. Analysis, design review of water pumping stations and reservoirs, water transmission mains and waternetwork in ABD area in Visakhapatnam. Analysis, design review of sewage pumping stations, sewer pumping main, sewer network and sewage treat ment plants. Monitoring of project progress on weekly basis to evaluate time to time .
On Amrut project covering 17 towns and cities water supply and sewerage projects worth Rs 3050 crores in Madhya Pradesh.
Analysis, design review of water intake structures, water transmission mains and pumping stations and water treatment plants, Analysis, design review of sewage pumping stations, sewer pumping mains, sewer network and sewage treatment plants.Monitoring and execution of pipelines, intake structures, distribution pipelines, water treatment plants and sewerage networks sewage treatment plants, green space developments, barrage, etc
On Kochi Smart city project for design of sewerage network in Kochi city.
Prepared water harvesting feasibility report to do rain water harvesting. Prepared sewerage system feasibility report on vacuum sewer network, pumping stations and sewage treatment plants.
O& M of waste water treatment plant for modification to improve performance to meet pollution control authority guidelines and evaluation of unit by unit based on waste water characteristics analysed in the laboratory. To implement HSE guidelines as per statuary requirements.
Team Size: 38
Key Result Areas:
* Managing operation and maintenance of sewage pumping stations and treatment plants in Doha west area for Ashghal
* Working in coordination with Ashghal for do day-to-day operations of sewage pumping stations as per requirements
* Generating monthly reports, HSE and QA & QC reports
* Monitoring the compliance with defined parameters as per HSE and quality standards at national & international levels
* Ensuring the compliance of all activities with safety norms and project execution as per time, budget & quality norms
* Ensuring documentations & verification of billings & invoices as per the company policies
* Formulating budgets and analyzing variances between projected & actual costs and implementing corrective actions to rectify the same
* Designed water and sewerage systems for many cities around the world
Significant Accomplishments:
* Led high net-worth project worth INR Crores/ US$ Million involving an esteemed set of clientele including PDO, National Water and Sewage Corporation, DEWA, Putrajaya, Metro Water, Chennai, Delhi Jal Board, Ashghal and others
* Initiated the timely execution of Putrajaya Water Supply Project, Cooperative Sugar Factories Wastewater Treatment Plants, Kuala Lumpur Water Supply and Kelanajaya Sewerage Systems, Jinja Water Treatment Plant projects within budget; implemented cost control strategies such as proper planning and in time procurement of material and equipment as well as effective estimates for site infrastructure.
* Managed the construction & widening for KM pipe laying and 3 no reservoirs, waste water treatment plants projects worth INR Crores / US$ Million in Kuala Lumpur / Visakhapatnam / Kampala /Dubai/ Muscat city for Putrajaya/ State Government Authorities/ National Water and Sewage Corporation/ PDO Authority
Jun'- Dec Tebodin LLC, Muscat as
Team Size: 38
Key Result Areas:
* Managing operation and maintenance of sewage pumping stations and treatment plants in Doha west area for Ashghal
* Working in coordination with Ashghal for do day-to-day operations of sewage pumping stations as per requirements
* Generating monthly reports, HSE and QA & QC reports
* Monitoring the compliance with defined parameters as per HSE and quality standards at national & international levels
* Ensuring the compliance of all activities with safety norms and project execution as per time, budget & quality norms
* Ensuring documentations & verification of billings & invoices as per the company policies
* Formulating budgets and analyzing variances between projected & actual costs and implementing corrective actions to rectify the same
* Designed water and sewerage systems for many cities around the world
Significant Accomplishments:
* Led high net-worth project worth INR Crores/ US$ Million involving an esteemed set of clientele including PDO, National Water and Sewage Corporation, DEWA, Putrajaya, Metro Water, Chennai, Delhi Jal Board, Ashghal and others
* Initiated the timely execution of Putrajaya Water Supply Project, Cooperative Sugar Factories Wastewater Treatment Plants, Kuala Lumpur Water Supply and Kelanajaya Sewerage Systems, Jinja Water Treatment Plant projects within budget; implemented cost control strategies such as proper planning and in time procurement of material and equipment as well as effective estimates for site infrastructure.
* Managed the construction & widening for KM pipe laying and 3 no reservoirs, waste water treatment plants projects worth INR Crores / US$ Million in Kuala Lumpur / Visakhapatnam / Kampala /Dubai/ Muscat city for Putrajaya/ State Government Authorities/ National Water and Sewage Corporation/ PDO Authority
Jun'- Dec Tebodin LLC, Muscat as
Team Size: 12
Key Result Areas:
* Managing operation and maintenance of sewage pumping stations and treatment plants in Doha west area for Ashghal
* Working in coordination with Ashghal for do day-to-day operations of sewage pumping stations as per requirements
* Generating monthly reports, HSE and QA & QC reports
* Monitoring the compliance with defined parameters as per HSE and quality standards at national & international levels
* Ensuring the compliance of all activities with safety norms and project execution as per time, budget & quality norms
* Ensuring documentations & verification of billings & invoices as per the company policies
* Formulating budgets and analyzing variances between projected & actual costs and implementing corrective actions to rectify the same
* Designed water and sewerage systems for many cities around the world
Significant Accomplishments:
* Led high net-worth project worth INR Crores/ US$ Million involving an esteemed set of clientele including PDO, National Water and Sewage Corporation, DEWA, Putrajaya, Metro Water, Chennai, Delhi Jal Board, Ashghal and others
* Initiated the timely execution of Putrajaya Water Supply Project, Cooperative Sugar Factories Wastewater Treatment Plants, Kuala Lumpur Water Supply and Kelanajaya Sewerage Systems, Jinja Water Treatment Plant projects within budget; implemented cost control strategies such as proper planning and in time procurement of material and equipment as well as effective estimates for site infrastructure.
* Managed the construction & widening for KM pipe laying and 3 no reservoirs, waste water treatment plants projects worth INR Crores / US$ Million in Kuala Lumpur / Visakhapatnam / Kampala /Dubai/ Muscat city for Putrajaya/ State Government Authorities/ National Water and Sewage Corporation/ PDO Authority
Jun'- Dec Tebodin LLC, Muscat as
Key Result Areas:
* Designed water treatment plants, desalination plants and sewage treatment plants
* Prepared estimation of quantities for all EPC contract works
* Managed supply of equipment as per tender and specifications, drawings & others by coordinating with technology partners
Team Size: 55 no
Key Result Areas:
* Generated detailed project report of mld sewage treatment plant including sewage Pumping Stations for Bathinda town under JNNURM mission
* Conducted site visits to project locations to collect data on topographical survey, soil survey, rates of construction material, plant and machinery and water pipelines
* Prepared estimation of Machilipatnam, Madurai, Mandapeta Storm Water Drain sizes/ sections/ culverts with respect to rainfall data and drawings to finalize rate analysis
Projects:
* Madras Master Plan for Water Supply and Sewerage System- on World Bank Aided Project for Metro water.
* m3 / day STP at Ankaleshwar. Design, preparation of specifications, bid evaluation & review of STP Vendor Drawings
* New Pumping Station and Treatment Plant of Baga -Sinquerim Coastal Belt in Goa
* Tillari Regional Water Supply Scheme
*.5 mgd Nanglai Water Treatment Plant in New Delhi.
* Evaluation of Rapid gravity sand filters of Red hills water treatment plant
Team Size:
Key Result Areas:
* Implemented Environmental Management Systems and submitted Environmental protection reports
* Worked in coordination with National Water and Sewerage Corporation in Kampala for submission of management plans to execute construction of highways, roads, bridges & others
* Managed testing & commissioning of submersible pumps of Jinja Intake structure for expansion of water treatment plant.
* Led construction of Stilling Well, Flocculation Chamber, Sedimentation Tank of cum per day capacity and Water Treatment Plant
Key Result Areas:
* Designed water treatment plants, desalination plants and sewage treatment plants
* Prepared estimation of quantities for all EPC contract works
* Managed supply of equipment as per tender and specifications, drawings & others by coordinating with technology partners
Key Result Areas:
* Reviewed Dubai International city sewage pumping station and Sewage Treatment Plant.
* Prepared specifications of cum/day capacity MBR Sewage Treatment Plant with estimated cost of US$ millions
* Managed Dubai Metro Rail Project to locate chilled water pipe line routing in the utility services corridor
cum/ day oil and grease traps, clarifiers, aeration tanks and associated inspection chambers and laying of pipe lines of waste water treatment plants.
Highlights:
* Generated Environmental Audit Reports
Project: Construction of Military Training School and Buildings at IAT Girinagar, Pune for Military Engineering Services
Project: Construction of Runway at Airport Lohagoan in Pune for Military Engineering Devices
Team Size:
Key Result Areas:
* Implemented Environmental Management Systems and submitted Environmental protection reports
* Worked in coordination with National Water and Sewerage Corporation in Kampala for submission of management plans to execute construction of highways, roads, bridges & others
* Managed testing & commissioning of submersible pumps of Jinja Intake structure for expansion of water treatment plant.
* Led construction of Stilling Well, Flocculation Chamber, Sedimentation Tank of cum per day capacity and Water Treatment Plant
Key Result Areas:
* Designed water treatment plants, desalination plants and sewage treatment plants
* Prepared estimation of quantities for all EPC contract works
* Managed supply of equipment as per tender and specifications, drawings & others by coordinating with technology partners
Team Size:
Key Result Areas:
* Generated detailed project report of mld sewage treatment plant including sewage Pumping Stations for Bathinda town under JNNURM mission
* Conducted site visits to project locations to collect data on topographical survey, soil survey, rates of construction material, plant and machinery and water pipelines
* Prepared estimation of Machilipatnam, Madurai, Mandapeta Storm Water Drain sizes/ sections/ culverts with respect to rainfall data and drawings to finalize rate analysis
Key Result Areas:
* Reviewed Dubai International city sewage pumping station and Sewage Treatment Plant.
* Prepared specifications of cum/day capacity MBR Sewage Treatment Plant with estimated cost of US$ millions
* Managed Dubai Metro Rail Project to locate chilled water pipe line routing in the utility services corridor
cum/ day oil and grease traps, clarifiers, aeration tanks and associated inspection chambers and laying of pipe lines of waste water treatment plants.
Highlights:
* Generated Environmental Audit Reports
Projects:
* Madras Master Plan for Water Supply and Sewerage System- on World Bank Aided Project for Metro water.
* m3 / day STP at Ankaleshwar. Design, preparation of specifications, bid evaluation & review of STP Vendor Drawings
* New Pumping Station and Treatment Plant of Baga -Sinquerim Coastal Belt in Goa
* Tillari Regional Water Supply Scheme
*.5 mgd Nanglai Water Treatment Plant in New Delhi.
* Evaluation of Rapid gravity sand filters of Red hills water treatment plant
Project: Construction of Military Training School and Buildings at IAT Girinagar, Pune for Military Engineering Services
Project: Construction of Runway at Airport Lohagoan in Pune for Military Engineering Devices
Team Size:
Key Result Areas:
* Implemented Environmental Management Systems and submitted Environmental protection reports
* Worked in coordination with National Water and Sewerage Corporation in Kampala for submission of management plans to execute construction of highways, roads, bridges & others
* Managed testing & commissioning of submersible pumps of Jinja Intake structure for expansion of water treatment plant.
* Led construction of Stilling Well, Flocculation Chamber, Sedimentation Tank of cum per day capacity and Water Treatment Plant
Team Size:
Key Result Areas:
* Generated detailed project report of mld sewage treatment plant including sewage Pumping Stations for Bathinda town under JNNURM mission
* Conducted site visits to project locations to collect data on topographical survey, soil survey, rates of construction material, plant and machinery and water pipelines
* Prepared estimation of Machilipatnam, Madurai, Mandapeta Storm Water Drain sizes/ sections/ culverts with respect to rainfall data and drawings to finalize rate analysis
Key Result Areas:
* Reviewed Dubai International city sewage pumping station and Sewage Treatment Plant.
* Prepared specifications of cum/day capacity MBR Sewage Treatment Plant with estimated cost of US$ millions
* Managed Dubai Metro Rail Project to locate chilled water pipe line routing in the utility services corridor
cum/ day oil and grease traps, clarifiers, aeration tanks and associated inspection chambers and laying of pipe lines of waste water treatment plants.
Highlights:
* Generated Environmental Audit Reports
Projects:
* Madras Master Plan for Water Supply and Sewerage System- on World Bank Aided Project for Metro water.
* m3 / day STP at Ankaleshwar. Design, preparation of specifications, bid evaluation & review of STP Vendor Drawings
* New Pumping Station and Treatment Plant of Baga -Sinquerim Coastal Belt in Goa
* Tillari Regional Water Supply Scheme
*.5 mgd Nanglai Water Treatment Plant in New Delhi.
* Evaluation of Rapid gravity sand filters of Red hills water treatment plant
Project: Construction of Military Training School and Buildings at IAT Girinagar, Pune for Military Engineering Services
Project: Construction of Runway at Airport Lohagoan in Pune for Military Engineering Devices
from
from
from
Gulbarga University / Environmental Engineering