Work Experience

Total years of experience :32 years, 0 Months

Civil Construction Supervisor at GL NOBLE DENTON WLL
  • Qatar
  • My current job since August 2018
Third Party Inspection Engineer at GL NOBLE DENTON WLL
  • August 2017 to August 2018

Project #1 : EPIC for Hamad International Airport Jet A-1 Supply Project (JSPP) and EPIC for Expansion Pilot CNG Refueling Station - QP Project

Deputy General Manager at Larsen & Toubro
  • United Arab Emirates
  • November 2015 to May 2017

Kuwait

Project : Kuwait Oil Company (KOC) - New Gathering Station (GC-30) project

Third Party Inspection Engineer at Velosi Certification L.L.C - Qatar
  • December 2012 to October 2015

To verify the Implementation of project quality procedure and maintain the procedures at site.
•Ensuring the departmental procedures is being implementation and they meet the requirements.
•During construction, surveillance of contractor’s final stabilization of the project
•Ensure site personnel follow the Quality Assurance system and assist in training of site personnel in the QA/QC system
•Controlling of all QC personnel’s and conducting meeting with client and construction management personnel’s to resolve QC related issues.
•Preventing and monitoring of NCR’s, client Log Book Entry (LBE) and quality surveillance reports (QSR proactive report) etc

QC Inspector
  • November 2007 to September 2012

Witness and inspection of Work activities at site and ensuring the material is being used, as per approved material submittal, Procedures and as per AFC drawing.
•Ensuring the departmental procedures is being implementation and they meet the requirements.
•Perform inspection for all civil related activities as per the approved inspection & test plan.
•Witnessing of survey work of civil activities, all laboratory sample testing & review all test reports as per the relevant codes & project specifications.
•Checking of on-going activities that work being executed according with standard, work procedures & specification.
•Verify all corrective action on noted nonconformities for closeout.
•Review procedures & Method statement for all civil activities.
•During construction, surveillance of contractor’s final stabilization of the project.
•Review all the Quality documents prepared by contractor for final dossier.
•Initiate record or provide solutions for quality problems.
•Initiate action to prevent the occurrence of any non-conformance.
•Review corrective actions recommended in non-conformance reports, initiate and verify corrective actions to prevent reoccurrence of non-conformity.
•Ensure site personnel follow the Quality Assurance system and assist in training of site personnel in the QA/QC system.
•Comply with all safety instructions and standing instructions.

Civil Engineer at Dar Al Akeeli Es
  • October 2006 to October 2007

General QA/QC Responsibilities

•Prior to construction thoroughly familiar with the terms and conditions of the state issued site permit, natural resources protection permit or both,
•Preparation of Method statement and ITP for Construction Activities for Different Stage of activities as per ISO 9001:2000 QMS Essential Procedure
•Prior to construction thoroughly familiar with the proposed construction schedule including the timing for installing and removing erosion controls, the timing for constructing and stabilizing any basins or ponds, and the deadlines for completing stabilization of disturbed soils
•Ensuring that all Exception Items (Punch List) items related to Civil are completed (Test Package) as per client requirements.
•Ensuring that Civil measuring Equipment are appropriate stored and handled
•During construction, the inspector will prepare and submit weekly (or other frequency ) inspection reports
•Preparation of Method statement and ITP for Construction Activities for Different Stage of activities as per ISO 9001:2000 QMS Essential Procedure
•Co-ordination with a team of Sr. QA/QC engineers of different discipline to ensure proper work being followed.
•Reviewing test reports, Documentation and filing of paper works as per client requirements.
•Preparation of Inspection Disposition Reports.
•Coordination with client Inspection Representative

Civil QC Inspector at Dar Al Akeeli Es
  • August 2005 to January 2006

Saudi Aramco Oil Company (Refinery Inspection Unit) -Jeddah Refinery

Project In charge at Dar Al Akeeli Es
  • November 2002 to July 2004

Maintenance of Sanitation Services Contract - Saudi Aramco Yanbu Refinery

Civil QC Inspector at Dar Al Akeeli Es
  • November 2000 to March 2002

Saudi Aramco Oil Company (Refinery Inspection Unit) -Jeddah Refinery

Multi Craft Supervisor at Dar Al Akeeli Es
  • November 1999 to October 2000

Saudi Aramco North Jeddah Bulk Plant

Civil Engineer at Sri Venkateshwara Engineering Company
  • India
  • November 1996 to October 1999
at Vetnary College and Resource Center
  • June 1989 to May 1996
Deputy General Manager at K.S.A
  • to

Saudi Arabian Oil Company (Aramco) and the DOW Chemical Company (Dow) joint venture (SADARA) Polyethylene package, LSPB-1 - Jubail Industrial area- 2

Education

Bachelor's degree, Civil Engineering
  • at BE civil
  • December 2018
Bachelor's degree, Civil Engineering
  • December 2018

Bachelor's degree, Construction Management
  • January 2008

Accredited by Saudi council of Engineers Association •ISO

High school or equivalent, Construction Management
  • January 2008

Accredited by Saudi council of Engineers Association •ISO

Specialties & Skills

Instructions
Inspection
Testing
Action Planning
CUSTOMER RELATIONS
GRAPHIC DESIGN
ISO 9000
MICROSOFT WORKS
OIL PAINTING
PERSONNEL
QUALITY
QUALITY CONTROL
SPECIFICATION

Languages

Arabic
Expert
English
Expert
Hindi
Expert