vic salvador castillo, Project Mechanical Engineer

vic salvador castillo

Project Mechanical Engineer

AL QUSSIE INTERNATIONAL

Lieu
Arabie Saoudite - Jeddah
Éducation
Baccalauréat, MECHANICAL ENGINEERING
Expérience
27 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :27 years, 5 Mois

Project Mechanical Engineer à AL QUSSIE INTERNATIONAL
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis janvier 2008

Manage the Operation & Maintenance of the 18th floor Jeddah Municipality building.
Oversee logistic requirements of each facilities.
Testing & commissioning of new equipments
Modifications & Revision as required by the Building Management o its HVAC system.Operate & Maintained
Chillers, Chilled water pumps, FCU, Air handling units, Fire, Potable & Non Potable Water, Sewage disposal systems & Waste water treatment.
Load testing of standby 2-1000 KW CAT Generators

Facility Mechanical Engineer à SAUDI OGER LTD./AL QUSSIE INTERNATIONAL
  • Arabie Saoudite - Abha
  • juin 1996 à juin 2007

Manage the operation & maintenance of the Power & Water facilities equipment at the ABHA REGIONAL AIRPORT..
In charge in the Inspection, testing & Commissioning of newly installed/modified equipment's.Planned PM & CM of the Standby Diesel generators in accordance with the Manufacturers specs.Raised Material Requirements to ensure equipments operation without delay.
Monitor /record & review equipment details regularly.
Reported to my Project Manager.

Éducation

Baccalauréat, MECHANICAL ENGINEERING
  • à West Negros College
  • mars 1981

West Negros College B.S. MECHANICAL ENGINEERING

Baccalauréat, Mechanical Engineering
  • à West Negros University-Philippines
  • mars 1981

FOREMAN-POWER PLANT FACILITIES (1993-1996) *.In charge in the Operation & Maintenance of the Power plant facilities. Handling 4 load centers of the Power plant facilities. Report directly to the British Superintendent. *Make daily, monthly, annual status report on Generators, material procurements & inventories as per PCA (Presidential Civil Aviation) standards & requirements. Plant Generating Capacity (Load Center 1, 2, 3, 4) 1. SULZER Diesel Engines 11 units Capacity: 2500 KW, 4160 Volts, 60 HZ, 1200 Rpm Method of Starting: Compressed air @ 30 bars Air tanks 2. Enterprise Diesel engine - 2 units

Baccalauréat, B.S IN MECHANICAL ENGINEERING
  • à West Negros College of Engineering
  • mars 1981
Baccalauréat, B S in Mechanical Engineering
  • à WEST NEGROS COLLEGE OF ENGINEERING
  • mars 1981

NONE.. I WORKED AFTER MY GRADUATION IN THE POWER PLANT

Baccalauréat, B. S. in Mechanical Engineering
  • à West Negros College of Engineering
  • mars 1981

Specialties & Skills

Mechanical Testing
AVIATION
BOILERS
CATERPILLAR
COMPRESSORS
CONVEYORS
DIESEL ENGINES
DIESEL GENERATORS

Langues

Anglais
Expert