Key Responsibilities: : Construction Site management, Administrative Control on customer issues, Project cost control, Planning, Scheduling, Diplomacy, Ability to motivate people, P&ID’s, Change management, Contractor management, Cost control, MIS, MS Project

o Build, develop and manage the Team
o Plan resources needs in line with Budget
o Implements, validates and manages the OM processes
o Initiates process continuous improvement
o Involve into customer satisfaction and customer Complaint improvement programmers
o Adhere to operating cost, budget planning and adherence lean sigma savings
o Provide support to the Head of Project in assigned projects -Appliance of Lean Sigma knowledge for improvement projects
o Identify, evaluate, audit (Vendor qualification) and select the suitable service providers
o Present to the management all project details including costing and MIS every month
o Create and maintain comprehensive project documentation and Perform risk management to minimize project risks
o Promote best practice and Continuous improvement
o Make sure the efficient and effective delivery of Project.

On-Site Manager في AVL India Private Limited
  • الهند - دلهي
  • سبتمبر 2013 إلى أكتوبر 2014

Key Responsibilities: : Construction Site management, Administrative Control on customer issues, Project cost control, Planning, Scheduling, Diplomacy, Ability to motivate people, P&ID’s, Change management, Contractor management, Cost control, MIS, MS Project

• Play pivotal role in establishing new and large collaborations and Implement Project Management Processes and Systems as per the business need.
• Improve performance by designing and monitoring KPIs for various departments/teams, ie: procurement, import, Infrastructure, QA, QC, project team, etc.
• Monitor the progress of the projects and pro-actively visualize possible road blocks and have back up action plan, co-cordination with all the stakeholders to move the projects smoothly and ensure that the resources assigned to projects are adequate to meet program objectives.
• Manage changes to the project scope, project schedule, and project costs using appropriate verification techniques.
• Responsible for revenue analysis, resource utilization, projections, client specific requirements.
• Manages all project and client communications including team meetings, client meetings, budget reports and progress reports and measure project performance using appropriate tools and techniques.
• Create and maintain comprehensive project documentation and Perform risk management to minimize project risks.
• To identify, evaluate, audit (Vendor qualification) and select the suitable service providers like
• To prepare quotes for the projects with all stake holders and ensuring close control on the project cost execution, explore various options to execute the projects at optimal costs with desired quality standards.
• Present to the management all project details including costing and MIS every month

Mechanical Engineer في GE Global Research
  • الهند - بنغالورو
  • أكتوبر 2010 إلى سبتمبر 2013

Customer coordination, Internal Project costing, Project Planning and Scheduling, Project Management, Change management, Contractor management, Cost control, MIS, MS Project, Utility Operation and Maintenance, Maintenance of stationary and rotary equipment, Utility troubleshooting Annual maintenance budget, Annual Utility budget, Change management, Preventive maintenance, Predictive maintenance, shutdown maintenance, Vibration analysis, Energy conservation, TPM, 5S, Maintenance Planning and Scheduling, task prioritization, resource identification, Contractor management, Contractor KPI, Set Annual goals and targets, Maintenance Optimization, Operation Optimization, Maintenance and Utility MIS, ISO Audit, Maintenance audit, Inventory control, Root cause analysis, Why-Why analysis, Customer relationship,

Utility Engineer في Rajashree Polyfil Limited
  • الهند - فادودارا
  • أغسطس 2007 إلى أكتوبر 2010

Customer coordination, Internal Project costing, Project Planning and Scheduling, Project Management, Change management, Contractor management, Cost control, MIS, MS Project, Utility Operation and Maintenance, Maintenance of stationary and rotary equipment, Utility troubleshooting Annual maintenance budget, Annual Utility budget, Change management, Preventive maintenance, Predictive maintenance, shutdown maintenance, Vibration analysis, Energy conservation, TPM, 5S, Maintenance Planning and Scheduling, task prioritization, resource identification, Contractor management, Contractor KPI, Set Annual goals and targets, Maintenance Optimization, Operation Optimization, Maintenance and Utility MIS, ISO Audit, Maintenance audit, Inventory control, Root cause analysis, Why-Why analysis, Customer relationship,

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Rajasthan University
  • يوليو 2007

Mechanical Engineering, Machine Design, Internal Combustion Engine, Gas Turbine, Compressor, Power Plant Engineering, Fluid mechanics, Fluid machines, Thermodynamic, Operation Management, Financial management, Engineering Mathematic, Optimize technics, Material science, Strength of material, Manufacturing technology, Production technology, Industrial engineering, Time management, Theory of machines, Dynamic, Basic Electrical Engineering, Basic Civil Engineering, Basic Computer science, Basic Electronic, Basic Instrumentation

Specialties & Skills

MS Project
Project Management
Mechanical Maintenance
Mechanical Design
Energy Conservation
Heat Transfer
Engineering
Materials Science
Mechanical Engineering
Industrial Properties
Six Sigma
Energy Efficiency
Energy Recovery
Energy Studies
Steam Boilers
Biomass Boilers
Air Compressors
Chillers
Waste Water Treatment Plants
Safety Engineering
Cooling Towers
MS Project
Centrifugal Compressors
Utility Systems
Facility Management
Project Site Management
Project Management
Process Plant Maintenance
MS Project
Reactor

اللغات

الهندية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

Operation Management (الشهادة)
تاريخ الدورة:
January 2016
صالحة لغاية:
January 9999
Effective problem solving and decision making (الشهادة)
تاريخ الدورة:
January 2016
صالحة لغاية:
January 9999
Health and safety at construction site (الشهادة)
تاريخ الدورة:
January 2016
صالحة لغاية:
January 9999
Project Management (الشهادة)
تاريخ الدورة:
January 2016
صالحة لغاية:
January 9999
Technical Trailing (تدريب)
معهد التدريب:
Kota Super Thermal Power Plant
تاريخ الدورة:
May 2005
المدة:
300 ساعة
Technical Trailing (تدريب)