Planning /Scheduling Engineer
Protecon BTG Pvt. Ltd.
Total years of experience :12 years, 7 Months
Project Management Basics - Theoretical understanding of Project Management Processes & Knowledge Areas. This module also included the specialized subjects like Project Planning, Scheduling, Monitoring, Progress Measurement & Earned Value Management System, Budgeting, Cost Estimation, Invoicing, Change Management, Risk Management / Analysis, Engineering Management, Procurement Management & Construction Management;
Industry Overview - Under this module, I was given detailed understanding of various industrial projects, viz. Oil & Gas (Upstream and Downstream), Petrochemicals, Fertilizers and Pipeline Construction Management.
Inter-Disciplinary Relationship - This module consisted of highly experienced engineering experts explaining the various deliverable prepared by respective disciplines & inputs required in order to sequence the deliverable for effective planning.
Software tools-In this module, I was given an opportunity to have hands-on experience and expertise on internationally recognized Project Management software tools viz. Primavera P6-R8.4, MS Project, MS Office and advanced applications of MS Excel.
I have acquired fairly good knowledge on key areas of Project Management, e.g. Budgeting, Planning, Scheduling, Monitoring, Reporting, Cost Control, Procurement & Contract Management and Invoice Certification processes for portfolio of Projects, right from Project Initiation to Commissioning / Hand-over.
Assignments during the Project Management & Controls Training
Prepared Company Organization Charts
Prepared Project Organization Charts
Prepared multiple Work Breakdown Structure (WBS)
Prepared Management Level Schedules
Prepared standard template for Risk Register
Prepared standard template for 90 days look ahead Schedule.
Prepared Overall Project Schedule for a Process Plant in MS Project
Prepared Overall Project Schedule for a Pipeline Project in P6, R8.4
Prepared standard templates for Weekly / Monthly Progress Reports
Developed Monthly Progress Review Presentation
Developed Progress Measurement System for an EPIC Contract
Developed Invoicing (Billing) System for an EPIC Contract
Prepared Manpower Deployment Charts & Histograms (Schedule v/s Actual)
Prepared Progress S Curves (Early Schedule v/s Late Schedule v/s Actual)
Prepared Cash Flow (In / Out) curves for an EPIC contract
I have also undergone a detailed training on Procurement & Contract Management covering following topics:
Planning of Procurement for Goods & Services
Conducting Procurement covering preparation of EOI / NIT, Enquiry Document, Examination & Evaluation of Offers/Bids, Drafting of Purchase Order, Controlling & Expediting, Closing Procurement processes
Developing Pre-qualification Criteria for participation.
Tendering Process
Commercial Terms & Conditions of Contract.
General Conditions and Special Conditions of Contract.
Guarantee & Liability, Risk Coverage, Change in Contract Element
Statutory Conditions of Contracts
Dispute Resolution/Arbitration
Closing of Contract
With my above knowledge acquired during training, I would like to work in an organization which would enable me as a fresh graduate to grow while fulfilling organizational goals with full honesty and sincerity.
Execute Supervising work on site Installation of Power Transformer and electrical equipment for 500MWE Power Plant in 230kv Switchyard, preparation of their Checklist & also preparation of related technical document at BHAVINI site.
As a part of the Project delivery team, was responsible for site supervision & preparation of numerous documents and reports. The documents were prepared based on the standards and guidelines.
Prepare periodic reports for management, including status of schedules, up-coming activities.
Preparation of Flow Charts for various systems/equipment of electrical system with the help of Flow sheets, as build drawings and other relevant documents and drawings.
Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards
Involved in Post procurement of field instrument Item.
Monitoring & Direct delivery times to ensure they are on time.
Ensuring the adequate supply of all required materials, components and equipment.
Attending regular meetings (on work progress, coordination, design, etc.) with Consultant and client to discuss key issues related to the project and take effective corrective actions.
Ensuring safety precautions mention as per norms.
Title of the Project- Manufacturing of Fuelling Machine Head for 700 MWE PHWR.
To get a line about the several techniques involved in the manufacturing of Fuelling Machine Head for a 700 Mwe PHWR reactor and to make a brief report for the same.
Contributed Write ups on Snout Assembly and Alignment of FMH to the end fitting.
Completed BE in Electrical Engineering from G.E.C. Bilaspur (2010)
Completed +2 Science from Sarasawati Hr. Sec. School, Korba (2005)