فينود KUDAKE, Product Development & Production Manager

فينود KUDAKE

Product Development & Production Manager

Guangzhou fanshun Elan Plastech Company Limited.

البلد
الصين
التعليم
دبلوم,
الخبرات
26 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 5 أشهر

Product Development & Production Manager في Guangzhou fanshun Elan Plastech Company Limited.
  • الصين
  • أشغل هذه الوظيفة منذ يوليو 2011

Ensure optimum most efficient use of men, machine & available resources to produce goods that meets the company’s production requirements.
Attending breakdown maintenance properly & execution of preventive maintenance as schedule.
Motivate all employees working under me.
Holds the distinction of manufacturing Welding Fix & Gauges of whole system.
Increase in productivity.
Initiatives to streamline / enhance production processes.

Joined as Manager Development (Prototype); promoted as H.O.D. - Prototype Shop in Jan’09 في S.M. Auto Engineering Pvt. Ltd.
  • الهند - بيمبري
  • فبراير 2007 إلى يوليو 2011

 Spearheaded the development of various automobile components such as Fuel Tank, Hand Brake, Exhaust System and Catcon for Two & Four Wheeler.
 Successfully managed complete manufacturing process including prototype development of all systems, fitment trial and testing of system.
 Holds the distinction of manufacturing Welding Fix & Gauges of whole system.
 Increase in productivity.
 Initiatives to streamline / enhance production processes.
 % reduction in breakdowns / downtime through effective maintenance.
 % escalation in OEE through effective maintenance.
 Quality certifications obtained during your association.
 Reduction in rejection rate? Any reduction in incidence of defects.

Section Head - Assembly Shop & Development Dept. في Fouress Engineering (India) Ltd
  • الهند
  • يناير 2004 إلى فبراير 2007

 Steered the production of Steel Plant Valves varies from 10 Kg. to 30 tones.
 Successfully designed Jigs and Fixtures; developed components for assembly of valves.
 Increase in productivity.
 Initiatives to streamline / enhance production processes.
 % reduction in breakdowns / downtime through effective maintenance.
 % escalation in OEE through effective maintenance.
 Quality certifications obtained during your association.
 Reduction in rejection rate? Any reduction in incidence of defects.

Plant In-charge في Omkar Enterprises
  • الهند
  • يوليو 2003 إلى يناير 2004

 Increase in productivity.
 Initiatives to streamline / enhance production processes.
 % reduction in breakdowns / downtime through effective maintenance.
 Quality certifications obtained during your association.
 Reduction in rejection rate? Any reduction in incidence of defects.

Manager - Development في Automation & Control Techniques,
  • الهند
  • أبريل 1999 إلى يوليو 2003

 Handled complete manufacturing of special purpose machines such as Broaching Machine, Injection Moulding Machine, Gravity Feeding Attachment for Centerless Grinding Machine, Bending Machine and Extruder Steps for Sterlite Company.
 Designed concept to customer as per his requirement of machines.
 Increase in productivity.
 Initiatives to streamline / enhance production processes.
 Quality certifications obtained during your association.
 Reduction in rejection rate? Any reduction in incidence of defects.

TRAINEE ENGINEER في A.C. INDUSTRIES
  • الهند
  • ديسمبر 1997 إلى أبريل 1999

 Initiatives to streamline / enhance production processes.
 Quality certifications obtained during your association.
 Reduction in rejection rate? Any reduction in incidence of defects.

الخلفية التعليمية

دبلوم,
  • في Government Polytechnic Aurangabad
  • يونيو 1997

Specialties & Skills

Government
Manufacturing
Escalation
Production
Testing
Auto Cad
Auto Cad

اللغات

المراتي
متمرّس
الهندية
متمرّس
الانجليزية
متمرّس