To look out the Operation and maintenance activity for the thermal power plant of capacity 100 MW.
The plant equipped with CFBC, AFBC, and PF boiler.
To look out the stable and efficient operation of the boiler and turbine.
Plan for the Preventive maintenance activity and annual inspection work of the boiler & Maintenance work for Turbine.
Plan for the maintenance of the pollution control equipment like ESP and bag filter.
To work out the spares availability for maintenance within the annual budget for the equipment maintenance with maximum availability.
To find the root cause analysis for break down reasons of different equipment of CPP.
To do the modification in present system for better availability and to raise the efficiency of system under the guide line of seniors.
To maintain the operation and maintenance record.
Past Organization : Nandan Exim Ltd
Designation : Engineer
Duration : August 2007 to May 2010
Job Exposure: I have gone through the one whole project cycle of Green field power plant of 1X25 MW capacity from conceptual to commissioning stage particulars of project as listed below.
1X25 MW THERMAL POWER PLANT : -
Boiler: 2X70 TPH, 90 ATA, 515+/-10 °C AFBC type Boiler CVL make.
Turbine: Single extraction cum condensing type 25 MW Nanjing make turbine.
Cooling Tower: Induced draft type 5400 M3 Capacity.
Fuel Handling System: 100 TPH Capacities
Water Treatment Plant: 150 M3/Hr capacities RO unit and 50 M3/Hr DM Plant.
Ash Handling System: 12 TPH Pneumatic type ash handling system.
Electro Static Precipitator: 2X1, 18, 332 M3/Hr capacity with dust load at ESP exit is 75Mg/Nm3
Bag filter for process Boiler: -
Erection and commission of 1*30000m3/hour Capacity Bag filter for their 1*20TPH capacity CVL make AFBC Boiler.