Total Years of Experience: 12 Years, 1 Months
December 2014
To Present
Sr. Quality Assurance Engineer
at Prijai Heat Exchangers Pvt. Ltd. Airoli.
Location :
India - Navi Mumbai
• Preparation & keeping of reports in line with ISO 9001:2015.
• Understanding the process of supplier and supplier audits.
• Implementation and follow up of CAPA report.
• Responsible for all type of internal testing of material and also for external lab testing of materials as per reliability plan.
• Tracking of calibration of measuring instruments and gauges.
• Handling customer audit.
• Understanding the process of supplier and supplier audits.
• Implementation and follow up of CAPA report.
• Responsible for all type of internal testing of material and also for external lab testing of materials as per reliability plan.
• Tracking of calibration of measuring instruments and gauges.
• Handling customer audit.
June 2012
To February 2014
Quality Assurance Engineer
at Suneson Engineering & Fabrication Pvt. Ltd
Location :
India - Navi Mumbai
MIDC, Navi Mumbai.
Responsibility:
• In-process and in coming inspection of material.
• Part of new development of product (R & D).
• To Co-ordinate with supplier for Corrective and Preventive Action report(CAPA).
• Ensure calibration has been done of Measuring Instrument.
Achievement:
• Development of 3.new trolleys for electric panel (draw out panels).
1) Lever trolley.
2) Rack in trolley.
3) Screw trolley.
Responsibility:
• In-process and in coming inspection of material.
• Part of new development of product (R & D).
• To Co-ordinate with supplier for Corrective and Preventive Action report(CAPA).
• Ensure calibration has been done of Measuring Instrument.
Achievement:
• Development of 3.new trolleys for electric panel (draw out panels).
1) Lever trolley.
2) Rack in trolley.
3) Screw trolley.
September 2011
To June 2012
Quality Assurance Engineer
at Shree Om Press N Metal Parts
Location :
India - Navi Mumbai
Responsibility:
• To inspect and prepare Incoming inspection report for all bought out parts and sheet metal.
• To Prepare In process Inspection Report.
• To prepare MIS of all products.
• To prepare final inspection report.
• To inspect and prepare Incoming inspection report for all bought out parts and sheet metal.
• To Prepare In process Inspection Report.
• To prepare MIS of all products.
• To prepare final inspection report.
Share on Facebook
Share on Twitter
Share Via Email