مجموع سنوات الخبرة :15 years, 1 أشهر

Senior Drilling Engineer
  • يناير 2016 إلى يناير 2021

Front-End Engineering: (1) Drilling representative on Cypre New Field Development including platform interface with Jack Up rig, slot design, alignment and establish other well construction boundary conditions. (2) Performed feasibility analysis for the In-Field Drilling Program to mitigate production short fall. (3) Provided drilling support for concept development and performance benchmarking prior to making financial commitment to BP Joint Venture (JV) operation.
•Major Project: Planned and executed the Angelin New Field Development (five (5) new drill wells) delivering five (5) first quartile (Q1) performance, four (4) of which were Best in Class (BiC).
•In Field Development: Planned and executed the Serrette Phase II drilling campaign (three (3) new drill wells) delivering two (2) Q1 drilling performance.
•Business Drivers: Provided engineering support for the commercial evaluation of contracts for multi-services bid round specifically for cementing service.

Senior Drilling Engineer في BP
  • أذربيجان - Baku
  • أغسطس 2009 إلى أغسطس 2016

Sperry Drilling Services (SDS):
•Successfully planned and delivered Trinidad’s first multi-lateral oil well for Trinmar (Trinidad west coast); six-fold increase in production was achieved.
•Well Planner for various directional projects on land and offshore using various software such as: Compass, Well Plan and Planit.
•Worked as MWD Engineer - Gulf of Mexico (Deepwater) and Trinidad.
•Worked as a Pore Pressure /Data Engineer - Deep Water Brazil.
Account Representative/Senior Technical Professional - Cementing:
•Worked as a Cementing Engineer for Trinmar and cemented over 25 wells in one year.
•Part of Halliburton Business Development Group whose purpose was to create new business opportunities based and provide technical support to clients.

Senior Drilling Engineer
  • يناير 2009 إلى يناير 2016

Operation support: Created the Extended Reach Drilling (ERD) Guide for the Azeri Chirag Gunashli (ACG) oil development based on offset wells which, enabled access to resources on the periphery of the field.
•Field Development and Business Forecasting: Created a zoned map for all fields in ACG as function of the wellbore stability observed in the offset wells relative to platform/target location; this became the benchmark for monetizing a fixed duration Production Sharing Agreement.
•Technical standard: Established the Standard Operating Practice (SOP) for directional drilling, anti-collision & risk management in ACG five, forty-eight slots, platforms; this risk-based approach limited the shutdown of adjacent high-producing oil wells.
•ACG Operation: Lead engineer on Central Azeri Team in a Multi-disciplinary Team that delivered seven wells including the second longest ERD well in Azerbaijan at 6000m (19, 600ft) step out.
•Shah Deniz Operation: Senior Drilling Engineer for two subsea HPHT exploration/keeper wells.
•Engineering Innovation: Initiated the Halliburton 18” x 22” Versaflex expandable liner hanger system to address the challenge of significant hydraulic restriction when running the subsequent 16” liner.
•Business Efficiency: Developed a multi-level inventory management strategy for ACG that optimized while remaining responsive to a multi-rig line operation; this resulted in a 28% reduction in stock levels.
•Engineering Innovation: Served as lead for the steerable conductor system development for the AGT Region; this had the potential to provide control to an otherwise blind operation.

Senior Drilling Engineer
  • يناير 2006 إلى يناير 2009

Planned and executed (partially) the plug, abandonment & slot recovery of Flamboyant 02 well with sustained casing pressure in multiple annuli; this restored control on the hydrocarbon inventory.
•Major Project - Operation Support: Planned and executed the Cashima Gas Development six (6) new drill high-rate wells and met BP gas contract commitments.

  • يناير 2006 إلى يناير 2006

الخلفية التعليمية

بكالوريوس, PHYSICS
  • في The University of the West Indies, St. Augustine
  • مايو 2021

courses: Hydraulics & Pneumatics Certificate - Metal Industries Company (MIC)

بكالوريوس, Project Management
  • في Henley University
  • مايو 2021

in lieu of

ماجستير, Project Management
  • في Henley University
  • مايو 2021

in lieu of

Specialties & Skills

Cost Planning
Project Management
BUSINESS DEVELOPMENT
CUSTOMER RELATIONS
ENGINEERING
OIL PAINTING
TECHNICAL SUPPORT
APPROACH
BENCHMARKING
CONCEPT DEVELOPMENT
CONTRACT MANAGEMENT
DRIVERS

اللغات

الانجليزية
اللغة الأم

الهوايات

  • Amateur Astronomy