Establishing Quality Management Systems across various processes to reduce rejection/repair levels
and ensure high quality standards at all the stages of production. Implementing stringent measures to ensure high quality standards at all the stages of production and reduce rejection/repair levels.
Implementation of Quality plans and Procedure.
Ensure that inspection / testing equipment at site are with valid Calibration Certificates. Inspection of incoming materials as per applicable standard code and preparing Reports. Preparing & Submitting DPR (DAILY PROGRESS REPORT), MPR (MONTHLY PROGRESS REPORT)
Coordination & Follow up with vendors for progress report & scheduling. Monitor and maintain control records for welding consumable and welder performance record. Co-ordination with Client inspector for Daily welding activities and for stage inspection. Inspection of pipe fit ups, alignment and visual inspection of all welds during Fabrication and Erection. Carrying out inspection for the weld joint before, during, and after the welding process as per the Quality Control Procedure. Carrying out inspection for the fabrication on structural procedure and after the welding process as per the Quality Control procedures. Undertaking line checking through Isometric drawing. Establishing Quality Management Systems across various processes to reduce rejection/repair levels
and ensure high quality standards at all the stages of production. Implementing stringent measures to ensure high quality standards at all the stages of production and reduce rejection/repair levels.
Implementation of Quality plans and Procedure.
Ensure that inspection / testing equipment at site are with valid Calibration Certificates. Inspection of incoming materials as per applicable standard code and preparing Reports. Preparing & Submitting DPR (DAILY PROGRESS REPORT), MPR (MONTHLY PROGRESS REPORT)
Coordination & Follow up with vendors for progress report & scheduling. Monitor and maintain control records for welding consumable and welder performance record. Co-ordination with Client inspector for Daily welding activities and for stage inspection. Inspection of pipe fit ups, alignment and visual inspection of all welds during Fabrication and Erection. Carrying out inspection for the weld joint before, during, and after the welding process as per the Quality Control Procedure. Carrying out inspection for the fabrication on structural procedure and after the welding process as per the Quality Control procedures. Undertaking line checking through Isometric drawing. Preparation of CCC (Construction Completion Certificate)
Which includes all CRR, annexures, WIR, SIR, PER, SER, DCN, of the particular system.
Preparation of CRR (Circuit Release Report) for
Hydro Test, Fill & Flow, kerosene test as per the HT scheme which includes
As built drawings (using Auto Cad)
WIR (Welding inspection report)
SIR (Support inspection report)
PER (Piping erection report)
SER (support erection report)
DCN (Design change note), FCN (Field Change Note) and getting verified by QA/QC Engineer & FE
(field engineer) of NPCIL (client).
After completion of all documentaries, with the third-party inspector hydro test is executed in the
field. Before the execution of hydro test flushing (cleaning), filling, testing, gauging, is done.
Witnessing the Pneumatic/hydro/ vacuum testing in pipe system.