Mechanical Engineer
Athena SA
مجموع سنوات الخبرة :15 years, 9 أشهر
Quantity surveying - MEP
Project coordination
Value Engineering
Analysis of cost effective ways to provide best service
Liaising with suppliers on the procurement end
Sub-contractor coordination
• Project management
• Project coordination
• Value Engineering
• Direct client interaction on various design issues
• Analysis of cost effective ways to provide best service
• Liaising with suppliers on the procurement end
• Preparation of material submittals
• Maintaining the cost effectiveness of any given project
• Installation of HVAC Equipment’s such as AHU, FCU, CCU, Ecology unit, Exhaust fan, VAV, FD, MFD, All types of duct work
• CHW equipment’s: BTU meters, Flow meters, chilled water piping.
• FF installations: FM 200 fire suppression system, Fire hydrants, FHRC, Automatic fire extinguishers,
Sprinklers, Firefighting piping.
• Plumbing installations: Syphonic Rain water drainage system, Water heaters, Sanitary wares
• Effective site coordination and execution
• Effective inventory management
• Site maintenance
• Handling up to 100 workers in the site
Sales of used vehicles
Effectively generated leads and prospects
Identify the potential target segment for used car sales
Effectively presenting the value proposition of the company to the clients
Liaising with customers on post sales service requirements
Achieved average of 6 cars per month
Witnessing and checking of fit-up, weld inspection
• Inspection of pipe fabrication, loops, installation
• Inspection of bulk items such as valves, fittings, flanges, Orifice, Plates etc,
• Dimensional inspection of structures
• Identification of raw materials like pipes, fittings and plates
• Dimensional check up of pipelines, structural and equipments
• Preparation of final documentation and submission to client
Thesis was done on An experiment was done on Direct Injection Diesel engine test rig. The experiment was planned to find the fuel spray droplet diameter. The experiment was conducted on a test rig which was installed with the Particle Image Velocimetry equipment in collaboration with by TSI UK.