Design Engineer
Petrofac Engineering
Total years of experience :4 years, 9 Months
1. Field Instrumentation.
-Safety Valves.
- Flow elements.
- Flow meters.
2. Software:
- ERM by Aveva
- ERP/IR by Oracle
- Conval sizing
3. Preparation of Piping and Instrumentation interface document.
4. Manual sampling system.
1.Field instruments:
- Safety relief valves.
- Pressure gauges and Differential pressure gauges.
- Flow element - Venturi and orifice type.
2. Preparation of Purchase Requisition and Material
Requisition for field instruments.
3.Reviewing vendor documents from various
supplier’s and sub-contractors followed by
preparation of technical review analysis.
1. Preparation of Instrumentation Deliverables:
- Instrument Index, Instrument Datasheet, Input-
output list (I/O), Cable schedule
- Junction Box schedule, Loop drawings and Logic
drawings.
- Cause and Effect document, Alarm and Trip
Set point list and Signal exchange list.
- Preparation of Utility list, Bill of Material and
Operation Philosophy.
- Preparation PLC (Programmable Logic Control)
architecture
- PLC Programming.