Industrial Automation Engineer
Noida power comapny limited
Total des années d'expérience :12 years, 11 Mois
ALL ELECTRICAL AND INSTRUMENTATION WORK FOR OIL AND GAS PLANT IN CALIBRATION THE INSTRUMENTS AND INSTALLATION N AND WORKING OF SCADA DESIGN AND WORK INSTALLED INSTRUMENTS PROFIBUS, HART CALIBRATOR AND INSTRUMENTS AND ELECTRICAL SUBSTATION AUTOMATION AND SCADA DTMS RTU PLC AND DCS AND DAWNING TO INSTALLATION OF CABLE CONNECTION OF RTU AND FRTU 11 KV 33 KV WORK ETC.
I HAVE COMPLETED MY DIPLOMA IN INSTRUMENTATION AND CONTROL ENGINEER AND WORKING A PHARMCEUTICAL INDUSTRY AND DIFFRENT WORK IN PRESSURE GAUGE, RTD, THERMOCOUPLE, THERMISTER, PITOT, VINURI, ORIFICE PLATE , LIMIT SWITCH, AND DIFFRENT VACCUME GAUGE, DIPHRAM GAUGE, AND DIFFRENT CHROMATEOOGRAPHY , AND DIFFRENT ANALAYZER, CALIBRATION OF INSTRUMENTS AND INSTALLATION OF INSTRUMENTS AND SOME CHECK OF INSTRUMENTS AND SCADA DESIGN, CONFIGURATION AND WORKING OF A DIFFRENT SCADA, AND CABLE LAYING AND TESTING OF INSTRUMENTS AND WORKING OF INSTRUMENTS CONTROL CONTROL VAVE, AND LEVEL INDICATOR, AND LEVEL TRANSMITTER,AND BUTTERFLY VALVE, AND CONTROL ON/OFF VALVE CALIBRATION AND WORK AT SITE LABELING AND CONFIRM OF INSTRUMENTS ARE ACCURATE OF INSTRUMENTS I HAVE ONE AND HALF YEARS WORKING OF INSYRUMENTS AND OTHER WORKING OF INSYRUMENTS INSTALLATION AND CNFIGURATION OF INSTALLATION OF CALIBRATION OF INSTRUMENTS AND SERVICE OF ENGINEERING WORK ETC.
I HAVE COMPLETED MY DIPLOMA INSTRUMENTATION AND CONTROL SYSTEM AND I HAVE WORKING IN ALL TYPES OF INSTRUMENTS IN INSTALLATION AND CABLE LAYING AND CONNECTION OF INSTRUMENTS LIKE RTD , THERMOCUPLE , THERMISTER ,PITOT, VENTURI AND DIFFRENT PRESSURE GAUGE AND PRESSURE VALVE AS A SCADA DESIGN AND TECHNICIAN JOBS AND DIFFRENT WORK IN INSTRUEMTNS HAS BEEN WORKING PROFIBUS AND DCS SYSTEM ETC.