Title : JAYABHERI The Summit (High Rise Residential Project)
PALM SPRINGS ( High rise residential) G + 28 Floor of area 0.8 acre
Projects Accomplished
Title Construction Project of office ICQ (investment capital Qatar), Doha, Qatar
Synopsis * 36th Floor Tornado tower, area of about 400 Sqmts
* Manpower Involvement: 1 supervisor and 15 technicians
Electrical Capability of Project o TPN Isolator, SMDB, 3-phs DBs, UPS for IT rooms.
Title Construction Project of office Conoco Phillips, Doha, Qatar
Synopsis * 15th Floor The Gate tower, area of about 500 Sqmts
* Manpower Involvement: 1 supervisor and 15 technicians
Electrical Capability of Project o TPN Isolator, SMDB, 3-phs DBs, MCC Panel for FCUs, UPS for IT rooms.
Title Construction Project of Fun Ville @ Ezdan mall, Doha, Qatar
Synopsis * 2nd Floor at Ezdan mall, area of about 800 Sqmts
* Manpower Involvement: 1 supervisor and 15 technicians
Electrical Capability of Project o TPN Isolator, SMDB, 3-phs DBs, MCC Panel for FCUs, UPS boards.
Job Role & Responsibilities:
* ELECTRICAL ENGINEERING INCLUDES: Load calculation, Cable sizing, Voltage drop calculation, ELDB scheduling, Transformer &
Generator sizing, Batteries/UPS sizing, Short circuit calculations, Earthing and lightning protection calc, SLD schematic, Etc.
* MECHANICAL ENGINEERING INCLUDES: (HVAC) Calculation for heat load and tonnage requirement, Duct sizing, CHW piping,
Etc. Also hands-on experience in fire fighting and fire alarm layouts.
* Coordinating the complete MEP in FEED detailing as per the client requirement and site engineering works.
* Visiting sites & coordinating with contractors for speed & quality Execution of work and overseeing Shop drawings getting
approvals & As-built drawings for future reference, being presence at the time of testing and commissioning.
Additional Projects Accomplished:
* Site Engineering & overseeing As-Built drawings of Ansar gallery mall @ Al- rayyan.
* FEED & Project coordinator MEP for Nando’s Restaurants, Burger boutique, Future Engineering factory Doha.
* MEP Design for Sun and Sand sports show room in City center, Go-sport show room @ Villageo mall.
AP TRANSCO, AP (GOVERNMENT UNDERTAKING) - 132/33 KV SUB STATION
Project Cost: 2.5 Crores
o Manpower Involvement: 1 site supervisor and 15 technicians
Electrical Capability of Project 11KV/433V Substation, 630 KVA T/F, 2 sets of 320 KVA DG-set, also includes synchronization panel,
main power control circuit panel, 160 KVAR capacitor bank panel, pumps and motors panel,
lighting panel, kitchen panel, AC panel of 274 KW.
,