وائل عاطف عبد الفتاح خضرى خليفة عاطف, Maintenance & mech project manager

وائل عاطف عبد الفتاح خضرى خليفة عاطف

Maintenance & mech project manager

asfour crystal

البلد
مصر - القاهرة
التعليم
بكالوريوس, Mechanical Power Engineering Dpt
الخبرات
20 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 10 أشهر

Maintenance & mech project manager في asfour crystal
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ أكتوبر 2005

CURRICULUM VITAE






Dear Sir/Madam,


Please find attached my updated résumé enclosing details on my educational background and working experience, for your review and consideration. References are furnished upon your request. If you feel that my qualifications are adequate for a suitable position, I would appreciate the opportunity of an interview to discuss my capabilities in more details.



Waiting for your kind reply,


Sincerely,


Wael Atef Abd-El Fattah









Wael Atef Abd-El Fattah
23 ABO BAKRE ELSDEEK ST -ELSHEIKH MANSOUR.
EL-MARG
CAIRO. EGYPT,

Mobile: +201112073880
alternative mobile :+20102210491
Wael.
Eng.

PERSONAL DATA_____________________________________
Date of Birth : January 6, 1980
Place of Birth : Cairo
Nationality : Egyptian
Military service : Final exempted

CAREER OBJECTIVE__________________________________
(Build a Career) Seeking a will-defined opportunity for an expanding career path in a creative job within a good, challenging and rewarding career.

maintainance mechanic manager في Crystal Asfour international
  • مصر - القاهرة
  • أكتوبر 2005 إلى أكتوبر 2013

❑ 1/10/2005- TILL NOW
Crystal Asfour international
Maintainance engineering department


Position: maintainance mechanic

- Maintenance, repairing and development for Mechanical Equipments
o Redesign the manual glass press balls machine from manual mode to half automatic mode
o Install and redesign the glass balls grinding, polishing and resize machine
o Development and redesign the old handling equipment with new and more technology equipment ex. Pneumatic handling and electric mechanical handling machine.
o Applying the Lean Manufacturing principles for the departments to arrive to the ideal production process and apply the value stream mapping.
o Applying the 5s principles maintenance work-shop
o Pumps Centrifugal pumps, pneumatic and electric eccentric Diaphragm, Spiral pumps (cavity) pumps, Gear pumps and piston pumps.
o Filters maintenance dust Air filter, dust Water filters and Press Sludge filters.
o Maintenance for Cullet Scrapers, Cullet Clutch Crush, Rotary Head distributor and linear distributor.
o Furnace installation electric, Gas furnace and Rotary furnace.
o Conveying system Maintenance pneumatic Conveying system, Vertical system (Bucket Elevators) and Horizontal system (Conveying Belts)
o Pneumatic systems maintenance and design

- Project Engineer Install (New Sand Washer Plant) this project Executed by cooperate with ( AKW Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.


- Project Engineer Install (Automatic Batch Plant (pneumatic system)) this project Executed by cooperate with (ZIPPE Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.


- Project Engineer Install (Red Lead Plant)) this project Executed by cooperate with (COPLOSA Corporation) Spain Corporation)
- At the project begining we went to (COPLOSA Corporation) in (Barcelona - Spain) to have trainning in the original red lead plant to know How (Installation, Maintenance and Operation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.

- Assist the work-shop supervisor in the inventory work to maintain the suitable quantities of the spare parts at our store.

مدير صيانة في كريستال عصفور
  • مصر - القاهرة
  • أكتوبر 2005 إلى أكتوبر 2013

- Maintenance, repairing and development for Mechanical Equipments
o Redesign the manual glass press balls machine from manual mode to half automatic mode
o Install and redesign the glass balls grinding, polishing and resize machine
o Development and redesign the old handling equipment with new and more technology equipment ex. Pneumatic handling and electric mechanical handling machine.
o Applying the Lean Manufacturing principles for the departments to arrive to the ideal production process and apply the value stream mapping.
o Applying the 5s principles maintenance work-shop
o Pumps Centrifugal pumps, pneumatic and electric eccentric Diaphragm, Spiral pumps(cavity) pumps, Gear pumps and piston pumps.
o Filters maintenance dust Air filter, dust Water filters and Press Sludge filters.
o Maintenance for Cullet Scrapers, Cullet Clutch Crush, Rotary Head distributor and linear distributor.
o Furnace installation electric, Gas furnace and Rotary furnace.
o Conveying system Maintenance pneumatic Conveying system, Vertical system(Bucket Elevators) and Horizontal system(Conveying Belts)
o Pneumatic systems maintenance and design

- Project Engineer Install (New Sand Washer Plant) this project Executed by cooperate with( AKW Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.


- Project Engineer Install (Automatic Batch Plant(pneumatic system)) this project Executed by cooperate with (ZIPPE Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.


- Project Engineer Install (Red Lead Plant)) this project Executed by cooperate with (COPLOSA Corporation) Spain Corporation)
- At the project begining we went to (COPLOSA Corporation) in (Barcelona - Spain) to have trainning in the original red lead plant to know How (Installation, Maintenance and Operation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.

- Assist the work-shop supervisor in the inventory work to maintain the suitable quantities of the spare parts at our store.

maintainance mechanic في Novo Factory for Metal
  • مصر - القاهرة
  • يوليو 2004 إلى سبتمبر 2005

❑ 1/7/2004- 14/9/2005
Novo Factory for Metal & Electrical industry.
Position: maintainance mechanic


- Maintenance and Repairing all Mechanical Equipments and for all hydraulic, pneumatic sys.

Project Engineer في THE ENGINEERING UTILITIES & CONSTRUCTION OFFICE
  • مصر - القاهرة
  • أغسطس 2004 إلى أغسطس 2005

- Project Engineer Install (New Sand Washer Plant) this project Executed by cooperate with( AKW Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.

PROJECT ENGINEER في The Engineering Utilities & Construction Office
  • أغسطس 2003 إلى يونيو 2004

❑ 15/8/2003-22 /6/2004
The Engineering Utilities & Construction Office (Mechanical and electrical works)

Position: PROJECT ENGINEER

-install Water treatment Station

Maintenance manager في NOVO FACTORY FOR METAL & ELECTRICAL INDUSTRY
  • مصر - القاهرة
  • أغسطس 2003 إلى يونيو 2004

- Maintenance and Repairing all Mechanical Equipments and for all hydraulic, pneumatic sys.

الخلفية التعليمية

بكالوريوس, Mechanical Power Engineering Dpt
  • في Helwan University
  • مايو 2003

Specialties & Skills

Pneumatics
Hydraulics
Equipment Design
sand plant project manager
Maintenance Engineering
ASSEMBLY
ENGINEER
ENGINEERING DEPARTMENT
HORIZONTAL
INVENTORY
LEAN MANUFACTURING
MAINTENANCE
MAPPING
PRODUCTION PROCESS
PROJECT ENGINEER
project manager
deep thinking for solving any problem

اللغات

العربية
مبتدئ
الانجليزية
متمرّس

العضويات

نقابة المهندسين
  • عامل
  • March 2003

التدريب و الشهادات

LOGIC MANAGEMENT CONSULTING (الشهادة)
تاريخ الدورة:
January 2010
صالحة لغاية:
April 2010
COURSE LOGIC MANAGEMENT CONSULTING (الشهادة)
تاريخ الدورة:
June 2011
صالحة لغاية:
September 2011