Total Years of Experience: 25 Years, 9 Months
January 2016
To January 2017
Hydraulic System Engineer
at Engineering for Hydraulic and Renewable Energy
Location :
Egypt - Cairo
The main tasks were designing, modifying the hydraulic circuits and solving the technical problems of maintaining the hydraulic circuits, pumps, motors and pistons
I was responsible to organize the stores
I was responsible to organize the stores
May 2001
To December 2015
Hydraulic system engineer
at Hydraulic Misr
Location :
Egypt - Cairo
The main tasks were designing, modifying the hydraulic circuits and solving the technical problems of maintaining the hydraulic circuits, pumps, motors and pistons
I achieved to organize the workshop and the stores
I achieved to organize the workshop and the stores
February 1995
To August 1996
Production Planning and Material Control Section Head
at ABB Metal and Plastic (Asea Brown Boveri)
Location :
Egypt - Cairo
The main task was writing process sheets, planning and controlling the production plan activities
We managed to deliver multi giant projects for many customers in same time. Also, we succeeded to get ISO 9002 to our factory.
We managed to deliver multi giant projects for many customers in same time. Also, we succeeded to get ISO 9002 to our factory.
November 1987
To January 1995
Production Control Engineer
at Arab British Dynamics Co. (A joint venture between Arab Organization for Industrialization and Aerospace British)
The main task was project planning and executing the plan from design to customer delivery and ensuring that the final products would be complete in due time
As a member of production control engineers, we were able to organize production to manufacture and assemble many types of missiles which consists of thousands of parts and deliver it in due time
•Production Planning and Material Control Section Head
As a member of production control engineers, we were able to organize production to manufacture and assemble many types of missiles which consists of thousands of parts and deliver it in due time
•Production Planning and Material Control Section Head
September 1986
To October 1987
Mechanical Engineer
In National Center for Research and radiation
The main task was to assemble an electronic accelerator according to the drawing and specification
The main task was to assemble an electronic accelerator according to the drawing and specification
Share on Facebook
Share on Twitter
Share Via Email