for the project of the ministry at K.S.A (School, Gyms and School Complexes)
Duties:
- (Lighting= Power)
- Fire Alarm Sys
- Sound Sys
- Erathing sys
- Circuit Breakers
- Underground Cables
- Transformers
Duties:
- (Lighting= Power)
- Fire Alarm Sys
- Sound Sys
- Erathing sys
- Circuit Breakers
- Underground Cables
- Transformers
avril 2009
A juin 2011
Project
à scaps united group
Rois Compound
Project Cost : 20, 000, 000
Project Cost : 20, 000, 000
juin 2011
A avril 2011
Project
à Crown Home Consultants
Tourist Savanah Resort
Project Cost : 70, 000, 000
Project Cost : 70, 000, 000
avril 2006
A mars 2008
Maintenance Engineer
Lieu :
Émirats Arabes Unis
Working as a member of Cairo Electrical Distribution Company team who are responsible for:
Transformer maintenance ( from 100 KVA to 2500 KVA ) .
Network ( MV & LV ) installation and maintenance.
Cables and panels Testing
Transformer maintenance ( from 100 KVA to 2500 KVA ) .
Network ( MV & LV ) installation and maintenance.
Cables and panels Testing
Consulting Engineer
à Supply and distribution
design Distribution Department
Duties : Working as a member of (Crown Home Consultants) team who are responsible for:
Installing (low voltage/ low current) networks
LV &Control panels
Duties : Working as a member of (Crown Home Consultants) team who are responsible for:
Installing (low voltage/ low current) networks
LV &Control panels
Site Engineer
à Supply and distribution
Working as a member of Scaps United Group team who are responsible for:
Installing (low voltage/ low current) networks
LV &Control panels
Installing (low voltage/ low current) networks
LV &Control panels
Site Engineer
à AL-GIHAZ Company LTD
Lieu :
Arabie Saoudite
Distribution dept.
Duties : Working as a member of AL-GIHAZ team who are responsible for:
Installing ( Medium voltage / low voltage) networks ( 33/13.8/0.231 KV ) contains the following:
Over head lines
Underground cables
Transformers (50 KVA up to 2000 KVA )
Ring main units
IM ( switch cubicle )
QM ( Fuse switch combination cubicle )
Circuit Breakers
Meters
Duties : Working as a member of AL-GIHAZ team who are responsible for:
Installing ( Medium voltage / low voltage) networks ( 33/13.8/0.231 KV ) contains the following:
Over head lines
Underground cables
Transformers (50 KVA up to 2000 KVA )
Ring main units
IM ( switch cubicle )
QM ( Fuse switch combination cubicle )
Circuit Breakers
Meters