wagdy abdrabo, construction manager

wagdy abdrabo

construction manager

PICO International Petroleum - EGYPT

Location
Egypt - Cairo
Education
Bachelor's degree, mechanical engineering
Experience
32 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :32 years, 11 Months

construction manager at PICO International Petroleum - EGYPT
  • Egypt - Hurghada
  • My current job since December 2011

Period : From Jun 2015 till Present
Project : Engineering, Procurement, Construction, Commissioning and Start up for new Amal C offshore platform and related offshore works.
Job Title : Construction Manager
contractors : Aquaterra Energy UK. Petrojet Egypt, PMS Egypt.
Budget : 106 million U.S.D
Location : Egypt, Suize Gulf
Project Scope:
• Developing new production wellhead shell water jacketed type unmanned offshore platform (Amal C) and linked it via a piping bridge with the existing Amal B production platform.
• The platform facilitated with 5 level decks, 4 production slots, test separator, wellhead control panel, power module, chemical injection skid, gas drier, production manifolds, safety equipments, personnel module, sump tank, 10" production line receiver, flow lines & helicopter deck.
• Developing a new 10" offshore transmission pipe line between the existing and new production platforms.
Period : From Dec-11 up to Jun-2015
Project : Upgrading of Amal offshore and on shore oil & gas production facilities.
Job Title : Construction Manager
contractors : Enppi Egypt. Petrojet Egypt, PMS Egypt.
Budget : 360 million U.S.D
Location : Egypt, Suize Gulf
Project Scope:
• Upgrading the onshore facilities include adding of slug catcher train, oily water unit, knock out drum, two storage tanks, oil export pumps, Gas export compressors, extending the existing fir fitting system, flair system, constructing an onshore 25 km 16" oil export & 20 Km 16" Gas export onshore pipelines.
• Developing a new 5 utility buildings (administration, warehouse, substation & control room) with all associated activities.
• Upgrading of the offshore facilities include the structure and piping of two existing platforms (A &B) and laying 24", 8" & 4" offshore pipelines up to the on shore facilities with approx. 32 km length.

project manager at GULF CONSOLIDATED COMPANY [G.C.C.] - K.S.A
  • Saudi Arabia - Jubail
  • August 2009 to November 2011

Project : Jubail Export Refinery - Package 8 - Pipelines and off plot facilities (EPC project)
Job Title : Project Manager
Client : Saudi Aramco TOTAL refining & petrochemical Co. (SATORP)
Budget : 470 million U.S.D
Location : KSA, Eastern Area
Scope:
Covering the related Engineering, Procurement and Construction of:
• laying 13 pipelines with approximate 285 km length, dif. dia’s above and under ground with the associated scraper areas and covering all related construction activities (hot taping, heat tracing, leak detection systems, substations, hot and cold insulations, painting, steel structure, road and canal crossing, tie-ins, CP ) up to the mechanical completion and commissioning stage.
• Coke handling system with approximate 28 km length & 120cm width belt conveyor and associated 14 No.s of transfer towers, portal declaimers, ship loaders, storage buildings, control rooms, maintenance building, electrical drive motors, 6 No.s. of electrical substations, dilution system, fir fighting system and process control system and covering all related construction activities (steel structural, mechanical, civil, instrument & electrical) .

Area Piping Construction Manager at CONSOLIDATED CONTRACTORS COMPANY [C.C.C.] - K.S.A
  • Saudi Arabia - Jubail
  • August 2006 to August 2009

Job Responsibilities:
• Managing the piping construction activities of NGL area train I as per the following scope figures:
o Erection of 3, 000 Tons / 48, 000 linear meter of piping (1/2” up to 48" DIA)
o Erection of 72 static and rotating equipments
o Welding of 80, 000 DIA inches of piping
o Erection of 17, 000 pipe supports
o Releasing of 670 piping test packages up to reinstatement phase.
• Organize and supervise the work duties and tasks of the piping construction team that was consisting of:
o Piping site engineers \[ 7 No.s.\]
o Piping site supervisors \[5 No.s.\]
o Piping foramen, charge hands, fabricators, fitters, welders, helpers \[570 No.s.\]

Piping Projects Engineer at BADR ELDAIN PETROLUM CO. [BAPETCO] - EGYPT.
  • Egypt - Cairo
  • May 1997 to August 2006

Projects :
•OIL & GAS production flow lines
•Water injection flow lines
•Artificial lifting proposals
•Produced water project
•Field change proposals
Job Responsibilities:
•Ensure that engineering specifications, standards and procedures are developed, maintained and implemented by consultant / contractor in all project phases.
•Do the regular contacts with consultants, contractors, vendors and managements for coordination of projects engineering works.
•Develop the scope of work for consultants / contractors.
•Preparing the required piping design documents and drawings for the plant modifications and upgrading with ref. to shell DEP's & ANSI/ASMI standard.
•Carry out the reviewing and approval of contractors and sub contractors method statements of the work activities.
•Carry out technical evaluation / recommendation for tenders and approves selection of material items.
•Participate in the projects HAZOP studies.
•Attend weekly progress review meetings with consultants and contractors.
•Review and approve the projects organization and CV, s of contractors.

Piping Engineer at PAN EMIRATES ENGINEERING LTD [PEL] – U.A.E.
  • United Arab Emirates - Abu Dhabi
  • October 1993 to May 1997

Projects :
•Upgrading of drain sys. At BU-HASA & SHAH fields (A.D.CO.)
•Emergency pits for (A.D.CO.)
•Disposal water at BU-HASA (A.D.CO.)
•Optimization of test separators (A.D.M.A. O.P.CO.)
•Drain System in BU-HASA (G.A.S.CO.)
•42" main oil line replacement at ZIRKU for (Z.A.D.CO.)
Job Responsibilities:
•Preparing of the piping detailed design, piping layouts, ISO's, MTO's, piping specifications, piping martial requisitions, Tie-in details & schedules with reference to ANSI / ASMI cods and standards.
•Preparation of the general procedure of piping work.
•Site construction supervision.

Pipeline construction Engineer at H.H. AL-KHADDA CONSTRUCTION CO. - KUWAIT
  • Kuwait - Al Ahmadi
  • December 1992 to September 1993

Projects :
•Upgrading of brackish water sys. In BURGAN gathering center (K.O.C.)
•Upgrading of utility water sys. In MINA ABDULLA refinery (K.N.P.C.)
Job Responsibilities:
•Laying approx. 213, 000 fl of 16, 10, 8, 6, DIA inches of U/G pipelines from the south tanks farm to various locations of gathering centers in BURGAN area.
•Remove and replace approx. 55, 000 ft of 10, 8 DIA inches of U/G carbon steel cemented lined pipeline in MINA ABDULLA refinery.
•All of the associated work activities were done according to API-1104, ANSI B31.3 & ANSI B31.4 standard procedures.

Junior Piping Engineer at FIRST EGYPTIAN ENGINEERING CO. - EGYPT
  • Egypt - Cairo
  • June 1991 to December 1992

Projects :
Upgrading of the mixing unit facility (PROCTER & GAMBLE)
Fire fighting system (EL-AMAL PETROLEUM CO.)
Assaly power station (MANTRAC)
Job Responsibilities:
•Preparing the piping detailed design, piping layouts, piping ISO's MTO, piping specifications, MRQ's Tie-in details & schedules with reference to ANSI / ASMI cods and standards.

Education

Bachelor's degree, mechanical engineering
  • at Ain Shams University (Cairo) Faculty Of Engineering.
  • May 1991

Specialties & Skills

Refinery
Pipelines
msproject
fabrication cods and standards
autocad

Languages

English
Expert

Training and Certifications

Off shore facilities development (Training)
Training Institute:
IFP
Date Attended:
December 0013
Duration:
50 hours