وحيد عامر, Senior Contract Admin.

وحيد عامر

Senior Contract Admin.

pace

البلد
الكويت - الكويت
التعليم
دكتوراة, Construction Engineering and management
الخبرات
34 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :34 years, 3 أشهر

Senior Contract Admin. في pace
  • الكويت - الأحمدى
  • أشغل هذه الوظيفة منذ مارس 2016

PACE
Architecture
Engineering+
Planning
Amiri Diwan Prestigious projects
New Jahra Hospital with total cost 365
Million KD which consists of the main
hospital towers(15 floors) and Eleven
Satalite Buldings and laboratories.
Design Development, Construction,
Completion, Equipping, Furnishing,
Maintenance, And Operation Of New
Palace Of Justice Comprises construction
of part of the court complex building
including a conventional car parking facility
of two hundred and ninety (290) car
parking spaces for judges and staff, and
the court complex housing courts and
supporting offices. Stage 1 will also
include three (3) basement levels, Super
structure work consist of (Mezzanine floor +
level 1 + 1st
Mezzanine + from level 2 to 27 +
Lower roof + Upper roof)
− Administration of Construction Contracts with respect to
Progress Payments, Request For Proposals, Changes
and Variations and other aspects of the project.
− Overview and manage the implementation of established
administration and project control procedures by all
contractors and project team members such as
monitoring submittals, approvals and material
procurement.
− Administer and review the construction cost estimates
provided with each interim submission
− Assist in the review and update of project master
schedule, contractor's detailed schedules, cost loading
and schedule of values.
− Assessing and evaluating variations.
− Monitoring and mitigating contractors’ moves in cost and
time claim and assessing project risks in the better
interest of the project
− Administer the development and flow of engineering
formats for all contractors and CM staff through the PCS
system.
− - Managing key areas of risks and applying excellent
contractual and commercial practices .
− Lead all Contractual discussions, and advising the client
on the most suitable strategy and implementation
approach.
− Drafting contractual correspondences
− Assist in the preparation of the executive and progress
reports.
− Overview and manage the project records and
documents control procedures.
− Offering assistance with contractor claims
− Overview and administer the tendering documentation,
conditions of contracts and other legal clauses
governing the tender documents.
− Directly Responsible for the Administration of Tendering
Process of all Packages through evaluation and award
contracts.
− Administer the design program for the proposed
remaining buildings.
− Administer the design related issues, in coordination
with design review team and the client
− Monitor the interim submissions & deliverables of all
design consultants.
− Administer and review the construction cost estimates
provided with each interim submission. Follow up on
cost variances, coordinate with Owner accordingly for
budget allowances and constraints.
− Providing independent liaison and coordination to insure
compliance with contract conditions and resolution of
problems and conflicts
− Analyzing request for deviations from contract
documents and delivery schedules
− Reviewing contractors Performance against contract
requirements

Lead Administration Contract في SSH
  • الكويت - السالمية
  • أبريل 2014 إلى مارس 2016

Wahid has more than 25 years of construction supervision and management experience in Egypt, Saudi Arabia and Kuwait. He has been extensively involved in sophisticated and complex construction projects like New Jahra Hospital with total cost 365 Million KD which consists of the main hospital towers (15 floors) and Eleven Satalite Buildings and laboratories as lead administration Contract, Sheikh Abdulla Al Salem Cultural Center 7-Museums with SSH Design(As Project Administrator), Baitek Tower (42 floors Building) with NEUREC as Project Manager, Sharq Market with KEO, Tent Market at Jahra, CRC Residential Tower and SIMPHONY Hotel Complex project at Salmia with Projacs as PCS Manager . He was involved with Awqaf in Multistory Car Park and Shops project as Project Engineer with Projacs. He was involved with NUREC (Project Management Company) in Kuwait Finance House New 11 Bank Branches Project as Project Manager. He was involved (for 2 years) in Invest Group As Technical Sector Manager and Sr. Contract Administrator . For the last 7 Years he worked as Contracts Manager or Sr. Contract Adminstrator in Amiri Diwan Prestigious projects as member of the Consultant Staff managing those projects(Sheikh Abdulla Al Salem Cultural Center 7-Museums (KD 135 Millions) with SSH, New Jahra Hospital(KD 364 Millions) with Pace and New Palace Of Justice(KD 238 Millions)also with Pace. He has a good experience to Monitor construction progress and review the monthly construction budget to detect any variances, He has wide experience in time & cost control and contract administration. He is also well experienced in planning and scheduling utilities with latest computer software Primavera Project Planner (P3, P6). He has gained extensive experience in the administration of Reviewing and verifying various report produced by the contractors, including analysis of the CPM, Progress report, Payment Applications, Variations Orders, Document Management (Submittals, Procurement, Shop Drawings Logs ), Computer skills along with project control system in order to achieve client's requirements and forecasting the impact of project constrains on the project completion date, Generally, Administer, Monitoring and control the project with the assistance of all project staff.

 متابعه القضايا المرفوعه من المقاولين بالمحاكم وكذلك أجراءات التحكيم من طرف صاحب العمل(الدعم التعاقدي والقانوني والفني)--
حضور جلسات التقاضي بالمحكمة لمناقشة الخبراء والقضاه ودعم فريق صاحب العمل ومراجعه التقارير الفنيه والقانونيه والتعاقدية قبل تقديمها للجهات المختصه
Fidic Determination Sessions For Claims Settelement--

Contracts Manager في ESG Consultant
  • الكويت - الدسمة
  • أبريل 2010 إلى أكتوبر 2012

Wahid has more than 25 years of construction supervision and management experience in Egypt, Saudi Arabia and Kuwait. He has been extensively involved in sophisticated and complex construction projects like New Jahra Hospital with total cost 365 Million KD which consists of the main hospital towers (15 floors) and Eleven Satalite Buildings and laboratories as lead administration Contract, Sheikh Abdulla Al Salem Cultural Center 7-Museums with SSH Design(As Project Administrator), Baitek Tower (42 floors Building) with NEUREC as Project Manager, Sharq Market with KEO, Tent Market at Jahra, CRC Residential Tower and SIMPHONY Hotel Complex project at Salmia with Projacs as PCS Manager . He was involved with Awqaf in Multistory Car Park and Shops project as Project Engineer with Projacs. He was involved with NUREC (Project Management Company) in Kuwait Finance House New 11 Bank Branches Project as Project Manager. He was involved (for 2 years) in Invest Group As Technical Sector Manager and Sr. Contract Administrator . For the last 7 Years he worked as Contracts Manager or Sr. Contract Adminstrator in Amiri Diwan Prestigious projects as member of the Consultant Staff managing those projects(Sheikh Abdulla Al Salem Cultural Center 7-Museums (KD 135 Millions) with SSH, New Jahra Hospital(KD 364 Millions) with Pace and New Palace Of Justice(KD 238 Millions)also with Pace. He has a good experience to Monitor construction progress and review the monthly construction budget to detect any variances, He has wide experience in time & cost control and contract administration. He is also well experienced in planning and scheduling utilities with latest computer software Primavera Project Planner (P3, P6). He has gained extensive experience in the administration of Reviewing and verifying various report produced by the contractors, including analysis of the CPM, Progress report, Payment Applications, Variations Orders, Document Management (Submittals, Procurement, Shop Drawings Logs ), Computer skills along with project control system in order to achieve client's requirements and forecasting the impact of project constrains on the project completion date, Generally, Administer, Monitoring and control the project with the assistance of all project staff.

 متابعه القضايا المرفوعه من المقاولين بالمحاكم وكذلك أجراءات التحكيم من طرف صاحب العمل(الدعم التعاقدي والقانوني والفني)--
حضور جلسات التقاضي بالمحكمة لمناقشة الخبراء والقضاه ودعم فريق صاحب العمل ومراجعه التقارير الفنيه والقانونيه والتعاقدية قبل تقديمها للجهات المختصه
Fidic Determination Sessions For Claims Settelement--

Manager في Wahid El Sayed Hassan Amer
  • يوليو 2004 إلى مارس 2010
Projects Manager في NUREC
  • الكويت - الكويت
  • يوليو 2004 إلى مارس 2010

NUREC
(Project
Management
Company)
• Kuwait F. H. Bank -New 11
Branches Project (K.D. 12 M)
With KEO International
*Supervise the work of consultant and contractors for
compliance with the approved contract documents and
advise the client of changes (if any).
*Resolving progress constrains related matters
*Monitoring Consultant staff Performance at site.
*Reviewing and approving Materials Submittals with
the help of the Consultant (KEO).
*Preparing Progress presentations (Power point)
*Monitoring Contractor’s staff Performance at site
*Administer the development and flow of Engineering
formats for contractors and CM staff through the PCS
system.
*Utilization of various computer software such as:-
Primavera (Ver. 3)&Excel &Power Point &MS Word.
*In charge of monitoring project, reviewing detailed
schedule, cost loaded schedule, expected Cash Flow,
and Logs.
*Overview and manage the project records and
documents control procedures.
*Acting and replying to project parties correspondences.
*Follow-up on the submittals & procurement of
contractors on monthly bases to assure that contractors
works are being executed as per approved target
schedules and to eliminate/refute contractors claims. In
addition responding to contractors claim records, and
advising.
*Maintain at the project site archives of all documents,
accounts, correspondence and drawings pertaining to
the project and submit these to the owner upon project
completion to ensure complete records handover and
smooth facility operation.
*Chair all meetings with consultants, contractors.
*Preparing Monthly Progress Reports to the Owner.
*Evaluating the request for time extension.
*Monitoring the progress of work according to the
schedule.
*Studying the contract Doc. To indicate the owner
position and contractor position for each issue and
then recommending the

PCS Manager في PROJACS
  • الكويت - السالمية
  • مايو 2001 إلى يوليو 2004

Head Office (Pre-Construction
Phase)
*Fahaheel Water Front(KD 20M)
*Wedian Stores(KD 3M).
*KNPC Head Office (KD 16M).
*Dassman Center Hospital(KD
14M).
*Co-Coordinating Design Management Activities.
*Reviewing the tender documents before
tendering.
*Preparing Proposals for the new projects.
*Proposing the Method Statement of the projects
*Resolving progress constrains related matters
*Evaluation Consultants proposals both
(Technically & Financially).
*Evaluation Contractors tenders submittal both
(Technically & Financially).
*Reviewing design documents, Tender
documents, tender evaluation, and creating
construction management procedures.
* Reviewing construction tender documentation
for completeness and proper interfacing
requirements among contractors.
*Preparing Design Review Report to the Owner
*Participation in Writing the new projects TOR
*Writing and Follow up correspondences to the
consultants and owners.
*Reviewing &Follow up and Updating
Consultants Design Schedule.
*Participate in the selection of Consultants:
▪ Prepare terms of reference (TOR) to aid in pre-
qualifying consultants
▪ Short-list candidates to be invited for design
competitions
▪ Study, analyze and evaluate financial and technical
offers
▪ Prepare and furnish the owner with an evaluation
report
▪ Participate in the final negotiations and finalize all
contractual issues with the selected consultant
*pre-qualify contractors based on pre-
qualification criteria, Initiate, review and update
the development of a preliminary Management
Plan - Project Manual for standardized forms

PCS Manager في PROJACS
  • الكويت - الفحيحيل
  • مايو 2001 إلى يوليو 2004

Construction Sites
*Awqaf Multistory Car Park and
Shops (Sharq Area)(KD 8M).
*KNPC Head Office (Ahmady)(KD
16M).
*SIMPHONY Hotel Complex project
at Salmia (KD 28M).
*Overview and manage the project records and
documents control procedures.
*Resolving progress constrains related matters
*Acting and replying to project parties correspondences.
*Preparing Progress presentations (Power point)
*Administer the development and flow of Engineering
formats for contractors and CM staff through the PCS
system.
*Monitoring and control the project with the assistance of
all Project staff.
*Supervise the work of consultants and contractors for
compliance with the approved contract documents and
advise the client of changes (if any)
*Follow-up on the submittals & procurement of
contractors on monthly bases to assure that contractors
works are being executed as per approved target
schedules and to eliminate/refute contractors claims. In
addition responding to contractors claim records, and
advising.
*Maintain at the project site archives of all documents,
accounts, correspondence and drawings pertaining to
the project and submit these to the owner upon project
completion to ensure complete records handover and
smooth facility operation
*Chair all meetings with consultants, contractors
*Preparing Monthly Progress Reports to the Owner.
*Evaluating the request for time extension.
*Monitoring the progress of work according to the
schedule.
*Studying the contract Doc. To indicate the owner
position and contractor position for each issue and then
recommending the owner.
*Utilization of various computer software such as:-
Primavera (Ver. 3)&Excel &Power Point &MS Word.
*In charge of monitoring project, reviewing detailed
schedule, cost loaded schedule, expected Cash Flow,
and Logs.
*Preparing & Updating Project Master Schedule.
Wahid El Sayed Hassan Amer

Sr Planning Engineer في Keo International Consultants - KUWAIT
  • الكويت - الجهرة
  • أبريل 1998 إلى أبريل 2001

Planning tasks

Planning Engineer في Gulf Engineering
  • الكويت - السالمية
  • يونيو 1997 إلى أبريل 1998

PLANNING

PCS Manager and trainer في NCCD- World Bank Loan
  • مصر
  • مايو 1993 إلى مايو 1997

Construction
Scheduler and
Trainer of
Primavera
Using
PRIMAVERA
For Windows
&Ver. 5
*Lecturer of
Construction
Management
Topics
National Company
for Construction and
Development

Lecturer
  • مايو 1993 إلى مايو 1997

Member of
the Technical
Office for the
Supervision
of the
Application of
World Bank
Loan
(WBL2460 -
EGT),

Scheduler في BG Consulting Group
  • مصر - القاهرة
  • يونيو 1991 إلى أبريل 1993

PRIMAVERA Ver.
5 & 4&
Microsoft Project
B.G. Consulting
Office (Cairo)
Greater Cairo Waste Water
Treatment Plant which Consists
of Six Aeration Tanks, Twelve
Final Clarifier Tanks, Ten
Sedimentation Tanks and Five
Administration Buildings.
(The Size of the Project
$300, 000, 000)
*Preparing the Project Construction
Schedule after discussion with
the American - British Consulting Office
(AMBRIC) and also with the Engineers of
the Italian Company
(ANSCO) that managing the project.
*Preparing the resource requirements.
*Updating the programs according to
actual work by using Primavera and
Microsoft Project.
*Revision of Contractor's Drawings Co-
ordination Log.
*Preparing a Comments to the
contractors with regard to work progress
and updating schedule.
*Preparing Consultant Monthly Progress
Report to the Owner Explaining Project
Status
(Time &Cost Control).
*Preparing Design Schedule (Proposal)
for many Projects.

Site Engineer
  • مايو 1989 إلى نوفمبر 1989
Site Engineer في Army Forces
  • مصر
  • مارس 1987 إلى مارس 1989

The Size of the Project L.E
39, 000, 000)
Adabia Port Project which
consists of Two buildings and
Three big stores.
(The Size of the Project L.E.
14, 000, 000)
*Supervision and Execution of Concrete
Works,
Internal Finishing Works & External
Finishing Works
& Landscaping works & Roof Insulation
Works
*Supervision and Execution of Skeleton
Works, Finishing Works, Fences Works
of a Military Project

الخلفية التعليمية

دكتوراة, Construction Engineering and management
  • في Zagazig University
  • يناير 2002

courses: Expert System For Diagnosing Delay's Problems In Construction Projects In Egypt)-

الثانوية العامة أو ما يعادلها, Construction Engineering and management
  • في Zagazig University
  • يناير 1995

courses: Analysis and Evaluation of Delay’s Problems In Construction Projects In Egypt)-

ماجستير, Construction Engineering and Management
  • في Zagazig University
  • أبريل 1994

Master

Specialties & Skills

Staff Supervision
Contracts Review
Project Management
Control M
CUSTOMER RELATIONS
DOCUMENTATION
MICROSOFT WORKS
PROCUREMENT
PROGRESS
PROPOSAL WRITING
APPROACH
BUDGETING
CONSULTING

اللغات

الايطالية
متمرّس

التدريب و الشهادات

Consultant (الشهادة)
تاريخ الدورة:
March 2009

الهوايات

  • Playing Sqaush
    sport