Wajid Kalwar, Junior Engineer I&C

Wajid Kalwar

Junior Engineer I&C

KEPCO KPS

Lieu
Pakistan
Éducation
Baccalauréat, Electronics
Expérience
11 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 10 Mois

Junior Engineer I&C à KEPCO KPS
  • Pakistan
  • Je travaille ici depuis mai 2014

•Good I&C engineering foundation and practical knowledge of modern gas turbine and CCPP.
•Introduction of GE Speedtronic Mark-VI Control System - Used Toolbox Control System.
•Ovation Expert Control System for Steam Turbine Control.
•Honeywell Experion Control System C200 for common plant equipment control.
•Safety Manager SIL 3 for Boiler Protection.
•Supervise preventive/corrective maintenance activities of Instrumentation and Control Section. It includes various types of field instrumentation installed at site, DCS, ESD and other control systems. Objective of my job is to ensure minimum down time of plant.
•Knowledge of Quality, Health, Safety and Environment management systems, safety rules and associated safety legislation.
•Implementation of I&C engineering practices in accordance with OEM and international standards.
•Preparation of Maintenance Procedures.
•Knowledge and expertise in maintenance of gas chromatograph, CEMS, wobbe index meter, analytical instruments and control valves.
•Honeywell Sieger 5701 Gas Detection Control System.
•Development of routine plant maintenance through use of the CMMS (Computerized Maintenance Management System, MP2

Traine Engineer I&C à KEPCO KPS
  • Pakistan
  • avril 2013 à avril 2014

Routine Inspection and Maintenance of GT, BOP and ST instruments.Working on MP2 (CMMS). Knowledge about DCS and PLC logic.

BSS Engineer à Huawei Pakistan
  • Pakistan - Karachi
  • novembre 2012 à mars 2013

Worked at Roll out Integration NSS team. Integrated more than 100 sites of Zong in Karachi.Client Inspection and rectification of sites.
Installtion of BTS with designed manner.

Internee à News One channel (Air Waves (Pvt) Limited)
  • Pakistan - Karachi
  • août 2011 à novembre 2011

➢ Worked as Internee at News One channel (Air Waves (Pvt) Limited)
From Aug 2011 to Nov 2011
• Key Responsibilities: ✓ DSNG Operation.
✓ Transmission Monitoring & Control.


Final year project:
➢ "AUTOMATIC WATER CONTROL SYSTEM THROUGH PLC"


Professional Affliction:
➢ PEC


➢ Computer Communication and Networking proficiency.
➢ The concept of mobile & Cellular Communication System.
➢ Basic knowledge of Wire & wire less transmission.
➢ Fundamental knowledge of Communication Electronics specially Modulation techniques.
➢ Fundamental concepts of Instrumentation and Measurements
➢ Basic Idea about Automation (PLC, DCS, SCADA) and Robotics.
➢ Introduction of Power electronics devices especially SCR, DIAC, TRIAC, AC & DC drive, UPS.
➢ Overview about Digital Electronics and Control Engineering System.



• Operating System: Windows XP, Windows 2000, Windows 98.
• Engineering: PLC.
• Programming: C Language Assembly.
• Other: MS Office 2007/2003, Computer Hardware/ Software Installation and Troubleshooting and Internet.

Éducation

Baccalauréat, Electronics
  • à QUEST Nawabshah
  • janvier 2010

Qualification Year of passing Board/university Percentage % Grade/Division B.E (Electronics) 2010 "QUEST" Nawabshah 78.74% 1st division Intermediate 2006 B.I.S.E Sukkur 74% "A" Grade

Specialties & Skills

Instrumentation
Introduction
Programming
ASSEMBLY
CELLULAR
INSTRUMENTATION
MICROSOFT WINDOWS
MS OFFICE
POWER ELECTRONICS

Langues

Urdu
Expert
Anglais
Moyen

Formation et Diplômes

Control Automation Using PLCs (Formation)
Institut de formation:
NIDA Lahore
Date de la formation:
March 2016
Durée:
28 heures

Loisirs

  • Snooker and Cricket