Automation Engineer
Mehta Brothers (Pvt.) Ltd.
Total years of experience :13 years, 8 Months
=> Responsibilities:
- Erection, commissioning till installation and operation of SCADA systems; PPLDS (Post Pelleting Liquid Dosing System), MLDS-Pre Pelleting (Multi Liquid Dosing System), NIR (Near Infrared) Spectrometers and Automatic Weighing Systems in Poultry Feed Mills.
- Planning, scheduling and carrying out quality inspection and procurement of all Electromechanical and Control instruments.
- Providing Consultancy services to the end customers all over in Pakistan; regarding troubleshooting activities and maintenance works required.
- Working and Coordination with Singaporean and Chinese engineers about system design up gradations and performance parameters.
=> Projects Completed:
- PPLDS Systems (1 to 3 lines)
- MLDS (Rhodimet AT88 Batch Dispensing Systems) (3 lines)
=> Field work areas:
Hi-Tech Feeds Lahore, Big Feed Raiwind, MB Feeds Islamabad,
Multan Feeds Multan,
Hi-Tech Feeds Sahiwal, Shahzor Feeds Sheikhupura, Islamabad Feeds Okara, Islamabad Feeds Islamabad,
Supreme Feeds Sahiwal, National Feeds Sheikhupura,
Panjnad Feeds Okara, Asia Feeds Karachi.
=> Responsibilities:
- Erection, Commissioning till installation and operation of "Hot Coal Gasifier" plants.
- Planning, scheduling and carrying out all the maintenance works required.
- Carrying out mechanical and electrical quality inspection on plant machinery and equipments.
- Monitoring and troubleshooting activities of electrical and mechanical instruments.
- Implemented Scheduled maintenance procedures and SOPs for different equipment.
=> Projects Completed:
- Single Stage Hot Coal Gasifier
- Double Stage Hot Coal Gasifier (2.6m)
- Double Stage Hot Coal Gasifier (3.2m)
=> Field work areas:
Super Steel Lahore, Model Steel Lahore,
Ittehad Chemicals Ltd. (ICL) KSK Lahore, New Shalimar Steel Lahore.
=> Responsibilities:
- Programming in Java and its interfacing with hardware
- Teaching pre-engineering subjects to F.Sc. students
- Teaching Instrumentation subjects to Engineering students
=> Projects Completed:
- Control of outputs via UDP
- Java based projects using GSM & WIFI
- Several university level projects
My academics at university were good and I got university scholarships in number of semesters. I stood also a best Badminton player.
My academics at college level had a rising graph and at the end I was the topper of my college.