Wakeelur Rahman Wakeelur, site Engineer

Wakeelur Rahman Wakeelur

site Engineer

Sterling & Wilson Ltd

البلد
الهند - دلهي
التعليم
بكالوريوس, Electrical Engineering
الخبرات
18 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 7 أشهر

site Engineer في Sterling & Wilson Ltd
  • الهند
  • أغسطس 2018 إلى أكتوبر 2021

Cairn-Vedanta MBA-01(Mangla Bhagyam, Aishwarya) project as an Electrical

Engineer
  • مارس 2015 إلى يوليو 2016

Worked with Saudi Arabian oil company Saudi Aramco through Hak group(T &TS)division as an

Electrical Engineer في Larsen & Toubro ATCO Saudi LLC
  • المملكة العربية السعودية
  • يوليو 2012 إلى سبتمبر 2013

SADARA Polyethylene Project, Jubail-2
Major supplies: Power Transformers 34.5/4.16 KV, 25 MVA, 34.5/.48 KV, 3/3.75 MVA, switchgears, MCC etc.
Major jobs:Responsible for Erection commissioning and testing of Substations, Planning of materials, manpower management, Vendor finalization etc

Manager في Tata Steel Ltd
  • الهند
  • يناير 2008 إلى مايو 2011

responsible for overall activities including Project Monitoring, planning, execution and all techno-commercial issues related to the project.
•Erection, Commissioning& Testing of all types of HT & LT Electrical equipments like Power Transformers, Switchgears, new substations & Augmentation of the existing 33/6.6 KV substation, 6.6/.415KV substation, facilitating the enabling activities like HT/LT cable diversion and miscellaneous construction power management for the entire department.
•Analyzing & Reviewing: Procurement of Equipments like Transformers, Switchgears, LT Panels etc; Responsible for the coordination with different departments, understanding the requirements of the key customers.
•Modernization : Capable of analyzing modernization needs & computing time, materials and manpower requirements for successful execution of the project and Controlled and Motivated team of staff and guided them to achieve optimum productivity

Project Manager
  • يناير 2008 إلى مايو 2011

for the up gradation of 33/6.6 KV AIS Substation to GIS one, New 6.6/.415 KV substation for the 3 MTPA expansions Project of the Tata Steel, Jamshedpur.
Major Supplies & Erection: 25/31.5MVA Transformers, 1.6 MVA Transformers, 6.6 kV switchgears, 33kv GIS etc.
Major Challenge: Completion of the project without affecting the plant production and within given timeframe.

SITE ENGINEER في RELIANCE ENERGY LIMITED
  • الهند
  • سبتمبر 2005 إلى أكتوبر 2007

Involved in supervision of project.
•Managing the contractors, documentation of whole process, material management, planning and proper co-ordination systematically.
•Proactively interacted with clients for approval of drawings and responsible for successful contract closing.

KEY PROJECTS

ENGINEER
  • سبتمبر 2005 إلى أكتوبر 2007

for Rural Electrification work in Pilibhit District (536 villages) of Uttar Pradesh. (UPRE)

Major Supplies & Erection : 33/11 KV, 5 MVA Transformer- 7 No’s, 33 KV lines- 70 Km, 11 KV lines -1332 Kim’s, 11/0.25 KV single phase Transformer 10 KVA, 16 KVA & 25 KVA (3 Phase Transformer) -1661 Nos.

Profile: upgrading 33/11 KV substation, Commissioning, testing whole the equipments. Supervision of 33 kV substation, Erection, Stringing of conductors, Augmentation, Erection of poles, Transformer, area survey, GIS, management and planning and we electrified whole the rural area with installing & upgrading Grid substation, feeders, laying down thousands of kilometers of cables to consumers.

SITE ENGINEER في MASS METER
  • نوفمبر 2004 إلى أغسطس 2005

REPLACEMENT PROJECT of BSES, New Delhi. Profile: Order finalization and contract execution of various contractors for the Project in Delhi.

Major Supplies: Electronics meter 3 Phase & Single Phase, Cable, Gland, Lugs, Junction Box etc

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في JAMIA MILLIA ISLAMIA, a central university
  • يناير 2003

(

Specialties & Skills

MS Office tools
Project Management
CABLING
MATERIALS MANAGEMENT
OIL PAINTING
PROCUREMENT
PRODUCTION
SWITCHES
ELECTRONICS