وليد باكير, Project Manager

وليد باكير

Project Manager

Adex

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Civil Sturctural Engineering
الخبرات
23 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 8 أشهر

Project Manager في Adex
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ ديسمبر 2016

Duties and Responsibilities: include but not limited to

 Managing project communication with all stakeholders
 Carry out the project assignments on a daily basis as per the set plan
 Manage and leading teams to achieve goals and objectives and validating project deliverables
 using project management software packages to plan smooth work flows
 Responsible for forecasting the future variances and earned value analysis
 risk identification, analysing, risk response planning and risk monitoring.
 monitoring and controlling project budget

Construction Manager | Civil Engineer في Al Fatih Aldwaliya Company
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2015 إلى ديسمبر 2016

Duties and Responsibilities include but are not limited to :

 preparing the site and liaising with other construction professionals such as architects, engineers, buyers, estimators and surveyors before construction work starts
 accurately providing status information on project progress to the project management
 planning ahead to prevent problems on site before they occur
 making safety inspections of the site when work is underway and ensuring regulations relating to health, safety and the environment (HSE) are adherred to
 using construction management software packages to plan smooth work flows
 assisting the project manager with bidding new jobs and projects
 communicating effectively with a range of people including the client, subcontractors, suppliers, the public and the workforce

Civil Sturctural Engineer, PMP , RMP-PMI في Zuhair Fayez Partnership and saudi basic industries corporation ( Sabic)
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2014 إلى أكتوبر 2015

Agriculture Research Center (Estidamah)
The project is consisting of main building, common facilities building, utilities building and greenhouse building.
My duties and responsibilities are as follows but not limited to :
 Monitoring contractor’s and sub-contractor’s performance with respect to all aspects of Civil/Structural works and documentation records to ensure compliance with the approved drawings, specifications and quality system documents.
 Reviewing project standards and documents to assure the submitted drawings and documents are compatible and aligned with the overall project objectives.
 Reviewing design drawings( 60% package -90% package - IFC drawings)
 Continuous monitoring that the project progress according with the approved schedule.
 Review contractor’s method statement and work procedures.
 Review and check materials submittal, Inspection and test plan (ITP), shop drawings for Civil/Structural .
 Responsible to review and response the technical query (TQ) of the contractor.
 Attend weekly construction meeting, Initiate coordination.
 Write field memo instructions and letters to contractor, whenever needed.
 Participating in preparing of risk management plan in compliance with client's risk management policy and procedures.
 Participating in risk identification, analysing, risk response planning and risk monitoring.
 Promptly inform the project manager for stoppage of work when safety concern override basic contractual commitments or when continuation will result in the inclusion of the substandard work.

Civil Engineer , PMP في Zuhair Fayez Partnership ( ZFP)
  • المملكة العربية السعودية - الأحساء
  • سبتمبر 2013 إلى أكتوبر 2014

King Faisal University Teaching Hospital Project,
The project is consisting main building (400 beds, 11 floors), out-patient clinics building (4 floors) built on an area of 170, 000 m2

Civil Engineer في Zuhair Fayez Partnership (ZFP)
  • المملكة العربية السعودية - الأحساء
  • مايو 2012 إلى سبتمبر 2013

The Infrastructure Phase-4 Stage-1 A project is located along the Academic Area, East Loop Road, West Loop Road, Road-A, Male's Dormitory Area, and Female's Dormitory Area of King Faisal University Campus, Al - Ahsa.
1. Generator Building including Civil & Electro-Mechanical Works.
2. Roads & Street Improvement Works (285.000 m2 asphalt)
3. Landscape & Hardscape Works
4. Bridge, Spine Wall & Retaining Wall Works.
5. Underground Utilities such as: (Sanitary Sewer System -Storm Water Drainage System -Raw Water System Sweet Water System -Well Water System (4 deep wells)-Chilled Water System -Irrigation System.)

Civil Engineer في Zuhair Fayez Partnership ( ZFP)
  • المملكة العربية السعودية - الأحساء
  • ديسمبر 2010 إلى مايو 2012

Mosque and Administration Building Porject. King Faisal University, Al Ahsa
The Mosque includes two floors with capacity 2200 prayers and 56 m high Minaret, and the administration building includes basement and five repeated floors at a total area of floors 40630 m2

Civil Engineer في Zuhair Fayez Partnership ( ZFP)
  • المملكة العربية السعودية - الأحساء
  • أكتوبر 2007 إلى ديسمبر 2010

Infrastructure Project PH# III, King faisal University
The project is civil, mechanical, & electrical infra-structure works for
1- Supply & Installation of Sewage Treatment Plant (STP), Reverse Osmosis Plant (R.O), and Emergency Generator Building
2- Supply & Installation of Piping Networks for:( Chilled Water System-Sanitary Sewer System-Sweet Water-Raw Water Distribution System-Storm Water Drainage System-Lift Stations )
And also Works related to Landscaping, Hardscaping Works of Pergola & Shade Structures, Stamp Pavement Works, Water Display Networks, Irrigation System, Plantations, Drinking Water Fountains, Tennis Courts, Compact Sub-Stations, and Street Lighting Electrical Works.

Civil Engineer في Zuhair Fayez Partnership ( ZFP)
  • المملكة العربية السعودية - حائل
  • أبريل 2006 إلى أكتوبر 2007

150 Health Primary Units, MOH, Haeil City, 8 Units .
My duties and responsibilities during my work in ZFP were as follows but not limited to:
 Monitoring contractor’s and sub-contractor’s performance with respect to all aspects of Civil/Structural works and documentation records to ensure compliance with the approved drawings, specifications and quality system documents.
 Continuous monitoring that the project progress according with the approved schedule.
 Review contractor’s method statement and work procedures.
 Review and check materials and shop drawings for Civil/Structural .
 Responsible to review and response the technical query (TQ) of the contractor.
 Attend weekly construction meeting, Initiate coordination.
 Write field memo instructions and letters to contractor, whenever needed.
 Responsible for any non-compliance and raising quality notices for issues to the contractor in the form on Non-Conformance Notices or Deviation Notices.
 Responsible for site inspection and handling request for inspection (RFI’s)for various items of work related to Civil /Structural works.
 Promptly inform the project manager for stoppage of work when safety concern override basic contractual commitments or when continuation will result in the inclusion of the substandard work.

Site Engineer في Fahad Abdulkarim Al Mojail and Bros. Co.
  • المملكة العربية السعودية - حائل
  • أغسطس 2004 إلى أبريل 2006

King Salman Center for Disabled Children
In Hail City
Duties and Responsibilities
 Coordinating all construction activities on site with different disciplines and parties.
 Prepare the required reports ( daily, weekly and monthly) for construction activity schedule.
 Control of drawings, manpower, and equipment to follow up the time schedule of project.
 Follow up concrete delivery and other civil material by good situation as per required.
 Ensure availability of sufficient manpower and construction equipment.
 Provide guidance / technical support to the field staff.
 Prepare periodical report and immediate reporting about critical issues.
 Prepare RFI and coordinate with inspectors and the third party inspection agency.
 Preparation of As Built drawings.

Civil Structural Engineer في General Company for Hydraulic studies(GCHS)
  • سوريا - حمص
  • نوفمبر 2000 إلى أغسطس 2004

Duties and Responsibilities
 Participating in prepare tender drawings and Bill of Quantities.
 Assist senior designers in structural design of ( Pump stations, Box culverts. Retaining walls...etc.)

الخلفية التعليمية

بكالوريوس, Civil Sturctural Engineering
  • في Al Baath University
  • سبتمبر 2000

Specialties & Skills

Civil Engineering
Structural Design
Risk Management
Risk Control
Project Management
Primavera P6
Autocad
Project management
construction management
sap2000
primavera risk analysis
structural analysis
team management

اللغات

الانجليزية
متوسط
العربية
متمرّس
التركية
مبتدئ

العضويات

Project Management Institute
  • Member
  • January 2013
Saudi Council of Engineers
  • Civil Engieer
  • April 2012

التدريب و الشهادات

Project Management Professional PMP (الشهادة)
تاريخ الدورة:
May 2013
صالحة لغاية:
May 2019
Risk Management Professional RMP-PMI (الشهادة)
تاريخ الدورة:
February 2015
صالحة لغاية:
February 2018