MEP – Construction Manager
Saudi Bin Laden Group
Total des années d'expérience :20 years, 4 Mois
Project King Saud Bin Abdul Aziz University
Responsibilities:-
• Projects implementation of all electromechanical works, starting from Mobilization Workshop & Stores erection, project activities Installation, Testing & Commissioning, Billing preparation, Variation Order , Handing Over and Follow up Services.
• Preparing Material Submittals, Workshop Drawing, AS built drawing and Project Schedule Services.
• Projects co-ordinations with all other trades and disciplines especially Interior Design.
• Preparing cost estimate for tenders.
• Follow up with consultant & client requirement.
• Mechanical design drawing checking & HVAC load calculation verification.
Professional Experiences
• Pumping Station &Lifting Station Plant -- (chilled water, domestic, drainage, oily water, gases, etc.).
• H.A.V.C. Systems -- (Chillers, AHU’s, PCU, VAV box ……… etc.). Installation & Design for HVAC using load calculation (Block load, HAP, REF Software), Equipment Selection, Material Submittal & Shop drawing preparation.
• PIPING Systems -- (Steel, Galvanized, Ductile & Cast iron, Copper, PVC, FPG, UNI pipe, Thermal pipe) . Design, Sizing& Installation for all piping as chilled water pipes, firefighting pipes, domestic &drainage pipes.
• ALL Duct work with all types Round, Spiral, Oval, Rectangular ( GI, Black steel, Stainless steel, Aluminum )complete with all accessories(plenum boxes, dampers, flexible, liner ..), complete with duct sizing & design.
• Fire Fighting Systems -- (including above ground & underground Installation with different fluids as water, Foam, CO2, FM200 & Integrin gases).
• Plumbing Systems - Installation & Design (including internal & external main water supply lines & drainage system, sanitary fixture , sanitary ware).
• Diesel power & steam generator plants and electrical general.
• Water and sewage treatment plants, RO.
• Electrical external &internal (Power & lighting Systems, cable& wire pulling, lightening & grounding, lighting fixtures, wiring device, ………etc)
• Medium voltage sys (including, Switchgear, RMU, Transformer, Generator).
• BMS (building management system).
• Aware of most of international code & Standards (ASHRAE, AMCA, SMACNA, ARI, ASTM, Uniform Plumbing, National plumbing, NFPA, NEC).
Position - Senior Mechanical Engineer
Period - 2012 - 2015
Projects Executed & Ongoing
• King Abdullah Specialized Children’s Hospital KASCH- 560 Beds NGHA Project, Riyadh
• Prince Majid & Price Masrour Palaces - Exit -12, Riyadh
• King Abdullah Foundation for Humanitarian Project- 27 Floors, 388 Guest Rooms SOFITEL 5*Hotel, Riyadh
• Central Marketing Authority Building - 76 Storey High Rise Building, Riyadh (King Abdullah Financial District)
• Nero Science Center, Mental Health Hospital & Hospital Administration Building - NGHA Project
Responsibilities:-
• Projects implementation of all electromechanical works, starting from Mobilization Workshop & Stores erection, project activities Installation, Testing & Commissioning, Billing preparation, Variation Order , Handing Over and Follow up Services.
• Preparing Material Submittals, Workshop Drawing, AS built drawing and Project Schedule Services.
• Projects co-ordinations with all other trades and disciplines especially Interior Design.
• Preparing cost estimate for tenders.
• Follow up with consultant & client requirement.
• Mechanical design drawing checking & HVAC load calculation verification.
Professional Experiences
• Pumping Station &Lifting Station Plant -- (chilled water, domestic, drainage, oily water, gases, etc.).
• H.A.V.C. Systems -- (Chillers, AHU’s, PCU, VAV box ……… etc.). Installation & Design for HVAC using load calculation (Block load, HAP, REF Software), Equipment Selection, Material Submittal & Shop drawing preparation.
• PIPING Systems -- (Steel, Galvanized, Ductile & Cast iron, Copper, PVC, FPG, UNI pipe, Thermal pipe) . Design, Sizing& Installation for all piping as chilled water pipes, firefighting pipes, domestic &drainage pipes.
• ALL Duct work with all types Round, Spiral, Oval, Rectangular ( GI, Black steel, Stainless steel, Aluminum )complete with all accessories(plenum boxes, dampers, flexible, liner ..), complete with duct sizing & design.
• Fire Fighting Systems -- (including above ground & underground Installation with different fluids as water, Foam, CO2, FM200 & Integrin gases).
• Plumbing Systems - Installation & Design (including internal & external main water supply lines & drainage system, sanitary fixture , sanitary ware).
• Diesel power & steam generator plants and electrical general.
• Water and sewage treatment plants, RO.
• Electrical external &internal (Power & lighting Systems, cable& wire pulling, lightening & grounding, lighting fixtures, wiring device, ………etc)
• Medium voltage sys (including, Switchgear, RMU, Transformer, Generator).
• BMS (building management system).
• Aware of most of international code & Standards (ASHRAE, AMCA, SMACNA, ARI, ASTM, Uniform Plumbing, National plumbing, NFPA, NEC).
Specific duties will include
Estimate and scope MEP trades during pre-construction.
Review Contract Documents, making suggestions/modifications as they relate to the MEP trades.
Manage and lead MEP subcontractors throughout duration of the project (from Groundbreaking through Commissioning and Turnover to Owner).
Monitor the installation and start-up of MEP systems and commissioning of project with Engineer & Owner.
General understanding of Building Codes, Mechanical Codes, Electrical Codes and Plumbing.
Codes as they relate to construction of project.
Monitor the Technical Process generally ensuring the contractor and consultant have fully addressed all issues concerning the provision of and coordination of mechanical services necessary for a fully functional hospital
Review Mechanical Materials and Systems Submittals.
Manage Technical Meetings
Issue Technical Reports and Recommendations on a regular basis
Carry out technical evaluations and design reviews
Review contractor Materials and shop drawings Submittal Registers
Review Bills of Quantity/ Specification checking for errors, omissions and conflicts
Project: Abu Dhabi International Shooting Club Residential & Commercial Compound. Title: Senior Mechanical engineer
Company: THERMO (LLC), ABU DHBI, U.A.E (World’s leading MEP Contractor).
Consultant: ATKIN
Period: Working From January 2010 To Jan, 2012
Project: YAS ISLAND PARKINN & RADSSIN HOTEL @ Abu Dhabi
Title: Senior Mechanical engineer
Company: THERMO (LLC), ABU DHBI, U.A.E (World’s leading MEP Contractor).
Consultant: WSP Consulting Engineers.
Period: Working from January 2007 to January 2010
Jobs Involved:
Specific duties will include
Estimate and scope MEP trades during pre-construction.
Review Contract Documents, making suggestions/modifications as they relate to the MEP trades.
Manage and lead MEP subcontractors throughout duration of the project (from Groundbreaking through Commissioning and Turnover to Owner).
Assist Scheduling department with developing detailed CPM schedules for all MEP installation activities, including cost and resource loading.
Work with Superintendent on project logistics and temporary facility plan.
Review and approve material and equipment for MEP systems prior to installation.
Monitor the installation and start-up of MEP systems and commissioning of project with Engineer & Owner.
Coordinate activities, materials procurement and other related activities with Project Manager and Field Staff.
Communicate progress and prepare appropriate reports as needed.
Represent Bradfield & Gorier in regard to the MEP process at weekly Owner and contractors meetings
Supervise, develop and mentor project staff, if applicable.
Lead and direct the 3-D coordination process to resolve all conflicts prior to start of installations.
Take overall responsibility for the performance of all MEP trades.
Supervise review and coordination of submittals and shop drawings.
Education - Skills - Knowledge - Qualifications & Experience:.
Good understanding of all mechanical, electrical, plumbing and low-voltage systems.
General understanding of Building Codes, Mechanical Codes, Electrical Codes and Plumbing.
Codes as they relate to construction of project.
Monitor the Technical Process generally ensuring the contractor and consultant have fully addressed all issues concerning the provision of and coordination of mechanical services necessary for a fully functional hospital
Review Mechanical Materials and Systems Submittals.
Manage Technical Meetings
Issue Technical Reports and Recommendations on a regular basis
Carry out technical evaluations and design reviews
Review contractor Materials and shop drawings Submittal Registers
Review Bills of Quantity/ Specification checking for errors, omissions and conflicts
Carry out Periodic Site Visits to monitor coordination and quality of work man ship
Project: Abu Dhabi International Shooting Club Residential & Commercial Compound. Title: Senior Mechanical engineer
Company: THERMO (LLC), ABU DHBI, U.A.E (World’s leading MEP Contractor).
Consultant: ATKIN
Period: Working From January 2010 To Jan, 2012
Project: YAS ISLAND PARKINN & RADSSIN HOTEL @ Abu Dhabi
Title: Senior Mechanical engineer
Company: THERMO (LLC), ABU DHBI, U.A.E (World’s leading MEP Contractor).
Consultant: WSP Consulting Engineers.
Period: Working from January 2007 to January 2010
Jobs Involved:
Specific duties will include
Estimate and scope MEP trades during pre-construction.
Review Contract Documents, making suggestions/modifications as they relate to the MEP trades.
Manage and lead MEP subcontractors throughout duration of the project (from Groundbreaking through Commissioning and Turnover to Owner).
Assist Scheduling department with developing detailed CPM schedules for all MEP installation activities, including cost and resource loading.
Work with Superintendent on project logistics and temporary facility plan.
Review and approve material and equipment for MEP systems prior to installation.
Monitor the installation and start-up of MEP systems and commissioning of project with Engineer & Owner.
Coordinate activities, materials procurement and other related activities with Project Manager and Field Staff.
Communicate progress and prepare appropriate reports as needed.
Represent Bradfield & Gorier in regard to the MEP process at weekly Owner and contractors meetings
Supervise, develop and mentor project staff, if applicable.
Lead and direct the 3-D coordination process to resolve all conflicts prior to start of installations.
Take overall responsibility for the performance of all MEP trades.
Supervise review and coordination of submittals and shop drawings.
Education - Skills - Knowledge - Qualifications & Experience:.
Good understanding of all mechanical, electrical, plumbing and low-voltage systems.
General understanding of Building Codes, Mechanical Codes, Electrical Codes and Plumbing.
Codes as they relate to construction of project.
Monitor the Technical Process generally ensuring the contractor and consultant have fully addressed all issues concerning the provision of and coordination of mechanical services necessary for a fully functional hospital
Review Mechanical Materials and Systems Submittals.
Manage Technical Meetings
Issue Technical Reports and Recommendations on a regular basis
Carry out technical evaluations and design reviews
Review contractor Materials and shop drawings Submittal Registers
Review Bills of Quantity/ Specification checking for errors, omissions and conflicts
Carry out Periodic Site Visits to monitor coordination and quality of work man ship
I have completed 3Years as a total experience in the mechanical field and gained a comprehensive experience in Design, Estimation and Execution and installation for all mechanical activities HVAC
Educational Qualifications: B.Sc in mechanical power engineering with general grad good. Graduation project: Design water treatment station with grad very good.