وليد أحمد, Construction Site Manager

وليد أحمد

Construction Site Manager

General Electric - Saudi Arabia

البلد
المملكة العربية السعودية - الخبر
التعليم
بكالوريوس, Civil Engineer
الخبرات
9 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :9 years, 7 أشهر

Construction Site Manager في General Electric - Saudi Arabia
  • المملكة العربية السعودية - الرياض
  • مايو 2018 إلى أكتوبر 2021

Projects:
• Construction of Riyadh Housing Substation 132-13.8 KV #8310
• Construction of Riyadh Housing Substation 132-13.8 KV #8311
• Construction of Rawabi Package, Hulyfa Substation 132-13.8 KV #8921
• Construction of Alrawabi Substation 132-13.8 KV #8199

Duties and Responsibilities:
• Adhered to Quality Control programs/plans/HSE regulations and ensured high quality of performance.
• Developed and implemented a comprehensive and detailed project execution plan covering project objectives, KPIs, contracting strategies, roles & responsibilities, risk, and mitigation plan, RACI chart, detailed project cost & schedule, project control plan, HSSE plan, commissioning & handover plan, etc.
• Experienced in changing management procedures and policies.
• Technical Specifications & Tender Contract Documents.
• Defined and implemented criteria for control and management of the project
• Technical and Administrative Support for Site Supervision and HSE Teams.
• Prepared projects approaches and methodologies to be used in proposals.
• Assigned in preparation of HSE documents, design reports, drawings, BOQ, and technical specifications.
• Prepared the project schedule, and took an active and leading role in the control of time on the projects
• Assigned in the review of Construction/Shop drawings.
• Contributed to the managing of projects issues, budgets, and schedules.
• Gave necessary administrative and technical support to meet the Department’s goals to make sure the company meets its goals.
• Implemented Risk Management technics, including analysis responses, monitoring, and controlling risks.
• Contributed to the implementation of the Department’s objectives and procedures.
• Organized and supervised the site working team and materials flows.
• Ensured that designs were applied correctly and liaised with Clients.
• Took responsibility for security, health, safety, and environmental measures.
• Solved the staff problems.
• Reporting monthly, quarterly, and annually (Progress report including HSE aspects)
• Measurement of quantities BOQ, quantity survey.

Project Civil Engineer في Al Mashariq Trading and Contracting Co.
  • المملكة العربية السعودية - الدمام
  • سبتمبر 2016 إلى أبريل 2018

Projects:
• East Dammam Housing Project (ARAMCO) 115/13.8 K.V Substation. 2016/2018

Duties:

• Exceeded goals through effective task prioritization and a great work ethic.
• Resolved problems, improved operations, and provided exceptional service.
• Led civil works team in the delivery of project, resulting in handling over satisfactory of the client.
• Developed and implemented comprehensive and detailed project execution plan covering project objectives, KPIs, contracting strategies, roles & responsibilities, risk, and mitigation plan, RACI chart, detailed project cost & schedule, project control plan, HSSE plan, commissioning & handover plan, etc.
• Performed duties in accordance with all applicable standards, policies, and regulatory guidelines to promote a safe working environment.
• Served customers in a friendly and Sufficient manner following outlined steps of service.
• Collaborated with Construction Manager and Project Manager to achieve Project objectives.
• Risk Management, including analysis responses, monitoring, and controlling risks.
• Resolved conflicts and negotiated mutually beneficial agreements between parties

QA/QC Civil Engineer في AL MASHARIQ TRADING & CONTRACTING CO.
  • المملكة العربية السعودية - الدمام
  • نوفمبر 2014 إلى سبتمبر 2016

Projects:
• Al Mohandseen 115/13.8 K.V Substation. 2014/2016
• Masel 115/13.8 K.V Substation. 2016

Duties:
• Evaluated components and final products against quality standards and execution specifications.
• Performed field inspections for civil structures, materials, and testing equipment.
• Checked the execution of work, whether project implementation follows the approved plans and specifications.
• Reviewed the Material Technical Data Sheet
• Preparation of Method Statement, ITP, etc.
• Performed quality assurance monitoring and testing as required on materials and site works.
• Prepared, managed, and completed non-conformance reports and recommendations for corrective actions.
• Performed investigations of construction deficiencies or problems and determined the scope of corrective work.
• Provided support, research, and advice on technical details, relating to Civil Engineering matters, prepared all the materials submittals and the site paper works.
• Preparation and issuance of project reports, various quality and detailed test reports

Project Engineer في Saudi Lumat for Advanced contracting
  • المملكة العربية السعودية - الرياض
  • يوليو 2013 إلى يوليو 2014

Projects:
• Replacement of the old water network of Al Nazeem area.
• North Riyadh Hospital main water supply line.
• ITCC main supply lines.

Duties:
• Participated as a part of the proposal team in pre-bid meetings with the client for proposal development.
• Defined the physical scope of the piping effort for the project.
• Defined the piping execution method and the required piping deliverables.
• Prepared a labor hour estimate for the piping effort.
• Prepared a material cost estimate for all piping items.
• Prepared a detailed piping discipline work execution schedule that is coordinated and compatible with the other engineering disciplines.
• Planned all aspects of piping activities.
• Organized electronic or hard-copy data files or data needs.
• Overseed proper resource (people) requisitioning and utilization.
• Recognized and report all scope changes or trends that may cause a cost impact to the project.
• Monitored labor budget expenditure, production, and productivity.
• Prepared prompt and accurate status reports.
• Managed project completion and closeout.

Site Engineer في BAKHIT Construction Co. Ltd.
  • السودان - الخرطوم
  • يناير 2013 إلى مايو 2013

As a site engineer working in a small company is mostly like being a head of a project or by other means a project manager so you are responsible for every single detail of the project, reporting monitoring... etc, and making sure everything is by the book.

Site Engineer. في BROUJ Co. Ltd for industrial services and construction consultants.
  • السودان - الخرطوم
  • نوفمبر 2011 إلى نوفمبر 2012

Managing the site from Supervision, monitoring, checking plans, make sure tasks are achieved on time, reporting ... etc

الخلفية التعليمية

بكالوريوس, Civil Engineer
  • في University of Khartoum
  • أغسطس 2011

I've graduated from the University of Khartoum Faculty of engineering department of civil engineering. A 5 years Bachelor degree with honor in civil engineering, Graduation thesis titled‘’ Design for shear and torsion using different codes’’

Specialties & Skills

Leadership
Civil Engineering
Microsoft Office
Team Management
Microsoft office
Communication and team work
Presentation
Analysis and evaluation
team leader
program management

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

Sudan Engineering Council
  • Member
  • September 2012
Saudi Council of Engineers
  • Engineer
  • October 2013
PMI
  • Member
  • November 2020
APEGS
  • Mebmer
  • November 2020

التدريب و الشهادات

Project Management Professional (الشهادة)
تاريخ الدورة:
December 2020
Risk Management Professional PMI-RMP (الشهادة)
تاريخ الدورة:
September 2021
Academic IELTS (الشهادة)
تاريخ الدورة:
July 2016
General IELTS (الشهادة)
تاريخ الدورة:
September 2018
Drafting of Engineering Projects Contracts (تدريب)
معهد التدريب:
SCE
تاريخ الدورة:
December 2020
المدة:
9 ساعات

الهوايات

  • Listening To Music
  • Video Gaming
  • competitive sports
  • Cooking