Total des années d'expérience: 3 Années, 8 Mois
avril 2010
A juillet 2011
Design Engineer- Site engineer
à Gulf Dredging Company
Lieu :
Koweït - Al Koweït
*Department: Engineering Services.
Projects:
1.Client: Technip/ Khafji Joint Operations (KJO).
Project: Bill of quantities (BOQ) for dredging and trenching for the project: “Construction of Offshore HOUT facilities/Ratawi platform”.
2.Client: Kuwait Gulf Oil Company (KGOC).
Project: Bill of quantities (BOQ) of Earthwork materials volumes, Linepipe materials and associated joint systems for the project:
“KGOC gas and NGL export system project /Offshore part.”
3.Client: Kuwait National Petroleum Company (KNPC).
Project: Preliminary design and method statement for bored piles construction for the project: “New LPG North Tank Farm at KNPC, Mina AL Ahmadi, Kuwait.”
4.Client: Kuwait National Petroleum Company (KNPC).
Project: Identification of ground water details and dewatering system design for the project: “Installation of low Sulphur fuel oil, fuel gas, and gas oil pipelines from MAA to Sabiya and Doha power stations.”
5.Client: Heavy Engineering Industries and Shipbuilding Co. (HEISCO)
Project: Preliminary Design of Guide Piles for Hover On and Hover off Floating Pontoon.
6.Client: Gulf Dredging Company (Marine Operations Department).
Project: Preliminary Design of marine vertical caisson for Support of
Phase 3 excavation works for the project: “Construction of
Coast Guard Station at Umm Bab, State of Qatar.”
7.Client: Gulf Dredging Company (Marine Operations Department).
Project: Preliminary environmental impact assessment (EIA) for the
removal of temporary marine embankments for the project:
“Mubarak Sea Port Project (Boubiyan Island project).”
8. Client: Kuwait Oil Company (KOC).
Project: Civil/ Architectural/ Structural/HVAC B.O.Q for the project: “Construction of New Substation in Burgan Area, Ahmadi Area and Umm Al Eish Area”
Site/Quality Control engineer for the project: “Construction of marine coast Guard station at Umm Bab, State of Qatar for the ministry of interior and ministry of defense.”
Projects:
1.Client: Technip/ Khafji Joint Operations (KJO).
Project: Bill of quantities (BOQ) for dredging and trenching for the project: “Construction of Offshore HOUT facilities/Ratawi platform”.
2.Client: Kuwait Gulf Oil Company (KGOC).
Project: Bill of quantities (BOQ) of Earthwork materials volumes, Linepipe materials and associated joint systems for the project:
“KGOC gas and NGL export system project /Offshore part.”
3.Client: Kuwait National Petroleum Company (KNPC).
Project: Preliminary design and method statement for bored piles construction for the project: “New LPG North Tank Farm at KNPC, Mina AL Ahmadi, Kuwait.”
4.Client: Kuwait National Petroleum Company (KNPC).
Project: Identification of ground water details and dewatering system design for the project: “Installation of low Sulphur fuel oil, fuel gas, and gas oil pipelines from MAA to Sabiya and Doha power stations.”
5.Client: Heavy Engineering Industries and Shipbuilding Co. (HEISCO)
Project: Preliminary Design of Guide Piles for Hover On and Hover off Floating Pontoon.
6.Client: Gulf Dredging Company (Marine Operations Department).
Project: Preliminary Design of marine vertical caisson for Support of
Phase 3 excavation works for the project: “Construction of
Coast Guard Station at Umm Bab, State of Qatar.”
7.Client: Gulf Dredging Company (Marine Operations Department).
Project: Preliminary environmental impact assessment (EIA) for the
removal of temporary marine embankments for the project:
“Mubarak Sea Port Project (Boubiyan Island project).”
8. Client: Kuwait Oil Company (KOC).
Project: Civil/ Architectural/ Structural/HVAC B.O.Q for the project: “Construction of New Substation in Burgan Area, Ahmadi Area and Umm Al Eish Area”
Site/Quality Control engineer for the project: “Construction of marine coast Guard station at Umm Bab, State of Qatar for the ministry of interior and ministry of defense.”