Senior Mechanical Engineer .
Bouygues Construction
مجموع سنوات الخبرة :10 years, 1 أشهر
Managing all the ventilation works.
* Review drawing, composite drawing and Method Statement.
* Carry out the specified inspection /test in accordance with relevant inspection.
* Installation of all equipment connections and specification DESICCANT WHEELS, AHU, EXFAN, SMOKE FAN, HEPA FILTER, FCU etc…)
* Monitor progress of work against construction program to ensure that the progress is accordance to the construction program.
* Monitor control, and coordinate the works of different subcontractors and report
on their progress or trends for problem delay to the management
* Ensure that no work is submitted for inspection unless it is complete and complies with all specified requirements and maintain daily site event for management.
-Installation ducted FCU, AHU, ERU, TAHU, EXHAUST FAN, Chilled water pipe
-Design and calculate HVAC systems with shop drawings.
Fire protection system:
- installation fire pumps with connection to water tank
- Design and calculate F.F shop drawing
Water supply and sewer system:
- Installation the underground system and all networks
- Installation the underground system and all networks
- Making water test for all the system
Work Performances:
- Supervision For Workers
- Material Take off
- Revision Shop drawing
- Shop drawing
Installation ducted FCU, AHU, ERU, TAHU, EXHAUST FAN, Chilled water pipe
-Design and calculate HVAC systems with shop drawings.
Fire protection system:
- installation fire pumps with connection to water tank
- Design and calculate F.F shop drawing
Water supply and sewer system:
- Installation the underground system and all networks
- Installation the underground system and all networks
- Making water test for all the system
Since 6th
August 2004 till 14th
Lead Of Ventilation System
Duration : 10th
Of March 2015 Till 31st. December 2016
Work Performances:
Managing all the ventilation works.
* Review drawing, composite drawing and Method Statement.
* Carry out the specified inspection /test in accordance with relevant inspection.
* Installation of all equipment connections and specification DESICCANT WHEELS,
AHU, EXFAN, SMOKE FAN, HEPA FILTER, FCU etc…)
* Monitor progress of work against construction program to ensure that the
progress is accordance to the construction program.
* Monitor control, and coordinate the works of different subcontractors and report.
on their progress or trends for problem delay to the management
* Ensure that no work is submitted for inspection unless it is complete and complies
with all specified requirements and maintain daily site event for management.