waqar ahmed, OPERATION FOREMAN

waqar ahmed

OPERATION FOREMAN

ADCO

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, SCIENCE
Expérience
22 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :22 years, 4 Mois

OPERATION FOREMAN à ADCO
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis juillet 2010

I am currently working at ASAB Oil Field producing 300000 Barrel/day crude oil.
DCS
Wellhead Operation
Central Degassing Station Operation
Remote Degassing Station
Well Testing Separator Operation
HP Three Phase Separation Unit.
LP Three Phase Separation Unit.
Oil storage tanks
Main Oil Line Pumps
Fuel gas system.
MPFM (multiphase fluid meters) Operations
Pigging Operation
Gas Lift well operation.
Responsible to implement HSE policies & Standards during routine activities.
Supervision of safe and efficient start-up and shutdown of process plant and equipment.

FFD Project (In ADCO Full Field development Commissioning of Oil processing facility of 600000 BOPD and Gas injection facility of 50 MMSCFD is going on and I have the active role n responsibilities for smooth execution of all project activities n development and making sure of compliance of PTW system.)

Operation Technician à BHP Billiton
  • Pakistan
  • février 2009 à juin 2010

I have been worked at Zamzama gas field Producing 450 MMSCFD of gas and 2400 Barrel/day of condensate.
Above Company have ISO 9001:2000, OHSAS 18001:1999 and ISO 14001:2004 certification
 CO2 and Aromatics Removal Unit with Shell Sulfinol-D (Dipa, Sulfilane, water).
 Dehydration Unit Molecular Sieves System.
 Power Turbine of Centaur-40 (Gas Turbine driven generator).
 Gas turbine driven compressor by Solar.
 Osmoflo R.O unit demineralized water package.
 Thermal Oxidizer for off gases.
 Hot water system.
 Raw Gas Cooling and Separation Unit.
 HDPU (Hydro carbon dew point unit).
 Condensate Stabilization unit through HP & LP Flash Drum
 HP & LP Fuel gas system
 HP Flare System
 Wellhead Area and gas inlet manifold.
 Condensate storage and loading.
 Fire water system.

CONTROL ROOM OPERATOR à TULLOW OIL
  • Pakistan
  • février 2007 à janvier 2009

Sour Gas (H2S) Removal unit (using MDEA)
Acidic Gases (H2S+CO2) removed from Natural Gas,
Absorption(H2S+CO2) Absorber equipped with Bubble cap trays, 50% Amine concentration & 50% DMW,
Flashing Inert Gases flash out at Low pressure flash vessel, Stripping (H2S+CO2) Stripper with 02 beds of pall rings,
Amine Reboiler Hot oil used as heat source for steam generation which utilized in stripper,
PD pumps, Aerial Cooler, Sock/Carbon Filters
Dehydration Unit (using Tri-Ethylene Glycol)
Absorption Counter current Absorber equipped with Bubble cap trays
Flashing Inert Gases flash out at Low pressure flash vessel.
Glycol Reboiler Fire Tube reboiler Purified NG used as combustion source
Sour Water Treatment Unit consist of Flash Vessel, reboiler & stripping column
Hot Oil system
Direct Fire Furnace with BMS controlling system, Synthetic Oil used as heat Medium for Amine & sour water Reboiler.

PROCESS OPERATOR à FFC
  • Pakistan
  • janvier 2002 à janvier 2007

Plant is licensed by Holder Topsoe, Denmark and is facilitated with DCS (Honeywell) and PLC based Emergency Shutdown System.
Company has ISO 9001:2000, OHSAS 18001:2007 and ISO 14001:2004 certification.
Desulphurization section (ZnO catalyst to remove Organic/Inorganic Sulphur)
Reforming Section
Primary Reformer (Steam reforming induced draft furnace side wall mounted 384 burners)
Secondary Reformer (Auto thermal reforming)
Waste heat boilers (producing 130 ton/hr KS steam) Waste heat recovery coils
CO Shift conversion (Using Copper oxide Catalyst) Medium / Low temperature CO shift converters
Acid Gas Removal unit (Using aMDEA)
CO2 is absorbed into METHYLE DI ETHANOL AMINE solution containing, 37% MDEA, 03%Piperazine and balance is Water (DMW). This section is removing about 32000 NMC Carbon dioxide gas per hour.
Counter current absorption in a packed tower containing 05 beds of CS (IMTP) rings. MDEA Flow 1925 m3/hr. Operating Pressure 27 kg/cm2
FLASH VESSELS: 02 HP/LP Packed single bed Flash Drums for inertgases and CO2 Flashout.
STRIPPER /REBOILER
Semi lean solution is regenerated into lean solution in double bed PALL RINGS packed tower with hot Process Gas MDEA REBOILER support.Section also includes heavy duty CENTRIFUGAL MDEA Pumps and Rich Solution (ENERCON) HYDRAULIC Turbine, Double Stage Piston Type Compressor & Methane Converter.

Éducation

Baccalauréat, SCIENCE
  • à SALU
  • décembre 1998

B.Sc

Specialties & Skills

Project Work
Plant Commissioning
Day to day Operations
PERMIT TO WORK
Fire fighting Training
Sour Gas Treatment Plant Pre-commissioning, commissioning
Oil Separation & Desalter Plant Pre-commissioning, commissioning Activities
Gas Testing

Langues

Anglais
Moyen

Formation et Diplômes

Apperenticeship Training As a Process Plant Operator (Certificat)
Date de la formation:
January 2000
Valide jusqu'à:
January 2002
FIRE FIGHTING (Certificat)
Date de la formation:
September 2010
Valide jusqu'à:
September 2010
H2S & BA (Certificat)
Date de la formation:
April 2012
Valide jusqu'à:
April 2012
GAS TESTING (Certificat)
Date de la formation:
September 2010
Valide jusqu'à:
September 2010
PTW (Certificat)
Date de la formation:
August 2010
Valide jusqu'à:
August 2010
GAS PROCESSING (Certificat)
Date de la formation:
July 2012
Valide jusqu'à:
July 2012